Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20040D128
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/11/1981
From: Crane C
FRANKLIN INSTITUTE
To:
Shared Package
ML20040D127 List:
References
RTR-NUREG-0737, RTR-NUREG-737 RFI-C5257-474, TAC-42505, TAC-42506, NUDOCS 8201300272
Download: ML20040D128 (6)


Text

.-

REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ)

REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES FROM NRC EOUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY j

EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT I

George Power Company E. I. Hatch Unit 1 NRC Docket No. 50-321 December 11, 1981 NRC TAC No. 42505 FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, Pennsylvania 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 l

l I

a%

. Franklin Research Center A Division of The Franklir. Institute 8201300272 820107 The Bensnin Franidin Parkway. PNia.. Pa. 19103 (215)448 1000 PDRADOCK05000g P

4 RFI-C5257-474 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors.

FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues i

from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to saf.ety-related equipment potentially exposed to a harsh environment. Tne results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (R?I) is the result of an evaluation of the information provided by letters dated September 14, 1981 (1], February 1, 1982 (2), and March 5, 1981 [3].*

FRC previously requested TMI Action Plan information by telephone memoranda dated July 27, 1981 and September 14, 1981 (4,5].

In response to Reference 4, Georgia Power Company transmitted the following information which was received at FRC on' August 14, 1981 [6]:

1.

Southwest Research Institute letters to Hays Republic Div. Milton Roy Company, dated 29 May 1980, 19 November 1979, 21 February 1980, and 26 February 1980, concertiing SwRI Project No. 11-5453-013,

" Irradiation of Instrumentation."

l l

A.

FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER Information Requested Date Received by FRC**

1.

In reference to the Licensee's 90-day l

rerponse [1] to the NRC SER [7], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation nay proceed:

l

  • Numbers in brackets refer to citations foiand in the list of references.
    • This column will be completed by FRC as the requested information is received.,

000 FranHn Research Center A GAman of The Frarden insomme

RFI-C5257-474 l

Date Received by FRC**

a. Mech. Calculation No. 1, Vol. 5, Rev. O.
b. RNP-2 Mech. Calculation No. 296, Rev. O,
c. General Electric Information Document No.

I 22A5230.

d. Wectinghouse Order No. (test) AT-18008-Yl.
e. Target Rock Corp. Test Report 1559 dated December 13, 1976.
f. Static-O-Ring Test Report 7924-101 dated May 22, 1979.
g. Control System Calculation No.16.
h. HNP-1 Electrical Calculation No. 24.
i. Terminal Block LOC 4 Test by General Electric Co., dated November 6,1973.
j. Wyle Laboratories Report No. 44354-1.
k. Hatch Unit 1, Electrical Calculation No.

28.

1. Hatch Unit 1, Electrical Calculation No.

29.

m. The Okonite Company Engineering Report No. Il0E***
n. The Okonite Company Engineering Report Form N-1.***
o. Hatch Unit 1, Electrical Calculation No.

25,

p. Hatch Unit 1, Electrical Calculation No.

21.

q. Haten Unit 1, Electrical Calculation No.

18.***

      • These documents were previously requested in Reference 5 but have not been received by FRC.

nidin Research Center A Dhemen d the Fransen ensseuse

m RFI-C5257-474 Date Received by FRC**

r. Hatch Unit 1, Electrical Calculation No.

22.

e. HPN-1 Electrical Calculation No. 23.
t. General Electric Qualification Test for 21ectrical Penetration Assemblies, April 30, 1971.
u. Square D.ompany Bulletin NEQ-80,

" Nuclear Environmental Qualification Test Report Summary."

v. BIW Test Report No. 8807.
w. G.E. Bulletin CDS-2195.

x._ Hatch Unit 1, Electrical Calculation No.

27.

y. AMP Engineering Test Report GPR 575-99.

z AMP Engineering Test Report EER-35.

aa. Hatch Unit 1, Elect. Calculation No. 20.

bb. Electroswitch Technical Publication ESC-STD-1000.

cc. Electroswitch Letter dated May 10, 1980.

Subject:

Series 20/40 Radiation Test.

dd. Estimation of Qualified Life of EA740 Series Nuclear Switch, Rev. 3 dated February 27, 1980.

ee. G.E.

Letter G-GPC-0-249 dated October 23, 1980.

ff. G.E. VPP 2793-54-3.

gg. G.E. VPF 3379-243-1.

hh. Central System Calculation 22 Rev. O.

ii. Hatch Unit 1 Electrical Calculation No.

19.

nklin Research Center A Dhamon of The Franken insaeuse

-_--__-__-_____-____--____--__---_.___________-________-_-_-_______a

1 RFI-CS257-474 Date Received by FRC**

jj. Hatch Unit 1 Electrical Calculation No.

26.

kk. General Electric Qualification Report on ECCS l'ator for E. I. Hatch Unit No. 1 NSE 17-0481-1

11. G.E. VPF 3379-214-2 nut. G. E. Letter G-GPC-1-202 dated September 2, 1981.

nn. Rosemount Letter dated August 12, 1981.

oo. Rosemount Report 127227.

pp. Rosemount Report 97215A.

l l

l l

l

_4 p

d Frankun Research Center A Ommen of The Feensen insumune l

1 I

RFI-C5257-474 t

REFERENCES 1.

J. T. Beckham, Jr.

Letter to J. P. O'Reilly, NRC.

Subject:

Environmental Qualification of Safety-Related Equipment; Revision 3 - Response to SRF for Edwin I. Hatch Nuclear Plant Gr.crgia Power Co.,14-Sep-81 2.

W. A. Widner Letter to J. P. O'Reilly, NRC.

Subject:

Response to IE Bulletin 79-OlB Supplement 3.

Georgia Power Co., 01-Feb-81 3.

W. A. Widner Letter to J. P. O'Reilly, NRC.

Subject:

Georgia Power Company's Update of its IE Bulletin 79-OlB Response dated February 17, 1981.

(Attached)

Georgia Power Co., 05-Mar-81 4.

Telephone Meircrandum J. A. Murphy (FRC) with R. Baker (Georgia Power Co.)

Subject:

Request for Information for Hatch Units 1 and 2 July 27, 1981 5.

Telephone Memorandum K. Iepson and D. Schmitz (FRC) with R. Baker (Georgia Power Co.)

Subject:

Pequest for Information for Hatch Unite. 1 and 2.

Septembec 14, 1981 6.

Draf t letter to FRC, transmitting documentation references and cold shutdown information.

(Information requested via telecon, 7/24/81.)

Letter received 8/14/81.

Georgia Power Co., 00-Aug-81 7.

Office of Nuclear Reactor Regulation Safety Evaluation Report for Hatch Unit 1 Environment; A Qualification of Safety-Related Electrical Equipment NRC, 16 Jun-81 8

NUREG-0737, " Clarification of TMI Action Plan Requirements" NRC, November 1980 nklin Research Center A Dhamon d Tha Franien Insomme I