Text
,
b
(
DISTRTRf 87*'
@et Filed NKL PUR L PDR ORB #4 Rdg DEisenhut Dockets Nos. 50-321 and 50-36G 0
IE ACRS-10 MFairtile Mr. J. T. Beckham. Jr.
Vice President - Nuclear Generation RIngram Georgia Power Company 6"bFile C
P. O. Box 4545 PShemanski Atlanta, Georgia 30302
Dear Mr. Beckham:
In order to complete our review of the Hatch Plant Units 1 and 2 Equipment Environmental Qualification Program we need responses to the enclosed requests for additional infomation. The questions were prepared by Franklin Research Center. Note the options er Page 5 of the enclosures regarding submittal of your responses.
i k
Kindly submit the request.ed information within 30 days of receipt of this letter.
Sincerely, M IcIRALs1g;g g 20im 2. Sto.tgy John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Request for Additional Information cc w/ enclosure:
See next page O206140256' 020607 e=
PDR ADOCK 05000321 p
PDR Ii[E0 o r r,c, >
...anaR.4.:oL.
..c.-o.. 4.;n..
.un _,>
..N.Fa1 rti },e;c f J z
6LM82 6f..').? 2 on,p Nac ronu m oo.e03 nacu oua OFFIClAL RECORD COPY usaeoom-m9m t
i
=
Hatch 1/2 50-321/366 Georgia Power Company ccw/ enclosure (s):
Mr. James P. O'Reilly, Regional Administrator G. F. Trowbridge, Esq.
U. S. Nuclear Regulatory Comission Shaw, Pittman, Potts and Trowbridge Region II 1800 M Street, N.W.
101 Marietta Stregt, Suite 3100 Washington, D. C.
20036 Atlanta, Georgia 30303 Ruble A. Thomas Vice President P. O. Box 2625 Southern Company Services Inc.
Bimingham, Alabama 35202 Ozen Batum Charles H. Badger Southern Company Services, Inc.
Office of Planning and Budget Post Office Box 2625 Room 610 Bimingham, Alabama 35202 270 Washington Street, S.W.
Atlanta, Georgia 30334 Chaiman -
Appling County Commissioners County Courthouse Baxley, Georg,ia 31513 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Mr. Max Manry Georgia Power Company I.
Edwin I. Hatch Plant P. O. Box 442 l
Baxley, Georgia 31513 i
- i Regional Radiation Representative i
EPA Region IV
.I 345 Courtland Street, N.E.
, Atlanta, Georgia 30308
),
Appling County Public Library 1
301 City Hall Drive i
Baxley, Georgia 31513 i
!!r. R. F. Rogers V. S. fluclear Regulatory Commission o
Route 1, P. O. Box 279 Baxley, Georgia 31513 I
i i
1
)
r Enc 1csure REQUEST FOR ADDITIONAL INFORMATION to ltr. dtd. 6/7/82 1
HATCH UNIT NO. 1 d,!
RAI-C5257-474 Rev. 2, May 19, 1982 1
i BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (S ER) and the installed TMI Action Plan equipmen't. The review will be limited
~
'to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.
This request for additional information (RAI) is the resul?. of an evaluation of the information provided by letters dated September 14, 1981 (1), February 1, 1982 (2), and March 5, 1981 [3).*
FRC previously requested TMI Action Plan information by telephone memoranda dated July 27,1981 and Septemmer 14, 1981 (4,5].
In response to Reference 4, Georgia Power Company transmitted the following information wnich was received at FRC on August 14, 1981 [6):
1.
Southwest Research Institute letters to Hays Republic Div. Milton Roy Company, dated 29 May 1980, 19 November 1979, 21 February 1980, and 26 February 1980, concerning SwRI Project No.
~
11-5453-013,
" Irradiation of Instrumentation."
]
j By letter dated February 10, 1982 [9], Georgia Power Company submitted Il the qualification documentation requested in Section A of this RAI, with the following clarifications; the Licensee has deleted the subject of RAI item item A.l.ij in its place.(
A.l.1 cue to a typographical error, citing RAI By letter dated April 5, 1982 (10), the Licensee provided additional information on MSLB parameters.
i
'l
' Numbers in brackets refer tc citations found in the list of references.
- Throughout the text, superscript numbers in parentheses indicate the revision in which the underlined material preceding the superscript was added.
t 4
ibJ Fmnklin Research Center 4>-
wn=r
=w.m.
2
j RAI-C5257-474 Rev. 2, May 19,1982 i
A.
FRC REVIDi OF THE LICENSEE'S 90-DAY RESPONSE 20 THE NRC EEQ SER INF5RMATION REQUESTED
~
DATE, RECEIVED BY FRC***
1.
In reference to the Licensee's 90-day r,esponse (1) to 'the NRC SER (7), a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
a.
Mech. Calculation No.1, Vol. 5, Rev. O.
2/24/82 [9](1) b.
HNP-2 Mech. Calculation No. 296, Rev. O.
2/24/82 [9] (1) c.
General Electric Information Document No.
2/24/82 [9] (1) 22A5230.
d.
Westinghouse Order No. (test) AT-18008-Y1.
2/24/82 [9] (1) e.
Target Rock Corp. Test Report 1559, 2/24/82 [9] (1)
Rev. ail) dated December 13, 1976.
f.
Static-O-Ring Test Report 7924-101 dated 2/24/82 [9](1)
May 22, 1979.
g.
Control System Calculation No. 16.
2/24/82 [9] (1) h.
ENP-1 Electrical Calculation No. 24.
2/24/82 [9] (1) i.
Terminal Block IDCA Test by General 2/24/82 [9] (1)
Electric Co., dated November 6, 1973.
- j. Wyle Laboratories Report No. 44354-1.
2/24/82 [9] (1) i k.
Hatch Unit 1, Electrical Calculation No.
2/24/82 [9](1) 28.
1.
deleted (l) m.
The Okonite Company Engineering Report 2/24/82 [9] (1)
!b. Il0E****
n.
The Okonite Company Engineering Report
'2/24/82 [9](1)
For m N-1. ""
l
- "This column will be completed by FRC as the requested information is L
received.
l,
""These documents were previously requested in Reference 5 but have not been received by FRC.
i-1 O E Franklin Research Center 1
s om.on au n. rr.ma,n a..aue
RAI-CS257-474 Rev. 2, May 19, 1982 DATE RECEIVED BY FRC***
2/24/82 [9)(1)
Hatch Unit 1, Electrical Calculation No.
o.
25.
2/24/82 [9](1)
Hatch Unit 1, Electrical Calculation No.
p.
21.
2/24/82 [9](1)
Hatch Unit 1, Electrical Calculation No.
q.
18.****
2/24/82' [9)(1)
Hatch Unit 1, Electrical Calculation No.
r.
22.
HPN-1 Electrical Calculation No. 23.
2/24/82 [9](1) s.
2/24/82 [9)(1)
General Electric Qualification Test for t.
Electrical Penetration Assemblies, April 30, 1971.
2/24/82 [9)(1)
Square D Company Bulletin NEQ-80, u.
" Nuclear Environmental Qualification Test Report Summary."
2/24/82 [9](1) v.
BIW Test Report No. 8807.
G.E. Bulletin CDS-2195, p. 4 (1) 2/24/82 [9)(1) w.
2/24/82 [9] (1)
Hatch Unit 1, Electrical Calculation No.
x.
27.
2/24/82 [9](1)
AMP Engineering Test Report GPR 575-99.
y.
2/24/82 [9](1)
AMP Engineering Test Report EER-35.
aa.
Hatch Unit 1, Elect. Calculation No. 20.
2/24/82 [9}(1) 2/24/82 [9)(1) bb.
Electroswitch Technical Publication ESC-STD-1000.
Electroswitch Letter dated May 10, 1980.
2/24/82 [9](1) cc.
Subject:
Series 20/40 Radiation Test.
2/24/82 [9] (1) dd.
Estimation of Qualified Life of EA 740 and EA 180 I1) Series Nuclear Switch, Rev. 3 dated February 27, 1980.
2/24/82 [9)(1)
G.E. Letter G-GPC-0-249 dated October 23, ee.
1980 with attached report NEDO 24873.(1)
.nWin Research C_ enter
t RAI-CS257-474 Rev. 2, May 19, 1982 DATE RECEIVED BY FRC***
ff.' G.E. VPF 2793-54-3.
2/24/82 [9 } (1) gg.
G.E. VPF 3379-243-1.
2/24/82 [9] I1) hh.
Central System Calculation 22 Rev. O.
2/24/82 [9) (1) ii. Hatch Unit 1 Electrical Calculation No.
2/24/82 [9](1) 19.
jj.
Hatch Unit 1 Electrical Calculation No.
2/24/82 [9](1) 26.
kk.
General Electric Qualification Report on 2/24/82 [9] (1)
ECCS Motor for E.I. Hatch Unit No. 1 NSE 17-0481-1 11.
G.E. VPF 3379-214-2 2/24/82 [9)(1) mm.
G.E.
Letter G-GPC-1-202 dated 2/24/82 [9) (1)
Septemoer 2, 1981 nn.
Rosemount Letter dated August 12, 1981 2/24/82 [9] (1) oo.
Rosemount Report 127227 2/24/82 [9](1) pp.
Rosemount Report 97215A Received 2/12/82 on Task 495 j
2/24/82 [9]L4 i
B.
FRC REVIEd OF INSTALLED DiI ACTION PLAN ITLMS i
Information P.ecuested 1.
Reference 1 does not provide adequate detail with respect to _ identification of TMI Action Plan equipment installed after 1/1/81.
t
?
The correlation of these equipment items with the specific sections of NUREG-0737 (8) presented below (as applicable) is requested.
l IIE4.2, IID3, IIB 3, IIE4.1, IIK3.13, IIK3.15, IIK3.19, IIK3.21, IIK3. 27.
L l.
L -
eds s00hs ij ranklin Research Center o
% wn.r,-a
~
RAI-C5257-474 Rev. 2, May 19, 1982 DATE RECEIVED BY FRC***
[The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a "Ji1 Action Plan item, are the cable. and terminal blocks associated with the device also ioentified?]
Where the Licensee has a standard Owners' 2.
Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.
INSTRUCTIONS ECR TRANSMITTING INFORMATION REQUESTED C.
The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of 1.
the RAI.
The Licensee may transmit the requested information as follows:
2.
complete package directly to the NRC project manager o
or copy of cover letter to NRC project manager and complete package to FRC.
o FRC mailing address is as follows:
1 Mr. Cyril J. Crane d
Franklin Research Center i
The Parkway at Twentieth Street Philadelphia, PA 19103
't Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 1
e,
UNJ Franklin Resea.rch Center 4c e n.n m.ou.
c
4 RAI-C5257-474
^
Rev. 2, May 19,1982 REFERENCES
^
1.
J. T. Beckham, Jr.
Letter to J. P. O'Reilly, NRC.
Subject:
Environmental Qualification of Safety-Related Equipment; Revision 3 - Response to SRF for Edwin I. Hatch Nuclear Plant Georgia Power Co., 14-Sep-81 2.
W. A. Widner Le tter to J. P. O' Reilly, NRC.
Subject:
Response to IE Bulletin 79-OlB Supplement 3.
Georgia Power Co., 01-Feb-81 3.
W. A. Widner Letter to J.
P. O'Reilly, NRC.
Subject:
Georgia Power Company's Update of its IE Bulletin 79-013 Response dated February 17, 1981.
(Attached)
Georgia Power Co., 05-Mar-81 4.
Telephone Memorandum J. A. Murphy (FRC) with R.
Baker (Georgia Power Co.)
Subject:
Request for Information for Hatch Units 1 and 2 July 27,1981 5.
Telephone Memorandum K.
Iepson and D.
Schmitz (FRC) with R. Baker (Georgia Power Co.)
Subject:
Request for Information for Hatch Units 1 and 2.
Septemoer 14, 1981 6.
Draft letter to FRC, transmitting documentation references. and cold snutdown information.
(Information requested via telecon, 7/24/81.)
Letter received 8/14/81.
Georgia Power Co., 00-Aug-81 l
7.
Of fice of Nuclear Reactor Regulation
(
Safety Evaluation Report for Hatch Unit 1 Environ:nental Qualification of Safety-Related Electrical Equipment NRC, 16 Jun-81 8.
NUREG-0737, " Clarification of mI Action Plan Requirements" i
NRC,' November 1980 l
l l'
9 G.
F.
Head 2
l Letter to NRC.
Subject:
Edwin I.
Hatch Nuclear Plant Units 1 and 2:
Environmental Qualification of Safety-Related Electrical Ecuicment; Additional Information Georgia Power Co.,
10-Feb-82(1) l
. d!} Franklin Research Center A Ommon cd The Fearuen ansotuis
{ --
7,
.i (_ ),
'\\,
s s
- h
~
i e
1 RAI-C5257-474 Rev. 2, May IS, 1982
,.j.
'y #
I
- 10. J. T. Beckham, Jr.
Intter to J. F. Stolz, NRC.
Subject Edwin I. Hatch Plant Unita'1 4,
and 2; Response to Containment Systems Branch Request for Mditional g
Information on Main Steam Line Break _
k
,y.
j Georgia Power Co., 05-Apr-82 W t
,.3, m
l' t
c as i
a.
.A r;-
9 t
1
\\
s t, g q
'" u.
,4 L
)
i i
si r
it g
]
.. 4
+
r, f
f I
i
't I
i
!~
i.
' GJ Franklin Research Center J
-o Acus,ana m r,m u m ue
!i
~
._,__m
Enclosure to ltr. dtd. 6/7/82 REQUEST FOR ADDITIONAL INFORMATION I
HATCH UNIT NO. 2 RAI-C5257-475 Rev. 2, May 19, 1981 BACKGROt.'NC g
Franklin Research Center (FF.C) of Philadelphia, Pa. is providing assis-tiyce to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors.
FRC will perform an EEQ' review of,the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report
+
,t (S ER) and the installed 'IMI Action Plan equipment. The review will be limited
.to safety-related.equipnent potentially exposed to a harsh environment. The
\\
redults will be presented in the form of a technical evaluation report for eacn plant.
I This rcquest for additional intormation (RAI) is the result of an Y d
evaluation of'*the information provided by letters dated September 14, 1981
{l], Feocuary 1, 1981 [2], and March 5, 1931 [3].*
FRC previously requested TMI Actidn Plan information by telephone memoranda dated July 27,1981 and September 14, 1981 [4,5].
In response to the request for Reference 4, Georgia Power Company transmitted the following information (6):
1.
Southwest Research Institute letters to Hays Republic Div. Milton Roy Company, dated 29 May 1980, 19 November 1979, 21 February 1980, and 26 February 1980, concerning SwRI Project No. 11-5453-013,
" Irradiation of Instrumentation."
B/ letter dated Feoruary 10, 1982 [9 ], Georgia Power Company submitted
=
the qualification douer.entation requested in section A of this RAI.(1)**
By letter dated Acril 5, 1982 (10), the Licensee crovided additional information on MSLB parameters.
" Numbers in brackets refer to citations found in the list of references.
- Throughout the text, superscript numbers in parenthests indicate the revision
'in wnich the underlined material preceding the superscript was added.
s
_1 A
b) FranMn Research Center 4om.a.a n r..,
a*.aw.
7
--~
RAI-C5257-475 Rev. 2, May 19, 1982 A.
FRC REVIDd OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER t
INFORMATION REQUESTED DATE RECEIVED BY FRC***
1.
In reference to the Licensee's 90-day response [1] to the NRC SER [7}, a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds
- a. Mechanical Calculation 296, Rev. 0 2/24/82 (9](1)
- b. General Electric Information Document 2/24/82 (9](1) 22A5230
- c. Westinghouse Order No. (Test) AT-18008-Y1 2/24/82 [9]III f
- d. Target Rock Corp. Test Report 1559, 2/24/82 [9] III l
December 13, 1976
,j
- e. Static-O-Ring Report No. 7924-101, May 2/24/82 [9](1) 22, 1979
- f. Control System Calculation 30 2/24/82 [9](1)
- g. HNP-2 Electrical Calculation No. 27 2/24/82 [9]III i,
- h. Terminal Block LOCA test by General 2/24/82 [9](1) h; Electric Company, November 6, 1973 1
- 1. Wyle Laboratories Report No. 44354-1 2/24/82 [9](1)
.j
- j. Hatch Unit 2, Electrical Calculation No.
2/24/82 [9] (1) 25
}
- k. Okonite Company Engineering Report No.
2/24/82 (9]III N-1****
- 1. AMP Engineering Test Report GPR575-98 2/24/82 [9](1)
N
- m. AMP Engineering Test Report EER-35 2/24/82 (9]III
- n. Hatch Unit 2, Electrical Calculation No. 23 2/24/82 [9] (1)
- This column will be completed by FRC as the requested information is received.
]
- Document previously requested in Reference 5 but not received by FRC.
l
'1
' _nidin,m_ arch _ Center Rese 4
~
g l
RAI-C5257-475 I
Rev. 2, May 19, 1982 I
i,
- o. Hatch Unit 2, Electrical Calculation No.
2/24/82 [9](1) 24 DATE RECEIVED BY FRC***
- p. Estimation of Qualified Life of EA180 2/24/82 [9](1) l Series Nuclear Switch, Rev. 3, February 5
27, 1980
- q. Estimation of Qualified Life of EA740 2/24/82 [9](1)
Series Nuclear Switch, Rev. 3, February 27, 1980
- r. HNP-2 Electrical Calculation No. 28 2/24/82 [9] (1)
- s. NEQ Test Report No. 43703-1, Wyle Job No.
2/24/82 [9](1) 43703 s
}
t.
HNP-2 Electrical Calculation No. 29, 2/24/82 [9](1)
Rev. O
- u. HNP-2 Electrical Cal:ulation No. 26 2/24/82 (9] (1)
- v. Hatch Unit 2, Electrical Calculation
,2/24/82 [9](1) b.
22
- w. Okonite Company Engineering Report 2/24/82 [9](1)
No. G-3****
- x. Hatch Unit 2, Electrical Calculation 2/24/82 [9] (1)
Ib. 21
.j
- y. Rosemount Report 108025 2/24/82 (9](1) l
- z. Hatch Unit 2, Electrical Calculation 2/24/82 [9](1)
No. 20
}
aa. Samuel Moore Letter, March 25, 1980 2/24/82 [9] (1) bb. GE Letter G-GPC-0-249, October 23, 1980 2/24/82 (9] (1)
I with attached report NEDO24873(1) cc. GE VPF 2793-54-3 2/24/82 (9] (1) dd. GC VPF 3379-243-1 2/24/82 [9](1) ee. GE Qualification Report HNP Unit 2 Core 2/24/82 [9] Ill Spray and RHR Motors No. NSE-17-04-81 Rev. 1 ff. GE Qualification Report No. NSE-17-0481-1 2/24/82 [9] (1) i
_nklin..Res,e_ arch C_ enter 2
i
~
~."
i RAI-C5257-475 Rev. 2, May 19,1982 DATE RECEIVED BY FRC***
gg. GE Letter G-GPC-1-202, dated September 2, 2/24/82 [9](1) 1981 i
2/24/82 [9](1) hh. Rosemount Report No. 127227 i
Receivad 2/12/82 for
- 11. Rosemount Report 97215A Task 495W 2/24/82 [9](1)
B.
FRC REVIEW OF INSTALLED MI ACTION PLAN ITDIS r
DATE RECEIVED BY FRC***
I' INFORMATION REQUESTED 1.
Reference 1 does not provide adequate detail f
with respect to identification of MI Action l
Plan equipment installed af ter 1/1/81.
t' The correlation of these equipment items l
with the specific sections of NUREG-0737 i
[8] presented below (as applicable) is i
requested.
f IIE4.2, IID3, IIB 3, IIE4.1, IIK3.13, IIK 3.15, IIX3.19, IIK3.21, IIK3.27.
[The correlation is needed to ensure that all items are included in_the
- review, e.g., if a transmitter is i
identified as a 'IMI Action Plan item, are the cable and terminal blocks associated with the device also 4
identified?]
3 l
2.
Where the Licensee has a ' standard owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is j
requested in order to incorporate it into the review.
i i
C.
INSTRUCTIONS EUR TRANSMITTING INEVRMATION REQUESTED t
1.
The schedule for completion of the FRC assignment requires that the t
l Licensee provide the requested information within 3 weeks of the date of I
the RAI.
t l
b0U Franklin Research Center a % as n. rr.aua w.w.
-m
RAI-C5257-475 Rev. 2, May 19, 1982
,' i 2.
The Licensee may transmit the requested information as follows:
o complete package directly to the NRC project manager or o' copy of cover letter to NRC project manager and complete package to FRC.
FRC mailing address is as follows:
1 Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 I
Telecopy Confirmation No. 215/448~1215 l
'i y
t
}
}
i I
il 1
ll i
,I l ',
i 11n it'i
-5
,1
~
O b
N' d Franklin Research Center lI Il 4 % tn.re -.au.
7
RAI-C5257-475 Rev. 2, May 19, 1982 REFERENCES 1.
J. T. Beckham,' Jr.
l Letter to J. P. O' Reilly, NRC.
Subject:
Environmental Qualification
~
of Safety-Related Equipment; Revision 3 - Response to SRF for Edwin I. Hatch Nuclear Plant Georgia Power Co., 14-$ep-81 I
I 2.
W. A. Wiuner Letter to J. P. O' Reilly, NRC.
Subject:
Response to IE Bullttia 79-01B Supplement 3.
Georgia Power Co., 01-Feb-81 3.
W.
A. Widner Letter to J. P. O'Reilly, NRC.
Subjects Georgia Power Company's Update of its IE Bulletin 79-01B Response dated February 17, 1981.
(Attached)
Georgia Power Co., 05-Mar-81 4.
Telephone Memorandum J. A. Murphy (FRC) with R. Baker (Georgia Power Co.)
Subject:
Request for Information for Hatch Units 1 and 2 July 27, 1981
. j 5.
Telephone Memorandum i
K.
Iepsen and D.
Schmitz (FRC) with R. Baker (Georgia Power Co.)
Subject:
Request for Information for Hatch Units 1 and 2.
g September 14, 1981 6.
Draf t letter to FRC, transmitting documentation references and cold 4
j shutdown information.
(Information requested via telecon, 7/27/81.)
0 Letter received 8/14/81.
Georgia Power Co., 00-Aug-81 7.
Office of Nuclear Reactor Regulation Safety Evaluation Report for Hatch Unit 2 Environmental Qualification of Safety-Related
]
Electrical Equipment j
NRC, 16-Jun-81 1
tj, 8.
NUREG-0737, " Clarification of THI Action Plan Requirements" NRC, November 1980 9.
G.
F.
Head Le t t er to NRC.
Subject:
Edwin I.
Hatch Nuclear Plant Units 1& 2r Environmental Qualification of Safety-Related Electrical Equioment; Additional Information Georgia Power Co., 10-Feb-82tM l
. -_ arch C_ enter nklin Rese
RAI-C5257-475 Rev. 2, May 19, 1982
- 10. J.
T.
Beckham, Jr.
,Imtter to J.
F.
Stolz, NRC. Subjects Edwin I. Eatch Plant Units 1 and 2 Response to Containment Systems Brarich Request for Additional Information on Main Steam Line Break Georgia Power Co., 05-Apr-g ld) 0