MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
r:
, Georgia Power Company
- , 40 inverrms Center Parkway Post Offce Box 1295
- Birr6ingham, Alabama 35201 Telephone 205 877 7279 J. T. Beckham, Jr. Georgia Power c
A Vice Prosident Nuclear Hatch Project the scurrem dectr:c system April 12, 1994 Docket Nos. 50-321 HI,4561 50-366 000005 U.S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Monthlv Opemting Reports Gentlemen:
Enclosed are the March 1994 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant - Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with the requirements of Technical Specification 6.9.1.10. l Sincerely,
'}/ 'q J. T. Beckham, Jr.
SRP/sp
Enclosures:
- 1. March Operating Report for Plant Hatch - Unit 1
- 2. March Operating Report for Plant Hatch - Unit 2 c: (See next page.)
,I 9404100320 940331 PDR ADOCK 05000321 (( 1.
R PDR
Georgia Power 1 U.S. Nuclear Regulatory Commission Page 2 April 12, 1994 c: Georeia Power Cornvany Mr.11. L Sumner, Nuclear Plant General Manager NORMS U.S. Nuclear Regulatory Commission. Washincton. D.C.
Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Regulatory Commission. Reelon 11 Mr. S. D. Ebneier, Regional Administrator Mr. L D. Wert, Senior Resident Inspector - Ilatch Utility Data Instityte. Inc.
Mr. Fred Yost, Director - Research Services 1
I I
l IIIA%1 00rm5
- . l
, l l
l Enclosure 1 l
Plant Hatch Unit 1 Monthly Operating Report '
March 1994 Table of Contents Page Narrative Report El-1 Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4 Illa 561
< tXXXX15 -
_ . ._ _ m . _
e PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: APRIL 6, 1994 NARRATIVE REPORT COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 JMARCH 1 0000 Shift continued to maintain rated thermal' power.
MARCH 13 0035 Shift began reducing load to a Turbine Control Valve Testing,pproximately 600 GMWe to performTurbin a Control Rod Sequence Exchange.
MARCH 13 1234 Shift began ascension to rated thermal power.
MARCH 13 1432 Rated thermal power was attained.
MARCH 25 2100 Shift rc Aced load to approximately 600 GMWe when Plant Service Water to the Turbine Building isolated. The isolation occurred when a LOCA signal was inadvertantly generated during the performance of an Analog Transmitter Trip System surveillance.
MARCH 25 2338 Shift began ascension to rated ' thermal power.
MARCH 26 0210 Rated thermal power was attained.
MARCH 29 0101 A loss of Main Generator field excitation led to a load rejection by:
Turbine-Generator System and' resulted in an automatic reactor shutdown.
MARCH 31 1402 Shift began withdrawing control rods for_ unit startup.
MARCH 31 1808 Shift brought the reactor critical.
MARCH 31 2400 Shift continued with unit startup activities.
El-1
i OPERATING DATA REPORT DOCKET NO.: 50-321 ,
DATE: APRIL 6, 1994 l COMPLETED BY: R. M. BEARD l
~
OPERATING STATUS
- 1. UNIT NAME: E. I. HATCH - UNIT ONE-
- 2. REPORT PERIOD: MARCH 1994
- 3. LICENSED THERMAL POWER (MWt : 2436
- 4. NAMEPLATE RATING (GROSS MWe : 850
- 5. DESIGN ELECTRICAL RATING N T MWe : 776.3
- 6. HAXIMUM DEPENDABLE CAPACI Y GROS MWe): 774
- 7. MAXIMUM DEPENDABLE CAPACITY NET MWe): 741
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 2160 '159959-
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 678.9 2094.9 120098.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0~
- 14. HOURS GENERATOR ON LINE: 673.0 2089.0 115045.6-
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1630330 5071702 258180236
- 16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 523440 1636030 82980360
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 500216 1566755 78957249
- 19. UNIT SERVICE FACTOR: 90.5% 96.7% 71.9%
- 20. UNIT AVAILABILITY FACTOR: 90.5%- 96.7% 71.9%-
- 21. UNIT CAPACITY FACTOR USING MDC NET : 90.7% 97.9% 65.9%
- 22. UNIT CAPACITY FACTOR USING DER NET : 86.6% 93.4% 63.3%
- 23. UNIT FORCED OUTAGE RA E: 9.5% 3.3% 11.8%'
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
54 Day Refueling Outage tentatively scheduled for September 21, 1994.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Generator on line April 1, 1994.
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A El-2
PLANT E. I. HATCH - UNIT ONE DOCKET N0.: 50 '21-a DATE: APRIL 6, 1994 AVERAGE DAILY POWER LEVEL COMPLETED BY: R. M. BEARD.
TELEPHONE: (912) 367-7781 x2878 DAY Net MWe 1 .............. 749 2 .............. 749 3 .............. 755 4 .............. 753 5 .............. 753 6 .............. 752 7 .............. 748 8 .............. 747 9 .............. 743 10 .............. 750 11 .............. 759 12 .............. 755 13 .............. 671 14 .............. 752 15 .............. 752 16 .............. 754 17 .............. 757 18 .............. 751 19 .............. 752 20 .............. 751 21 .............. 747 22 .............. 749 23 .............. 749 24 .............. 745 25 .............. 717 26 .............. 744 27 .............. 742 28 .............. 744 29 .............. 0 30 .............. 0 31 .............. 0 l
-1 1
I l
1 El-3 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.: 50-321 DATE: APRIL 6, 1994 UNIT NAME: E. I. HATCH - UNIT ONE COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: MARCH 1994 R H S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE' P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 94-001 940329 F 71.0 A 3 94-003 HA GENERA A loss of Main Generator (X) field excitation led to a load rejection by-the Turbine-Generator System and resulted in an automatic reactor shutdown.
Field excitation was lost when arcing occurred between the Main Generator Exciter (MGE) brush rigging and one of the collector rings- on the MGE rotor. The primary cause for the arcing is believed- to be the stickin of a carbon brush in the. g brush rigging.
Corrective actions include replacing the damaged MGE rotor and increasing the frequency of brush inspection to a daily interval.
TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR-TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
El-4 I
i 1
l i
4 Enclosure 2 Plant Hatch Unit 2 Monthly Operating Report March 1994 Table of Contents Page Narrative Report E2-1 Operating Data Report E2-2 Average Daily Power level E2-3 Unit Shutdowns and Power Reductions E2-4 1
1
)
i tilA561 OtKKX)$
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: APRIL 6, 1994 NARRATIVE REPORT COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781.x2878 MARCH 1 0000 Shift continued to maintain approximately 550 CMWe te monitor offgas activity and fuel performance.
MARCH 5 0147 Shift began reducing load to approximately 500 GMWe to perform Control Rod Drive Exercises.
MARCH 5 0409 Shift began ascension to 70% of rated thermal power.
MARCH 5 0445 70% of. rated thermal power was attained with unit load at approximately 550 GMWe.
MARCH 13 0021 Shift began reducing load to approximately 500 GMWe to perform-Control Rod Drive Exercises.
MARCH 13 0143 Shift began ascension to 70% of rated thermal power.
MARCH 13 0245 70% of rated thermal power was attained with unit load at approximately 550 GMWe.
MARCH 15 0600 Shift began reducing load in preparation for a unit shutdown.
sMARCH 16 0119 The unit entered the 11th Refueling Outage when shift removed the generator from the grid.
MARCH 31 2400 Personnel continued activities associated with the lith Refueling Outage.
E2-1 l
I
'l I
OPERATING DATA REPORT DOCKET N0: 50-366 DATE: APRIL 6, 1994 COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS:
1.-UNIT NAME: E. I. HATCH - UNIT TWO 2.. REPORTING PERIOD: MARCH 1994 MWt : 2436
- 3. LICENSED
- 4. NAMEPLATE THERMAL RATING (GROSS POWER (MWe : 850
- 5. DESIGN ELECTRICAL RATING (N T MWe): 784 ;
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 798
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 765
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS 1
-10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 2160 127585.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 361.8 1777.8 97518.0 13.' REACTOR' RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 361.3 1777.3 94003.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 .
0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHt): 599920 3068906 206540780 17.-GROSS ELECTRICAL ENERGY GENERATED (MWHe): 192200 992470 67607210
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 179435 938165 64372856
- 19. UNIT SERVICE FACTOR: 48.6% 82.3% 73.7%
20.- UNIT AVAILABILITY FACTOR: 48.6% 82.3% 73.7%
- 21. UNIT CAPACITY FACTOR USING MDC NET): 31.5% '56.8% 66.0%
- 22. UNIT CAPACITY FACTOR USING DER NET): '30.8% 55.4% 64.4%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 0.0% 7.3%. i
'24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND OURATION OF EACH): N/A.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A Generator on-line tentatively scheduled for April 27, 1994,
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E2-2
6i 1
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 366 DATE: APRIL 6, 1994 AVERAGE DAILY POWER LEVEL ' COMPLETED BY:' R. M. BEARD -l TELEPHONE: (912) 367-7781 x2878 DAY Net MWe 1 .............. 518 2 .............. 517 3 .............. 522 4 .............. 520 5 .............. 516 6 .............. 521 7 .............. 519 8 .............. 517 9 .............. 515 10 .............. 517 11 .............. 522 12 .............. 520 13 .............. 517 14 .............. 520 15 .............. 311 16 .............. 0 17 .............. 0 18 .............. 0 19 .............. 0 20 .............. 0 21 .............. 0 22 .............. 0 23 .............. 0-24 .............. 0 25 .............. 0 26 .............. 0 27 .............. 0 28 .............. 0 29 .............. 0 30 .............. 0 31 .............. 0 E2-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0: 50-366
, DATE: APRIL 6, 1994 UNIT NAME: E. I. HATCH - UNIT TWO COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: MARCH 1994 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 94-002 940315 S 0.0 C 5 N/A RC FUELXX Shift began reducing power to shut down the unit for the 11th Refueling Outage.94-003 940316 S 382.7 C 2 N/A RC FUELXX The unit entered the lith Refueling Outage when the generator was removed from the grid.
TYPE: REASON: METHOD: EVENTS REPORTED' INVOLVE A GREATER THAN 20%
F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE
'S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HvURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4 .