Forwards Revised Reponse to Item 3 in 841102 Submittal of Addl Info Re Percentage of Contract Workers Accumulating Significant Overtime Hours During Unit 2 Equipment Qualification Program
ML20099C474
Person / Time
Site: Hatch 
Issue date: 11/12/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NED-84-581, TAC-55488, TAC-55489, NUDOCS 8411190554
Download: ML20099C474 (3)


Text

Georgia Pcwer Cornpany 333 Piedmcrt Avenue Affanta. Georga 30308 Telephore 404 526ES26 Ma;hng Address.

-(*

P Post office Box 4545 Atlanta, Georga 30302 Georgia Power L T. Gucwa the soutnern eWinc system Manager Nuclear Erg reer.ng -

ar.d Cheef Nuclear Eng neer NED-84-581 November 12, 1984 Director of M1 clear Reactor Recplation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. M1 clear Re<platory Comnission Washington, D. C.

20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HNIGI NUCLEAR PIANT UNIT 1 ENVIRCM4EN'IAL CUALIFICATION OF ELECIRICAL EQUIINENT EX'IENSION 'IO SCHEDUIAR REQUIRWEN'IS OF 10 GR 50.49(g)

Gentlenen:

By letter dated November 2,

1984 (NED-84-572) Georgia Power Company (GPC) replied to the October 31, 1984 recuest for additional information on the Plant Hatch ecuipnent cualification program.

GPC has just recently revised our estimate in the response to one of the NRC's cuestions in that altnittal.

In the GPC response to Item No. 3 in cur November 2, 1984 letter, we stated that 85% of the contract workers who aca.n11ated considerable overtime hcurs c11 ring the recently ccurpleted Unit 2 cutage will perform significant roles (11 ring the Unit 1 ecuipnent cualification installation effort now in progress. GIC has recently revised the estimate to show that only 58% of the contract workers will fall into this category.

' Ibis revision should also be reflected in Encloalre 3 to cur above-referenced altnittal since only 140 contract workers are now estimated to participate significantly in both outages, instead of 156 as was originally stated.

In addition, the contractor noted in Encloalre 3 has revised the total count for their workers who acmnulated overtime bcurs d1 ring the recent Unit 2 cutage (changed from 184 to 240) ; this is reflected in the encloaire revision.

8411190554 841112 PDR ADOCK 05000321 i

P PDR i

\\

a Georgia Power A Director of Macleac Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 November 12, 1984 Page 'Iho A revised copy of Encloa2re 3 to NED-84-572 is attached to this letter and should be used as a replacecent for the original encloaire.

Very truly yours,

/7Q s L. T. G1 cwa CBS @

xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (NRC-Region II)

Senior Resident Inspector 1

I

..-(.

ENCLOSURE 3 MtC DOGET 50-321 OPERATING LIG NSE DPR-57 EDWIN I. HATOI NUCIEAR PIANT 1211T 1 ENVIR0t@ENDL QUALIFICATION OF ELEC'IRICAL EQUIINENP EXTDEION 'IO SOEDUIAR REG 11RDENTS OF -10 QR 50.49(g)

OVERTIME WORIED DURING RECENT UNIT 2 OUDGE While installing the' ATIS on Unit 2 & ring the 1984 cutage, Plant Hatch

. personnel worked osertime as specified below (this does not include hours worked for non-ATIS e<atipnent items):

Contractor (Bechtel Ibwer Corporation)

Minber of sployees Involved:

240 Total Overtime Worked:

44,916 ta rs Average Ier anployee:

240.2 ta rs 140 (58%) ^ of the above listed contract workers will be utilized ' for cualified eculpment installation claring the current Unit 1 outage.

Georgia Power Company M2mber of sployees Involved: (Engineering Department) 1 (Retrofit Department) 2 (Maintenance Department) 1 Total Overtime Worked:

(Engineering Department) 313.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (Retrofit Department) 365 tars (Maintenance Department) 56.5 ta rs Average Per Dnployee:

(Engineering Department) 313.5 tars (Retrofit Department) 182.5 tars (Maintenance Department) 56.5 ta rs All fcur of the above-listed GPC enployees will be utilized for cualified eculpnent installation claring the current Unit 1 outage.

l 11/2/84 Revision 1