ML20062B005

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP 1.3 Re Estimation of Source Term,Epip 3.1 Re Alert - Immediate Actions & EPIP 4.1 Re Site Emergency - Immediate Actions
ML20062B005
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/09/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20062A992 List:
References
NUDOCS 8208040288
Download: ML20062B005 (4)


Text

.- -- .- .-. __ _... . - . - ..

O Wisconsin Electnc eowca coureur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 July 9, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of the following revisions to the Point Beach Nuclear Plant. Emergency Plan Implementing Procedures.

f PROCEDURES

1. EPIP 1.3, " Estimation of Source Term", Revision 3, dated 06-25-82.
2. EPIP 3.1, " Alert - Immediate Actions", Revision 1, dated 06-25-82.
3. EPIP 4.1, " Site Emergency - Immediate Actions *,

Revision 1, dated 06-25-82.

4. EPIP 5.1, " General Emergency - Immediate Actions",

Revision 1, dated 06-25-82.

FORMS

1. EPIP-23 (06-82), "Offsite Agency Emergency Call Lists",

(place after the Call List tab).

2. EPIP-24d (06-82), " Control Room Emergency Plan Equipment Inventory Checklist", (attach to EPIP 7.4.1).
3. EPIP-25a (06-82), " Emergency Vehicle Checklist", (attach to EPIP 7.4.2).

8208040288 820720 0 0b PDR ADOCK 05000266 F pon lfIM f 9

. ._ . _ . \

. - . . .H Mr. H. R. Denton July 9, 1982

4. EPIP-25b (06-82), " Monthly Health Physics Instrument and Air Sampler Functional Test Checklist", (attach to EPIP 7.4.2) .
5. EPIP-28 (06-82), " Emergency Plan Instrument Calibration Schedule", (attach to EPIP 7.4.2).
6. EPIP-29 (06-82), " Emergency Plan Counting Equipment and Frisker Calibration Schedule", (attach to EPIP 7.4.2) .

MISCELLANEOUS

1. " Table of Contents" dated 06-25-82.
2. " Table of EPIP Forms" dated 06-25-82.

These revisions consist of page changes which should be filed in your copies of the Emergency Plan Implementing Procedures in accordance with the attached instructions. Please return the receipt form for these ten capies to:

Wisconsin Electric Power Company .

Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, h*c/ 'G[

Y Assistant Vice President C. W. Fay Enclosures

,i Copies to NRC Resident Inspector (1)

Incident Response Center, Region III (3)

, c. o June 25, 1982 I

\ ,

N

~

i'  ?

    June 25, 1982 POINT BEACH NUCLEAR PLANT . EMERGENCY PLAN IMPLEMENTING PROCEDURES 06-25-82 P I hereby acknowledge receipt of EPIP 1.3, EPIP 3.1, EPIP 4.1, and EPIP 5.1 and have inserted them into my manual. l Date 1 e i 1 i 1 , - - . . - , - - . . - - - ,- N5 . ?- ~ - - . - - , . , . . - - , , - - - , , , . - - - - ~ - - - - - - -