Monthly Operating Repts for Mar 1994 for San Onofre Nuclear Generating Station Units 2 & 3
ML20065J630
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/31/1994
From: Marsh W, Robinson M
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404180342
Download: ML20065J630 (13)


Text

,

L ., 4 ; '.

  • e a F"$5?

Southern California Edison Company 23 PARKEH G1HEET HW6NE, CAL tr'OHNIA 92718 April 12, 1994 WAWEH C. MARSH _

MANAGE N OF NUCL.E AM Ftt-Clut.ATOHY AFF AiHb (F I d) 464 4403 '

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos.-50-361 and 50-362 Monthly Operating-Reports for March 1994 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for.the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges'to' safety valves; any changes to the Offsite Dose calculation Manual (ODCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within SK) days from the time the changes were made effective.

This letter. transmits the March 1994 Monthly operating Reports for Units 2 and 3, respectively. There were no' challenges to safety valves, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

.If you require any additional information, please-let me know.

Sincerely, ape &

Enclosures cc: L. J. Callan, Regional Administrator, NRC Region-IV K. E. Perkins, Jr., Director, Walnut Creek ~ Field Office, NRC Region IV M. B. Fields, NRC Project' Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 1, 2 & 3

, I h

9404teo342 940331 i l-PDR ADOCK 05000361

,R,.- PDR

. ', 1 4

.' ' i i

I Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _}0-361 UNIT NAME: SONGS - 2 l DATE:

COMPLETED BY: M. A. Robinson TELEPHONE: (714) 368-9418 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatino Station, Unit 2
2. Reporting Period: March 1994
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating'(liet MWe): 1070
6. Maximum Dependable capacity (Gross MWe): 1127
7. Maximum Dependable capacity (Net MWe): 1070 j
8. If Changes occur In capacity Ratings (Items Number 3 Through 7) ]

Since Last Report, Give Reasons: NA -

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 2,160.00 93,097.00
12. Number of Hours Reactor Was Critical 744.00 2,160.00 70,174.59__
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 2.160.00 69,031.34
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2,404,368.26 7,078,850.70 225,653.107.14
17. Gross Electrical Energy Generated (MWH) 834,611.50 2,441,125.50 76,528,913.50
18. Net Electrical Energy Generated (MWH) 795,016.00 2,327.754.00 72,582,452.80
19. Unit Service Factor 100.00% 100.0Q1 74.15%
20. Unit Availability Factor 100 921 100.0Q1 74.15%

)

21. Unit Capacity Factor (Using MDC Net) 99.87% 100.72% 72.86% '
22. Unit capacity Factor (Using DER Net) 99.87% 100.72% 72.86%-
23. Unit Forced Outage Rate .

0.00% 0.00% 6.00%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shutdown At End Of Report Period, Estimated Date of Startup NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved  :

INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL. OPERATION NA NA 2

1

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361-UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: M. A. Robinson TELEPHONE: f714) 368-9418 HONTH: March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1074.46 16 1078.83 2 1082.13 17 1078.50' 3 1081.83 18 1078.17 4 1080.88 19 1077.17 5 1071.50 20 1076.63 6 1078.04 21 1076.00 7 1077.25 22 1076.21 8 1077.13 23 1076.29 t

9 1078.29 24 1076.25 10 ,

1078.50 25 1051.00 11 1080.83 26 809.83 12 _

1077.33 27 1039.83-13 1084.21 28 1085.13 14 1084.96 29 1085.83 15 1082.08 30 1084.96 31 1085.63 l

l 3 l 1

~

i e

a

~~

Document Control Desk UNIT SHUTDCNNS AND POWER PEDUCTIcNS DOCKET NO: 50-361 ',

UNIT NAME: SONGS - 2 .-

REPORT MONTH: March 1994 DATE:

COMPLETED BY: M. A. Robinson TELEPHONE: (714) 368-9418 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type 2 (Hours) Reason 2 Reactor

  • No. Code' Code' Prevent Recurrence KE P Power reduction for circulating 84 03/26/94 S N/A B 5 N/A water pump 2MPil8 maintenance.

2 F-Forced ' Reason:

2 Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. 'IEEE Std 803A-1983 C-Refueling. 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month

.F-Administrative 5-Reduction in the Average.

G-Operational-Error (Explain) Daily Power Level of more H-Other (Explain)~ than 20% from the previous day 6-Other (Explain) 4

_ _ - . _ _ _ _ _ _ . _ - _ _ _ _ _ _ _ - _ - _ _ - . _ _ _ -. _ - . - _ w

}

a Document Control Desk SUte4ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: M. A. Egbinson TELEPHONE: f7141 368-9418 Date lima Event March 01 0001 Unit is in Mode 1, 98% reactor power, 1130 MWe.

March 25 2010 Commenced lowering reactor power to 80% for circulating water system heat treatment 2300 Unit is at 80% reactor power, 885 MWe.

March 26 1020 Completed circulating water system heat treatment.

1310 Commenced lowering reactor power to 75% to remove circulating water pump 2MP118 from service for electrical maintenance.

1340 Unit is at 75% reactor power.

March 27 0010 Commenced raising reactor power to full power after completion of circulating water pump 2MP118 electrical maintenance.

0810 Unit is at 98% reactor power, 1135 MWo.

March 31 2400 Unit is in Mode 1, 98% reactor power, 1140 MWe.

l l

l 1

5 l

1

. l l

Document Control Desk i

REFUELING INFORMATION l

DOCKET NO: 50-361 I UNIT NAME: E JGS - 2 DATE: I COMPLETED BY: M. A. Robinson i TELEPHONE: (714) 368-9418 J

MONTH ' March 1994

1. Scheduled date for next refueling shutdown.

Cycle 8 refueling outage is forecast for January 15, 1995. ,

l

2. Scheduled date for restart following refueling.

Restart from Cycle 8 refueling outage is forecast for March 31, 1995.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Unknown at this time for Cycle 8 refueling.

What will these be?

NA

4. Scheduled date for submitting proposed licensing action and supporting information.

NA

5. Important licensing considerations associated with refueling,.e.g. new or.

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None.

j l

l i

'i

.'I ll 6

4 l

f Document Control Desk REFUELING INFORMATION DOCKET NO:' 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY M. A. Robinson TELEPHONE: f714) 368-9418 MONTH: March 1994

6. The number of fuel assemblies, a) In the core. 217 b) In the spent fuel storage pool. 662 Total Fuel Assemblies 592 Unit 2 Spent Fuel Assemblies 0 Unit 2 New Fuel Assemblies-70 Unit 1 Spent Fuel Assemblies
7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage ,

. pool assuming present capacity.

Approximately 2005 (full off-load capability)

Y l

l i

7

9 Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-362 l UNIT NAME: SONGS - 3 l DATE: l COMPLETED BY: M. A. Robinson TELEPHONE: (714) 368-9418 QPERATING STATUS

1. Unit Name San Onofre Nuclear Generatino Station, Unit 3
2. Reporting Period: March 1994
3. Licensed Thermal Power (HWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Dealgn Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1080
8. If Changes occur In capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any NA This Month Yr.-to-Date Cumulative 744.00 2.160.00 87,648.00
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 744.00 2,160.00 68,055,45
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 Hours Generator on-Line 744.00 2,160.00 66.456.89 14.
15. Unit Reserve Shutdown Houre 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2.403,396.03 6,915,662.24 213.587,451.96 Gross Electrical Energy Generated (HWH) 840,848.00 2.375,384.50 72,518.791.50
17. 68,514,464.94
18. Net Electrical Energy Generated (MWH) 796.888.00 __2.251,426.00
19. Unit Service Factor 100.00% 100.00% 75.82%
20. Unit Availability Factor 100.00% 100.00% 75.82%
21. Unit Capacity Factor (Using MDC Net) 99.17% 96.51% 72.38%
22. Unit capacity Factor (Using DER Net) 99.17% 96.51% 77.38%
23. Unit Forced Outage Rate 0.00% 0.091 6.68%
24. Shutdowns Scheduled Over Next 6 Montne'(Type, Date, and Duration of Each):

None

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Unite In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 8

- = "

a $ .

Document Control. Desk

' AVERAoE DAILY UNIT FOWER LEVEL DOCKET NO: 50-362 UNIT NAME: SONGS -3 DATE:

COMPLETED BY: _g2 A. Robinson TELEPHONE: f714) 368-9418 MONTH: March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER. LEVEL (MWe-Not) (MWo-Net) 1 1069.13 16 1071.04 2 1076.13 17 1064.67 3 1075.63 18 1072.58 4 1065.63 19 1054.58 5 1059.75 20 1072.79 6 1072.08 21 1071.25 7 1073.33 22 1071.67 h

8 1074.54 23 1057.04 9 1074.50 24 1075.54 10 1074.50 25 1072.75 11 1073.42 .26 1070.92 12 1070.33 27 1073.58-13 1069.79 28 1076.17 14 1074.88 29 1074.88 15 1072.96 30 1073.83 31 1073.79 1

i 9

Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-362 '

UNIT NAME: SONGS ' -

REPORT MONTH: March 1994 DATE:

COMPLETED BY: M. A. Robinson TELEPHONE: (714) 368-9418 -

Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2 Reactor

  • No. Code' Code' Prevent Recurrence There were no unit shutdowns or reductions in the Average Daily Power Level of more than 20% this reporting period.

4 2F-Forced 2 Reason: 3 Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. 'IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month ~

F-Administrative 5-Reduction in the Average G-Operational Error.(Explain) Daily Power. Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) 10

e Documen+. Control Desk StA44ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY M. A. Robinson TELEPHONE: f714) 368-9418 _

Date Ilme Event March 01 0001 Unit is in Mode 1, 97.5% reactor power, 1123 MWe.

March 31 2400 Unit is in Mode 1, 98% reactor power,.1124 MWo.

1 I

l l

11 .

I

! I

~

l Document Control Desk l

\

i REFtTELING INFoRMATIoN DOCKET NO: J2-3%. _;_

UNIT NAME: SOthi? - 3 DATE:

COMPLETED BY: M. A. Robinson TELEPHONE: (714) 368-9418 MONTH: March 1994

1. Scheduled date for next refueling shutdown.

Cycle 8 refueling outage is forecast for June 9, 1995. ,

2. Scheduled date for restart following refueling.

Restart from Cycle 8 refueling outage is forecast for August 18, 1995.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Unknown at this time for Cycle 8 refueling.

What will these be?

NA

4. Scheduled date for submitting proposed licensing action and supporting information.

NA l

l l

-l l

~1 12  ;

I

  • '.e B

Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: .M. A. Robinson TELEPHONE: (714) 368-9418 MONTH: __ _ March 1994

5. Impe-tant licensing considerations associated with refueling, e.g. new or di. ent fuel design or supplier, unreviewed design or performance analysis mett. , significant changes in fuel design, new operating procedures.

None.

6. The number of fuel assemblies, a) In the core. 217 .

b) In the spent fuel storage pool. 710 Total Fuel Assemblies 592 Unit 3 SDent Fuel Assemblies O Unit 3 New Fuel Assemblies ,

118 Unit 1 SDent Fuel As.ggmblies r

7. Licensed spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. nob 2_
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2003 (full off-load capability).

13