Issue date | Title | Topic | |
---|---|---|---|
ML20138Q387 | 13 December 1985 | Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance | |
ML20127N394 | 31 January 1985 | Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan | |
ML20127N389 | 31 January 1985 | Rev 1 to Midland Energy Ctr Project Shutdown Plan | Non-Destructive Examination Coatings Minimum staff Fire Protection Program Fire Watch Scaffolding |
ML20092C854 | 15 June 1984 | Midland Idcvp Auxiliary Feedwater Sys Performance Requirements | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Earthquake Turbine Missile |
ML20093D213 | 30 April 1984 | Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes | |
ML20084E170 | 27 April 1984 | Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 | |
ML20081C403 | 7 March 1984 | Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project | Probabilistic Risk Assessment Earthquake Backfit |
ML20081A599 | 26 August 1983 | Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies | |
ML20081A614 | 26 August 1983 | Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions | |
ML20081A626 | 26 August 1983 | Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts | |
ML20078K284 | 5 August 1983 | Rev 1 to third-party Const Implementation Overview Approval | |
ML20078K294 | 5 August 1983 | Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting | |
ML20078K306 | 5 August 1983 | Rev 1 for third-party Const Implementation Overview Re QA Plan | |
ML20078K278 | 21 July 1983 | Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports | |
ML20024F611 | 15 July 1983 | Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. | Safe Shutdown Probabilistic Risk Assessment Coatings Earthquake Liquid penetrant Scaffolding Backfit Flow Induced Vibration |
ML20024F617 | 15 July 1983 | Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program. | Probabilistic Risk Assessment |
ML20080A252 | 5 July 1983 | Rev 1 to Third-Party Const Implementation Overview Procedure | |
ML20077D527 | 5 July 1983 | Rev 1 to Third-Party Const Implementation Overview | |
ML20072L241 | 30 June 1983 | Offsite Dose Calculation Manual for Midland Plant | Grab sample Offsite Dose Calculation Manual |
ML20024C094 | 30 June 1983 | Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage. | |
ML20024B622 | 27 June 1983 | Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment. | |
ML20078K270 | 27 June 1983 | Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment | |
ML20072J468 | 10 June 1983 | Rev 1 to Const Completion Program. Viewgraphs Encl | Scaffolding |
ML20072J478 | 10 June 1983 | Rev 2 to Quality Verification Program | Hydrostatic Coatings |
ML20076G040 | 6 June 1983 | Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr | Safe Shutdown Earthquake Earthquake |
ML20072A850 | 3 June 1983 | Const Completion Program | Scaffolding |
ML20076G243 | 1 June 1983 | Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs | |
ML20076G259 | 1 June 1983 | Rev 1 to ATP-10-Q, Procedure for Document Control | |
ML20076G221 | 1 June 1983 | Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members | |
ML20076G204 | 1 June 1983 | Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits | |
ML20076G139 | 1 June 1983 | Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures | |
ML20076G121 | 1 June 1983 | Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets | |
ML20076G106 | 1 June 1983 | Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members | |
ML20076G094 | 1 June 1983 | Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions | |
ML20076G085 | 1 June 1983 | Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel | |
ML20076G067 | 1 June 1983 | Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control | |
ML20072B252 | 1 June 1983 | Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys | |
ML20076G267 | 1 June 1983 | Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances | |
ML20076G252 | 26 May 1983 | Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance | |
ML20076G137 | 26 May 1983 | Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence | |
ML20023D520 | 18 May 1983 | Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Tornado Generated Missile |
ML20071D616 | 9 March 1983 | Reactor Protection Sys Setpoint Methodology | |
ML20071D637 | 9 March 1983 | Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment | |
ML20072B203 | 9 February 1983 | Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl | Safe Shutdown Non-Destructive Examination Probabilistic Risk Assessment Coatings Nondestructive Examination |
ML20071D927 | 2 February 1983 | Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump | |
ML20071D936 | 2 February 1983 | Rev 1 to Hydraulic Snubbers | |
ML20071D903 | 2 February 1983 | Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump | FLEX Loctite |
ML20076G184 | 28 January 1983 | Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation | |
ML20076G165 | 28 January 1983 | Rev 1 to ATP-4-Q, Procedure for Providing Mgjec QA Program | |
ML20069Q413 | 25 October 1982 | to QA Dept Procedure B-3M-1, Qualification & Certification of Insp & Test Personnel |