ML20138Q38713 December 1985Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance
ML20127N39431 January 1985Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan
ML20127N38931 January 1985Rev 1 to Midland Energy Ctr Project Shutdown PlanNon-Destructive Examination
Coatings
Minimum staff
Fire Protection Program
Fire Watch
Scaffolding
ML20092C85415 June 1984Midland Idcvp Auxiliary Feedwater Sys Performance RequirementsSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Earthquake
Turbine Missile
ML20093D21330 April 1984Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes
ML20084E17027 April 1984Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2
ML20081C4037 March 1984Plan to Conduct Independent Mgt Appraisal of Midland Nuclear ProjectProbabilistic Risk Assessment
Earthquake
Backfit
ML20081A59926 August 1983Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies
ML20081A61426 August 1983Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions
ML20081A62626 August 1983Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts
ML20078K2845 August 1983Rev 1 to third-party Const Implementation Overview Approval
ML20078K2945 August 1983Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting
ML20078K3065 August 1983Rev 1 for third-party Const Implementation Overview Re QA Plan
ML20078K27821 July 1983Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports
ML20024F61115 July 1983Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program.Safe Shutdown
Probabilistic Risk Assessment
Coatings
Earthquake
Liquid penetrant
Scaffolding
Backfit
Flow Induced Vibration
ML20024F61715 July 1983Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program.Probabilistic Risk Assessment
ML20080A2525 July 1983Rev 1 to Third-Party Const Implementation Overview Procedure
ML20077D5275 July 1983Rev 1 to Third-Party Const Implementation Overview
ML20072L24130 June 1983Offsite Dose Calculation Manual for Midland PlantGrab sample
Offsite Dose Calculation Manual
ML20024C09430 June 1983Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage.
ML20024B62227 June 1983Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment.
ML20078K27027 June 1983Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment
ML20072J46810 June 1983Rev 1 to Const Completion Program. Viewgraphs EnclScaffolding
ML20072J47810 June 1983Rev 2 to Quality Verification ProgramHydrostatic
Coatings
ML20076G0406 June 1983Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy CtrSafe Shutdown Earthquake
Earthquake
ML20072A8503 June 1983Const Completion ProgramScaffolding
ML20076G2431 June 1983Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs
ML20076G2591 June 1983Rev 1 to ATP-10-Q, Procedure for Document Control
ML20076G2211 June 1983Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members
ML20076G2041 June 1983Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits
ML20076G1391 June 1983Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures
ML20076G1211 June 1983Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets
ML20076G1061 June 1983Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members
ML20076G0941 June 1983Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions
ML20076G0851 June 1983Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel
ML20076G0671 June 1983Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control
ML20072B2521 June 1983Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys
ML20076G2671 June 1983Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances
ML20076G25226 May 1983Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance
ML20076G13726 May 1983Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence
ML20023D52018 May 1983Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201.Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Emergency Lighting
Tornado Generated Missile
ML20071D6169 March 1983Reactor Protection Sys Setpoint Methodology
ML20071D6379 March 1983Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment
ML20072B2039 February 1983Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages EnclSafe Shutdown
Non-Destructive Examination
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
ML20071D9272 February 1983Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump
ML20071D9362 February 1983Rev 1 to Hydraulic Snubbers
ML20071D9032 February 1983Rev 1 to Reactor Bldg Spray Sys Centrifugal PumpFLEX
Loctite
ML20076G18428 January 1983Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation
ML20076G16528 January 1983Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program
ML20069Q41325 October 1982to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel