Discusses Corrective Actions Re Implementation of Operating Procedures to Resolve Concerns Referenced in GE SIL 299 & SIL 299 Suppl 1 Concerning Leg Flashing of Yarway Level Instruments & Cold Leg Flashing of Ge/Mac Level Instruments
ML20040H179
Person / Time
Site: Hatch  
Issue date: 02/10/1982
From: Head G
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8202170392
Download: ML20040H179 (2)


Text

r bf.*f'4 73 b 4 8'f CCF fMrW g

O

=

s 331 P4"1r*ont Aworv AUan*a Gmfg c 10308 T.:'ernow 40t R 4 M 9 f *s' nq hrf:lm;c Pzt 09e Rm 45%

Avanta G" * ;a 30W G. F. Head 4nar Wr..: Prr

1. r i Po r e G,-

f >

e Director of Nuclear Reactor Regulation f

W Q:ihyg Qg d IO8& 1 f

U. S. Nuclear Regulatory Commission 2

j 8

Washington, D. C.

20555 4bre$%

5 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, tPF-5 b/

EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 6

IPPLEMENTATION GF GE SIL 299 AND SIL 299 StPPLEMENT 1 Gentlemen:

On January 27, 1982, a meeting was held between the BWR Owners Group and the tEC to address the adequacy of core cooling detection.

The NRC expressed concern about the changing of plant operating procedures to alert the operators to the conditions referenced in General Electric Company SIL 299 and SIL 299, Supplement 1 (Reference leg flashing of Yarway level instruments and cold leg flashing of GE/MAC level instruments).

At that time, an agreement was reached that the BWR Owners Group would survey all BWR operators to determine if procedures had been implemented to resolve the concerns referenced in SIL 299 and SIL 299, Supplement 1.

This survey was to be completed by February 10, 1982.

The tRC also requested a letter - from each licensee stating the current compliance status of their plant; that is:

1.

Procedures in place to address reference leg flashing (as described in SIL 299) and cold leg flashing (as described in SIL 299, Supplement 1) and the date by which this was accomplished, or 2.

Schedule for implementing procedures.

Actions taken to correct the reference leg flashing of the Yarway level instruments were as follows:

1.

Hatch Unit 1 A Design Change Request was written to increase the setpoint a.

fj of the automatic depressurization system (ADS) permissive /'g/

switches in the conservative direction so as to ensure ADS actuation capabilities under post-LOCA conditions.

(NOTE:

This setpoint change takes into consideration the effect of

/ D the post-LOCA high temperatures on the Yarway reference leg).

This change was implemented on May 29, 1980 and the affected functional test and calibration procedures were revised to reflect the setpoint change.

8202170392 820210

~

PDR ADOCK 05000321 P

PDR

r q.

GeorgiaIbwer d Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 February 10, 1982 Page Two b.

The plant procedure for Pipe Break Inside Primary Containment was revised to provide operators with a method of making temperature corrections to level' readings - thus providing a method of determining the true reactor water level under accident conditions.

The procedure revision was signed by the Plant Manager on October 15, 1979.

2.

Hatch Unit 2 a.

A Design Change Request was written to increase the setpoint of the ADS permissive switches in the conservative direction so as to ensure ADS actuation capabilities under post-LOCA.

conditions.

(NOTE:

This setpoint change takes into consideration the effect of the post-LOCA high temperatures on the Yarway reference leg).

This change was implemented on January 23, 1980 and the affected functional test and calibration procedures were revised to reflect the setpoint change.

b.

The plant procedure for Pipe Break Inside Primary Containment was revised to provide operators with a method of making temperature corrections to level readings - thus providing a method of determining the true reactor water level under accident conditions.

The new revision was signed by the Plant Manager on October 15, 1979.

No corrective action has been taken to date on the GE/MAC cold leg flashing problem; however, procedure revision requests to do so will be submitted to the Plant Review Board by February 18, 1982.

This will consist of revising the plant procedure for Pipe Break Inside Primary Containment to provide operators with a method of determining the true reactor water level, as indicated by the GE/MAC instruments, under accident conditions.

If you have any comments or questions, please contact this office.

Very truly yours,

f. 4. /24 G. F. Head WEB /mb xc:

M. Manry R. F. Rogers, III J. P. O'Reilly (NRC - Region II)