Forwards Rev 2 to Evacuation Estimates within Plume Exposure Pathway Emergency Planning Zone for Braidwood Nuclear Generating Station
ML20077N007
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/10/1995
From: Saccomando D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077N010 List:
References
NUDOCS 9501130262
Download: ML20077N007 (2)


Text

m ~

3

[ 'N Commonwealth Edison z' 1400 Opus Place ' *

( ~ ) Downers Grove. Enois 80515 January 10,1995 U.S. Nuclear Regulatory Commission Washington, D.C. 20 255 Attn: Document Control Desk

Subject:

Braidwood Station Units 1 and 2 Braidwood Evacuation Time Estimate NRC Docket Nos. 50-456 and 50-457 Comed has developed an updated evacuation time estimate for Braidwood Nuclear Station Units 1 and 2 This letter transmits the updated Braidwood Evacuation Time Estimate Stuh, dated September,1994, as an enclosure. In addition, Comed has provided the updated study to FEMA Region V for their approval.

Comed utilized the Federal Emergency Management Agency (FEMA)/NRC Interactive Dynamic Evacuation (IDYNEV) model to develop the evacuation time estimates presented in the Enclosure. This model is used to evaluate accident scenarios for natural and technological hazards. The data used in developing this study were based on the 1990 census, field verification for road network characteristics, and special facility interviews.

The updated study has been prepared in coordination with the State ofIllinois ,

Emergency Management Agency pereonnel. This study was reviewed in Illinois by Grundy County Emergency Services Disaster Agency (ESDA), Kankakee County ESDA, Will County Emergency Management, State ofIllinois Emergency Management Agency (IEMA), and Illinois Department of Nuclear Safety (IDNS) officials.

Comed has reviewed the updated Braidwood Evacuation Time Estimate Study, dated Septembr,1994,in accordance with Comed procedures. These reviews have indicated that the updated Evacuation Time Estimate, as a change to the generic Generating Stations Emergency Plan (GSEP), does not decrease the effectiveness of the generic GSEP, and the revised plan continues to meet the requirements of 10CFR50.47(b) and 10CFR50 Appendix E. As such, Comed may make the change to the Generic GSEP without prior NRC approval. i

, k:nlasbrwd: evac.wpf31 9501130262 950110  : a. , 1 b 6f (T d PDR ADOCK 05000456 g g b L, L" J p PDR ;gg

..s.

{

.t .

. -% 't *.

J f

' U.S. NRC January 10,1995 In'accordance with 10CFR50.4(b)(5), Comed is providing two (2) copies of the  !

updated Braidwood Evacuation Time Estimate Study, dated September,1994, to l 4 the Regional Office, and one (1) copy to the NRC Resident Inspector. I 1

If you have any questions in regards to the updated study, please contact Jerry [

DeYoung at (708) 663-6644.  !

l i

Sincerely, Y nf l

Denise Saccoln do [

Nuclear Licensing Administrator l

l Enclosure -

cc: J.W. McCormick-Barger - Section Chief, Region III  !

R. Assa, Project Manager, NRR - w/o attachment  !

l' S.D. DuPont, Senior Resident Inspector  ;

S. Rifkind - FEMA Region V - w/o attachment l i

i I

f k

i i

I 1

I I

k:nla:brwd:evae.wpf:2  ;