Forwards Rev a to Upgraded Eals, Based on Methodology Outlined in NUMARC/NESP-007
ML20083K650
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 05/04/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083K655 List:
References
NUDOCS 9505150051
Download: ML20083K650 (3)


Text

.

Ctition sup; ort OcpIrtmsnt a

PECO ENERGY T5 4Lt:am 965 Chesterbrook Bou;eva*d Wayne, PA 19087-5691 May 4,1995 Docket Nos. 50-277 50-278 50452 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk i I

Washington, DC 20555 Suoject: Peach Bottom Atornic Power Station, Units 2 and 3 Limerick Genere+!rg Station, Units 1 and 2 Implementatir,o " wargency Action Levels Developed frw : ,cAARC/NESP-007 Methodology Gentlemen:

Enclosed for your review and approval is PECO Energy Company's Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Umerick Generating Station (LGS), Units 1 and 2, Emergency Action Levels (EALs) and Technical Basis Manuals which are based on the methodology outlined in NUMARC/NESP-007, " Methodology for Development of Emergency Action Levels."

I The EALs have been reviewed by the PBAPS and LGS Plant Operations Review Committees (PORCs), as required by 10CFR50.54(q), and were determined not to decrease the effectiveness j of the Nuclear Emergency Plan (EP). However, due to the NRC's endorsement of NUMARC/NESP-007 as documented in Revision 3 to Regulatory Guide 1.101, " Emergency Planning and Preparedness for Nuclear Power Plante," dated August 1992, we are requesting prior NRC approval for implementation of the EALs at PBAPS and LGS.

In order to support the NRC's review of the Technical Basis Manuals, the following information is enclosed.

o Enclosure 1

- PBAPS Upgraded EAL Technical Basis Manual.

- PBAPS EAL Table.

- PBAPS Upgraded EAL NUMARC Comparison.

9505150051 950504 hDR ADOCK 05000277 PDR d

i\ i 1

x. . . . . . . . - .

?

1 May 4,1995 Page 2' ,

L o Enclosure 2

- LGS Upgraded EAL Technical Basis Manual.

- LGS EAL Table.

- LGS Upgraded EAL NUMARC Comparison.

The enclosed EAL Technical Basis Manuals and supporting documentation have been reviewed .

with the States and counties within the Emergency Planning Zones (EPZs) for PBAPS and LGS.

These EAls wil not be implemented unti completion of the NRC's review and approval, and l unti initial training is completed.

t Changes to the Nuclear EP resulting from implementation of revised EALs wRI be performed in accordance with the requirements of 10 CFR 50.54(q).

We are requesting that the NRC review and approve the EAL Technical Basis Manuals for PBAPS, Units 2 and 3, and LGS, Units 1 and 2, which incorporate the NUMARC/NESP-007 guidelines by October 31,1995, in order to faclitate training of the appropriate Emergency Response Organization (ERO) personnel by the end of March 1996.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, ,

G. A. Hunger, Jr.

Director - Licensing l Enclosures cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ enclosures)

W. L Schmidt, USNRC Senior Resident inspector, PBAPS (w/ enclosures)

)

i l

l 1

. . . . ., .=. -. - -- ._-

l i

l l

ENCLOSURE 1 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 EMERGENCY ACTION LEVEL SUPPORTING DOCUMENTATION f