Forwards Response to NRC 841031 Request for Addl Info Re 840706 Request for Extension to Schedular Requirements of 10CFR50.49(g) for Certain Electrical Equipment Due to Test Complications & Procurement Lead Times
ML20204G948
Person / Time
Site: Hatch 
Issue date: 11/02/1984
From: Conway R
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1199N, NED-84-572, TAC-55488, TAC-55489, NUDOCS 8411120102
Download: ML20204G948 (15)


Text

,

m W

g.

') ' a -

1. ;

Georgia Power Company 333 Pedmont Avervio -

_ Atlanta Georgia 30308.

.. Telephone 404 526-6724-Mait.ng Addressr Post Of'ce Box 4545..

Avanta. Georgia 30302-U* COUI!** th!!' SV5!"*

R. E. Conway -

tsener vee President -

NED-84-572.

1199N November 2', 1984 Director of.Maclear Reactor Regulation

. Attention:- Mr. John F. Stolz, Chief

. Operating Reactors Branch No. 4 Division of Licensing U. S..Maclear Regulatory Consission Washington, D. C.

-20555 NRC DOOET 50-321

-OPERATING LIONSE DPR-57 EDWIN I. HA'IQI NUC2AR PLANT UNIT 1 ENVIRDtMENTAL QUALIFICATION OF E2CIRICAL EQUIINENT EX'IENSION '10 SCHEDUIAR REQUIREMENTS OF 10 CER 50.49(g)

. Gentlemen:

4 By letters -dated aily 6,1984, (NED-84-369), ally 17,1984 (NED-84-383),

ally 19,~ 1984 (NED-84-391), September 11,1984 (NED-84-491), and October 19, 1984 ' (NED-84-550), Georgia Power Conpany (GPC) filed re@ests and supporting inforration for extensions to schedilar' regiirements of 10 CER 50.49(g) for

-certain electrical eclipnent at Plant Hatch' Unit :1.

These previously

~

realested. extensions to the

-environmental

.gialification deadline

- regiirements were _ based on either procurement lead time, test couplications, or installation problems.

This letter is in response to your letter cf.

October 31,.1984, 'reglesting certain additional information in support of

.our regnests.

~

In ' cur previous letters we have atteapted to be complete, concise, and

specific in providing. the bases ' for our reglests.. To further demonstrate good casse. for 'such regiests, we are clarifying herein some of the justifications supporting those rensests.

' Oar letter of October 19,1984 (NED-84-550) illustrates the level of job complexity' incumbent.in the major eglipment replacement' effort.

Ebr example, the. analog transmitter trip system (ATTS) which is part of the overall eglipnent gialification = program, is a state-of-the-art integrated instrumentation network.. : Installation of ATE: eclipnent involves nore than rote component-by-couponent replacenent. 'Ibe couplexity of the job reglires that discrete loops be ccupletely installed in an integrated manner. Racks

E 8411120102 e41102 f

05000321

~ !;PDR ADOCK P

PDR

,(0

4

.1

~,

iGeorgiaPowerd

^

~ Director of Iticlear Reactor Resplation ~

. Attention: L Mr. John F. Stolz, Chief

. Operating ~ Reactors Branch No.=4 Nov==har 2,.1984:

Page 'No :

- containing Lseveral components of' ATIS nust contain~ precise instrumentation and J uustn belinstalled 1 at the. right time ' in the modification process.

Physical relocation of eglipnent is sometimes necessary and ren11res strict 1 coordination of activities.

'Ihese -exanples also serve to explain further our reluctance, &e to - safety concerns, to con &ct certain modifications while the unit' is at power.'

- GPC's. October. 19,< 1984 _ letter also _ reported on _ our evaluation of the feasibility of completing a portion of this work by extending the current ioutage. =. 'Ite sche &les ' arrived at reflect the need to con &ct these conplex tasks in. discrete. packages.

In this regard,- we reiterate. our cminitment that,; should the current outage be extended &e to other factors, where feasible,.we will. contime installation of additional-electrical eglipnent consistent with-the anticipated outage coupletion_ date.

It is prudent for

'us to complete 'as much of the modifications as possible & ring any outage extension.:

In air ally 6,1984 letter we mentioned our decision to replace certain eglipnent rather ~than attempt to gialify existing. eglipnent through engineering analyses.

.Encloaire l'.provides

a. synopsis conparison of eglipnent replaced versus eslipnent gialified-by analysis, addressing the
maber and type;of eglipnent in each category.

- Difficulties - are often encountered at a two unit mclear plant like

- Plant Hatch when~ 1ong outages and minimal separation between outages occur.

. Installation problems in'such cases result from the enphasis being placed on

.the unit whidi is in the_ cutage. For instance, installation problems & e to

, the minimal time. available for such things as planning and engineering are

~

further exacerbated when extensive overtime has occurred.

L

_Each ; of the five specific items of; information rensested by the above-referenced NRC letter, followed by the GPC response to each item, are 7

presented below:

1EC~ Item No. 1 L

In yuir ally L 6, 1984 letter you stated eglipnent is being replaced rather than being gialified by analysis.

Provide a synopsis addressing rn

-ithe mmber and type of eglipnent in each category.

GPC Response to Item No. 1

~

GPC has prepared a breakdown of all items covered by tFe Plant Hatch

. emaipnent_ - exalification program and~ shows the mmber of indivit al

- eglipment. items for _which replacement - is the method used for

i s y.

e Georgia Poker A iDirector of Maclear Reactor Regalation.

" Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 l

l November 2, 1984 Page %ree:

GPC Response 'to ' Item No.1 (Contirued)

malification 'and :the rumber of items which have.been malified using

. analyses and review of applicable. documentation.

Wis list, which. is included in Encloaire 1 to this letter, is. broken down for generic type of eg2ipnent covered under the emipment malification program.

MC ItestNo. 2 In yaar ally 6,1984 letter you stated work on installation of the ATIS on Hatch 2 severely inpacted this work on Hatch 1.

Provide information on the correct. status. of this design work for Hatch 1 and the specifics

'of the manpower regzired to couplete the design and installation.

GPC Response to Item No. 2 Ehclosure 2A to this. letter provides manpower reglirements which have been estimated by GPC for completion of all Unit' 1 outage eq11pment gialification modifications.

It should be noted that similar estimates

. prod 1ced by GPC for the previous Unit 2 outage were considerably lower than the actual man-hours that were realired to conplete the work.

.GPC has 'also compiled' a listing of the design status for each type of

~

electricalLeslipnent which is to be installed on Unit 1.

%is status report is presented in Encloa2re 2B to this letter.

In addition, condlit routing within the drywell, which has been an -inaccessible area daring - the ' operation of Unit 1, has not been coupleted.

Se condait,-

tubing, and instrument locations for ' ATIS eglipoent nust he reviewed to F-asaire that' any high energy.line break (HEIB) ~and Seisnile Category II over Category. I ' concerns are addressed.

%e additional design effort

~

.restired to couplete the above tasks will - reg 2 ire approximately 800 man-haars.

E C Item No. 3

.In. your - Septenber. 11, -1984 letter yaz stated the maintenance

^

modification originally planned for the outage presented undne demands on -personnel resources.

For the personnel wto would perform the eglipnent gialification work on Unit 1, provide information on the

- amount of overtime they worked to suwort the Unit 2 cutage.

q

GeorgiaPower A

/ Director. of M2 clear Reactor Rec 311ation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 November 2, 1984 Page Four GPC Response to Item No. 3 ~

Die to the rumerous major plant nodifications that were performed c11 ring the last Unit 2 outage, many critical GPC and contract personnel at Plant Hatch accinulated significant overtime while completing that work. A sunnary of the overtime coupiled daring that outage is provided in Enclosure 3.

As noted in that encloaire, 85% of the contract workers will-perform significant -roles in the eglipment osalification installation effort for Unit 1.

'Ihis results in the majority of the personnel involved in the Unit 2 effort potentially having worked 44 weeks of essentially contimous cutage activities, which could lead to excessive fatigue and result in a - red 2ction of proclictivity and the osality of the installation effort.

For this reason, GEC has determined that overtiJne work performed d1 ring the alrrent Unit 1 outage nust be limited.

}EC Item No. 4 Clarify what FQ items other than those associated with ATIS and the hydrogen / oxygen analyzer will reg 2 ire extension.

GIC Response to Item No. 4

' A listing of those eq11pnent items on the Plant Hatch Unit 1 10 GR 50.49 master list for which GPC req 2ests an extension of the

-gialification deadline to November 30, 1985 (excluding eculpnent associated with ATIS and the hydrogen and oxygen analyzers) is presented in Enclosure 4 to this letter.

'NRC Item No. 5 Provide any other justification and/or bases which auld alpport your reglest for extension.

In particular, address any item related to procurement lead time, task conplications and installation problems.

L

n a.

j.:

~ Geo~rgia'Powerd o

-Director of Maclear -Reactor. Regulation j

Attention:,-'Mr. John F. Stolz, Chief' Operating Reactors Branch No. 4' November 2, 1984.

1

_Page Fivei GIC Response to Item No. 5 GPC; is ' currently experiencing a

task complication with three-

. transmitters originally intended for service on Unit 1.

nie to delivery problems for Unit 2, these devices, intended for Unit 1, were modified

. and/or ' installed in Unit 2 & ring the previous altage (two were

-installed, one is a spare). After Unit 2 shuts down for the scFe& led Spring 1985 aitage, : these instruments will be replaced and-sent to the vendor for - modification.

%ey should be returned to GPC in time for installation on. Unit 1. & ring the ' sche & led. Fall 1985 outage.

. %erefore, GPC. has remested a deadline extension for ttese devices (previalsly listed as Ell-N002A,B) to November 30, 1985.

1GIC is 'also experiencing proalrement lead time problems with seven

' Resistance Temperature l Detectors.(R' ids) for Unit 1.

. Itese devices are sche & led for arrival at Plant ' Hatch on February 8,1985.

GIC also had to. return ; ten. transmitters to the vendor (Barton Instrument 00.) for

. repair, recalibration, and tenperature coupensation.

No date has yet been specified for the resohition of this task complication.

In addition, GEC has also discovered that ten master trip units will have to be modified by General Electric Conpany. %is task complication is' ache & led to be resolved by December 15, 1984.

GPC -is currently cond1cting plant walkdowns and reviews with regard to the effect of - the _ egipnent qualification modification on the High mergy Line. Break j (HEIB) - analyses and the seismic design for Unit 1.

%e c reviews are. highly involved and could significantly affect-the

- olrrent' modifications design L for that plant.

Any revisions to the new

~

' design. which might be remired as a result of the findings of these reviews could present serious task couplications- & ring the alrrent Unit I cutage.

)

- Werefore, GEC respectfully requests an extension from the reglirements of 10 CER 50.49(g) for installation of the previously identified items until p

November 30,- 1985.

For ' the eglipnent identified as having installation problems, GPC consnits to having _ such entipnent installed in Hatch Unit 1 P

prior; to any ' operation of the unit beyond November 30, 1985.

4 f.-

i f

--,,,,.n-

n-GeorgiaPowerd Director.of 141 clear Reactor Regulation Attention:

Mr.' John F. Stolz, Chief Operating Reactors Branch No. 4 Novesnber 2,1984 Page.Six If I there are. questions regarding the Environmental QIalification of Electrical Eglipnent Extension to Sched21ar Req 1irements of 10 GR 50.49(g),

please contact this office.

R.

E. -(bnway states that he is Senior Vice President of Georgia Iower Ocupany and is althorized to exealte this oath on behalf of Georgia Power Coupany, and that to the best of his knowledge and belief the facts set forth in this letter are tnie.

GEORGIA IOhTR GMPANY By:

//

Rf E. Conwdy N Ia Y

Swo to and albscribed before me this 2nd day of Noverrber,1984.

m /> /. _,

2'" " ", 3 Notary Riblic bety Public,Geornia, State et Large

[-

I!IG/jnb,

~ Ah Commission Empires Sept.17,1945 Encloalre xc:

H. C. Nix, Jr.

i

-Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)

--..--..,,-,w-.n,we,--

,-,m w-n...w,---,

,,.--,-.e,--,-~n--,--.-

av.

,,,-,-a--.

-w

.,,,e

q. s Georgia PowerI ENCIOSURE 1 (Page 1 of 4)

NRC DOOTT 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'ICH NUCLEAR PIANT UNIT 1 ENVIR0tMENTAL QUALIFICATION OF ELECIRICAL EQUIPMENT EX'ITNSION 'IO SCHEDUIAR REQUIRENDTIS OF 10 CER 50.49(g)

'Ite following tatulation has been coupiled to provide a synopsis of -the Georgia Power (bupany cpalification effort which has been cmpleted to date and what additional malification work still remains to be cmpleted.

'Ibe tabulation has :been organized by generic type and indicates the rumbers within each group which have been malified by analysis, those which have been replaced by malified components, and those still remaining to be replaced with m alified couponents.

Additionally, we have previcusly provided a similar tatulation for the total cmponents within the cualification program regardless of the generic type.

It should be noted that a limited nmber of cmponents have been removed from the master list based -on certain design changes which have been cwpleted at Plant Hatch.

'Ibese design changes have negated the need for the components to be in the cualification program.

UNIT 1 UNIT 2 MD'ICR OPERA'ITD VALVES mmber cualified by analysis:

72 95 mmber replaced to date with cpalified cmponents:

2 28 mmber still to be replaced with malified cmponents:

26 4

LIMIT SWI'ICHES mmber cualified by analysis:

0 0

mmber replaced to date with cualified components:

196 236 mmber still to be replaced with cualified camponents:

1 0

SOIDDID OPERATED -VALVES mmbar cualifiad by analysis:

306 293 mmber replaced to date with cualified conponents:

113 157 mmber still to be replaced with cualified components:

3 0

,I

~ RADIATICN SENSORS mmber cualified by analys'is:-

0 0

mmber replaced to date with cualified components:

2 2

mmber still' to be replaced with malified components:

0 0

11/2/84 y

k GeorgiaPoker d ENCICSURE 1 (Contirued)

(Page 2 of 4) -

-NRC DOCEET 50-321 OPERATING LICENSE.DPR-57 EDWIN I. HATOI NUCIEAR PLANT UNIT 1-ENVIR0t@ ENTAL QUALIFICATION OF ELECTRICAL EQUIINENT EX1DEION TO SOEDtJAR REQUIRDENTS OF 10 CER 50.49(g)

UNIT 1 UNIT 2 1RA16P0NGES/ POWER SUPPLIES

mmber m alified by analysis:

0 2

maber replaced to date with m alified couponents:

3 8

maber still to.be replaced with malified costponents:

9 0

EIECTRICAL' PENETRATIONS

m aber m alified by analysis

22 24 mmber' replaced to da_te with malified couponents:

0 0

- m aber still to be replaced with m alified couponents:

0 0

H'2 AIO O2 ANALYZERS =

0 0

mmber malified by analysis:.

mmber-rep 1wwl to date with malified couponents:

0 0-

~~

mmber still to be replaced with malified couponents:

2 2

00tmOL SWII01 TYPE /112BINE SPEED DETECTOR mmber malified by analysis:

3 3

maber replaced to date with malified cwents:

0 0

mnber still to be replaced with malified ccanponents:

0 0

'MSIV-IEAKAGE CONIBOL HEATTBS mmber malified by analysis:

N/A 4

mmber replaced to date with oralified conponents:-

N/A 0'

~ mmber still to be replaced with 41alified components: N/A 0

SWITOI GEAR jf. _

'~

mmber malified by analysis:

2 2

~

mmber rep 1=wl to date with malified couponents:

0 0

mober still to be replaced with malified couponents:

0 0

=

4 11/2/84 4 _ _ _ _.,, - - _.. _,. _.. _. _... -.. _ _ _., _.. _. _. _ _.., -,.. _., -.. -,..,,,... _,, -, _ _ _... _, -.

r Georgia Power A ENCLOSURE 'l (Cbntimed)

(Page 3 of 4)

NRC DOGET 50-321 OPERATING LICENSE DPR-57 EIMIN ~I. HA701 NUCLEAR PLANT UNIT 1 DNIlOMENIAL QUALIFICATION OF ELECIRICAL EQUIIMENT EX1DEION TO SCHOUIAR REQUIRDENIS OF 10 GR 50.49(g)

UNIT 1 UNIT 2 CABLE (TYPES) mmber cualified by analysis:

38 50 mmber replaced to date with cualified conponents:

2 2

mmber still to be replaced with malified cxxnponents:

7 0

AC MDICR CDN7BOL CENTERS mmber cualified by analysis:

7 4

. mmber replaced to date with malified components:

0 0

mmber still to be replaced with malified components:

0 0

DC MCyICR CONTROL CENTERS mmber cualified by analysis:

5 6

mmber replaced to date with cualified conponents:

0 0

mmber still to be replaced with cpalified components:

0 0

ELECTRICAL CONNECTIONS (including un-inslated terminal connections, ins lated terminal connections, wire and cable sleeve, inmlated wire splices, and terminal blocks) mmber cualified by analysis:

39 48 mmber replaced to date with malified components:

0 3

mnber still to be replaced with cualified components:

0 1

DP, LEVEL PRESSURE, MO FION SWITUIES mmber. cualified by analysis:

11 5

mmber replaced to date with cualified components:

13 24

mmber still to be replaced with cpalified components:

98 0

2RANSMITIERS (level, gmge and differential presmre, and flow) mmber malified by analysis:

0 4

mmber replaced to date with malified cmponents:

8 154 mmber still to be replaced with cpalified cxxnponents:

17 0

11/2/84

GeorgiaPower d ENCIMURE 1 (Cbntirued)

(Page 4 of 4)

NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HAIG NUCLEAR PIANI' UNIT 1 ENVIROMENI'AL QUALIFICATION OF EIECIRICAL EWIMIENT EXTMEION 10 SCHEDUIAR RE@IREMENTS OF 10 CFR 50.49(g)

UNIT 1 UNIT 2 M010RS M1mber malified by analysis:

17 18 M1mber replaced to date with casalified components:

0 0

Mimber still to be replaced with cpalified components:

0 0

UIMPERATURE EIDDHS

. Mimber catalified by analysis:

0 0

M1mber replaced to date with catalified components:

0 65 Mimber still to be replaced with gialified components:

64 0

70IAL 031IONENIS WI'IYIIN THE @ALIFICATION PROGRN1 Mimber casalified by analysis:

522 558 M1mber replaced to date with cualified components:

339 679 Mimber to be replaced with gialified components:

227 7

M1mber deleted frcm1 program:

6 5

y 11/2/84

~

' Georgia PoserI ENCICSWE 2A EC DOGET 50-321 OPERATING LIGNSE DPR EEMIN I. HATUI NUCLEAR PIANT UNIT 1 ENVIROtNENTAL GRLIFICATION OF EIECIRICAL EQUIINEhT EX7BEION TO SGEDUIAR REQUIREMENIS OF 10.CER 50.49(g) 4 MANHOWS REQUIRED 20 Ol'NPIRIE ALL UNIT 1 OUTAGE WORK

~ GPC has estinated that coupletion of all Unit 1 modifications diring the altrent plant cutage would reglire the following average man-hours per day for each month of that altage:

Average Daily Man-Hours Reglired Month Non-Supervisory Personnel to alpport EQ September 1984 1500 October 1984 2000 November 1984 2550 December 1964 2300 Jaruary 1985 800 t

,[r 11/2/84

.. z.

m

..s GeorgiaPoWerd EmIos0RE 2B-NBC DOCKER 50-321 OPERATING LICENSE DPR-57 EIMIN I. HA'ICH NUCIEAR PIANT. UNIT 1 EQUIINENT QUALIFICATION ITEMS REQUIRING EXTENSION

' STATUS T WORK PACKAGES - MANPOWER RBQUIRED TO CIMPLETE

' The following information.- responds to the request in Its 2 of your letter. dated October 31, 1984,- to provide information on the correct status of design work on Hatch Unit 1. and the specifics of the marpower required to

couplete the installation.

~

' EQ Ita -

Manhours required Work Padcage Affected Syste s Retrofit Maintenance Percent cmplete Replace 18 MOVs 0

3600 75%

(B31, Ell,'E21, E41,' G31)

~ Replace 4 MOVs 0

800 75%

- (E41)

-Replace 2 MOVs 0

400 75%

(E51)

-Replace 1 MOV

-0 200 100%

(B21)

Replace cable 700 0

0%

(N7)

- Replace -instrtunents 12000 2000 60%

(PS2,- T41, N7,~ N8)

ATTS instrtanents 80C00 24000 90%

(B21, C32,~C71, Ell, E21, E41)

- Replace IPCI breaker 0

100 100%

-(Ell)-

Replace power supply

-0 100 100%

g-g,

- (N8) =

Terus teperature 0

300 100%

instrunents (T48)

H 02 Analyzers' 16000I 4500 100%

2(P33, Rll, R24)

LReplace solenoid valve 200 50 100%

and -limit switch (E41)

November 2,1984

GeorgiaPower A ENCLOSURE 3 NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HMOI NUCLEAR PIANT UNIT 1 DIVIROt@GNTAL QUALIFICATION OF ELECTRICAL EQUIHENT EX'IDEION 'IO SOEDUIAR REQUIRDENIS OF 10 CPR 50.49(g)

OVERTIME NNIGD DURING RECENT UNIT 2 OUTEE Nhile installing the ' ATIS on Unit 2 daring the 1984 outage, Plant Hatch

. personnel' worked overtime as 'specified below (this does not include hetirs worked for non-ATIS eglipoent items):

Contractor (Bechtel Ibwer Corporation)

Mimber of Diployees Involved:.

184 Total Overtime Worked:

44,916 bcurs Average Ier Employee:

240.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

.156 (85%) ~ of the above listed contract workers will be utilized for gialified eglipnent installation daring the alrrent Unit 1 outage.

Gecrgia Ivar Coupany

. M1mber.of Bnployees Involved: (Engineering Departirent) 1 (Retrofit Department) 2 (Maintenance Department) 1 Total Overtime Worked:

(Engineering Department) 313.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 365 hairs (Retrofit Department).

56.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (Maintenance Department)

Average Per Biplayee:

(Engineering Department) 313.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (Retrofit Department) 182.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (Maintenance Department) 56.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> All fcur. of the above-listed GPC employees. will be utilized for gialified eglipnent installation d1 ring the alrrent Unit 1 outage.

11/2/84

q m-I

~,:

l

~

LGeoigia Powerd.

ENCIOSURE 4 (Page 1 of 2) 1 NRC DOCKET 50-321

OPERATING LICENSE DPR-57 EDiIN I. HA701 NUCIEAR PLANP UNIT 1 s

EQUIPMENT QUALIFICATION ITEMS REQUIRING EXTENSION NOP ASSOCIATED WITH ATTS OR HYDBOGED/ OXYGEN ANALYZERS The following itens from Enclosure 2 of. our letter dated October 19, c1984, are not associated with ATPS or the hydrogen / oxygen analyzers.

This responds to Iten 4 of your letter dated October 31, 1984.

i Plant MPL Ntanber m uipnent Description B21-F019-Motorized Valve Operator

.B31-E031A,B Motorized Valve Operator Ell-F004D Motorized Valve Operator Ell-E008 Motorized Valve Operator Ell-F009 Motorized Valve Operator Ell-E021A,B Motorized Valve Ooerator Ell-E022 Motorized Valve Operator Ell-E075A '

Motorized Valve Operator E21-F004A,B' Motorized Valve Operator E21-E005A,B Motorized Valve Operator E41-C002(IS-4)

Limit Switch E41-C002(SV1)

Solenoid. Valve E41-E001 Motorized Valve Operator 4

'E41-E003 Motorized Valve Operator

E41-E006 Motorized Valve Operator

-E41-E007 Motorized Valve Operator E41-F0ll Motorized Valve Operator E41-E012 Motorized Valve Operator t.-

E41-F041-Motorized Valve Operator E51-E008 Motorized Valve Operator E51-E031' Motorized Valve Operator

.G31-E001 Motorized Valve Operator PS2-F875.

Motorized Valve Operator PS2-N021 Pressure Indicating Switch T41-N019A,B Tenperature Indicating Switch T41-N020A,B_

7enperature Indicating Switch T41-N02]A,B Temperature Indicating Switch T47-N003 Tenperature Elenent

,f T47-N009-Tenperature Elenent I

~Novenber 2,.1984 a

m.A,.-r.-g,w

--y.

,-e_

s,,,,.,4.-

-ye,.,

.4-.y,_,m.

,w-.--,.,,,-_%%.y-,

,.m.,

- Georgia Power 1 m IoSuRE 4 (Page 2 of 2)

NRC DOCKET 50-321

- OPERATING LICENSB DPR-57 EININ I. HA'ICH NUCLEAR PIANP UNIT 1 EQUIINENP QUALIFICATION ITEMS REQUIRING EXTENSION NOP ASSOCIATIE WI'IH A'ITS OR HYDROGEN / OXYGEN ANALYZERS Plant MPL Nunber Bauipnent Description T48-F112A,B Hydraulic Valve Operator

. N8-K001 Power Stpply T48-K011A,B Power Supply T48-N001 Pressure Transnitter T48-N009A,B,C,D Tenperature Elenent T48-N014A,B Flow Transnitter T48-N021A,B IAvel Transnitter T48-N210 Differential Pressure Switch

. T48-N211 Differential Pressure Switch

-N3-04 Hypalon Jacketed Cable

-N3-19 PVC Jacketed Cable Novenber 2, 1984