ML20106D111
| ML20106D111 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/19/1984 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NED-84-550, TAC-55488, TAC-55489, NUDOCS 8410250002 | |
| Download: ML20106D111 (13) | |
Text
f
- Georg a Pcu,:r Ccmpany 333 Piecnont Avenue A%nta. Georgia 30308 Telephore 404 5266526 Ma hng A#ess:
A Post Off ce Ucx 4545 At:anta, Georpa 20302 Georgia Power L. T. Gucwa t?v scurrven en tr1 sr,:em Manager Nuclear Engineer;ng and cnet nuclem Eng neer NED-84-550 ll45N October 19, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Camission Washington, D. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR FIANT UNIT 1 RESPONSE TO REQUEST FOR ADDITIONAL INmFNATION ECUIH4ENT CUALIFICATION PROGRIM DEADLINE EXTENSIONS Gentimen:
By "05000366/LER-1984-019, :on 840924,outboard Reactor Water Cleanup Sys (RWCU) Primary Containment Isolation Valve [[SSC" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Closed & RWCU Pump 2G31-C001A Tripped.Caused by Failure of Two ATTS Master Trip Units.New Units Installed|letter dated October 12, 1984]], the NRC staff rquested certain additional information for use in the review of quipnent qualification deadline extension rquests submitted by Georgia Power Cmpany (GFC).
The staff rquested that this information be submitted by October 19, 1984.
Each of the four itms of infomation rquested by the above-referenced NRC letter, followed by the GPC response to each its, are presented below:
NRC Its No. 1 Your best estimate regarding the time necessary to cmplete the installation of all quipnent currently qualified and available, based on an extension of the fall 1984 outage.
GEC Response to Its No.1 GEC estimates that with a few exceptions, installation (i.e.,
placing into service) of all replacment quipnent on the Unit 1 master list for which replacment is rquired under 10 CFR 50.49, would rquire an outage of approximately 21 weeks duration.
In addition to quipncat associated with the I+jdrogen and Oxygen Analyzer Systs which has bcen addressed in previous correspondence, we have recently identified that cmponents Ell-N002 A,B (i.e., differential pressure tranmitters) were received with an incorrect rangc.
These differential pressure tranmitters have been returned to the factory and may not be returned in time for installation during the present outage.
A listing of those itms which are not currently qualified or available, for which GIC still rquests an extension of the qualification deadline to Novmber 30, 1985 is contained in Enclosure 1 to this subnittal.
8Yf 0410250002 041019 PDR ADOCK ODOOO321 P
PDR gg
-Georgia Power A
- Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, 011ef Operating Reactors Branch No. 4 October 19, 1984 Page W o NRC Itan No. 2
%e feasibility of empleting the insta.lation of a substantial noter of the itens for which you have requested extensions, based on an extension of the current outage, if the installation of certain ajuipnent would reluire significant delay.
GIC Response to Item No. 2 GIC has determined that as alternatives to the installation plan outlined in the above response to Itan No.1, the following three other partial installation plans would be feasible:
a)
Option A:
his option describes the scope of installation activities previously scheduled by GPC during the present outage.
In addition, subsequent to our September 11, 1984 letter describing this scope, a few additional ATIS instrments are now included in the scope of Option A due to a physical relocation of instrment l
panels.
Installation of one of the instruments will require a l
change to the Technical Specifications. A separate letter is being l
subnitted on this subject.
his plan would require an outage of I
approximately 10 weeks.
Deadline extensions to November 30, 1985 would be required for the itens listed in Enclosure 2 to this letter.
b)
Option P:
@is plan would include installation of all itens in l
Option A above, as well as a nmber of additional equipnent itens.
I Deadline extension to November 30, 1985 would be needed for all itens listed in Enclosure 3 to this subnittal.
%is plan would result in an estimated outage length of approximately 15 weeks and l
would result in the installation of approximately one-iourth of those items for which schedular relief has been requested.
c)
Option C: %is plan includes installation of all items covered by both Options A and B atove, along with a neber of additional itens. @e few items which would retuire an extension to Novenber 30, 1985 are listed in Enclouste 4 to this subnittal.
%is plan would ratuire approximately 18 weeks of plant outage time to ceplete and would result in the installation of approximately two-thirds of those itens for which schedular relief has been reiuested.
,/
y GeorgiaRnver A
,[
{ j fl Director of Nuclear Reactor Regulation
['
Attention: Mr. John F. Stolz, Chief r
i' p/
Operating Reactors Brand No.' 4
. October 19, 1984 Page tree
[!
[
\\ !
-f1 pf t'f NRC Its No. 3 he feasibility of installing this equipent during operation of,thib 1.'
, y,d '
GPC L.wGr.ee to Its No. 3
(
GPC has ' determined that replacment of more than.a very fewiof' t p r
required itms during Unit 1 operation could severaly impu::t p1Mc operability and could significantly impact plant ' safety and r*
reliability.
Ibether, see equipent installation requires work ~in areas normally inaccessible during plant operation, due to radiation l
levels.
Installation of the few ites with the plant operuting for 7
which this option is feasible would not significantly refhr:e any of tie /.
l estimated outage lengths given in the responses to It ma No. I and No.'l above.
%erefore, GPC has determined that equipunt installa: ion with the plant operating (outside of the preliminary ectivities V1ich have 7
already been performed) is not a satisfactory methnd fo-use in
./
copleting any significant portion of the qualitication piogem..
e/
NPC tte No. 4 e!
)f,4 Confirmation that all previously-sutaitted justifications for contimed
'i l
operation (Joos) deonstrate that assumed equiprent failures wi2l rot'
,c '
significantly degrade any sa ety function or misleed the operator.
r I
f,;I h
e GPC Response to Its No. 4
,i I,
\\
I GPC has previously sutaitted JCDs for all but one of the outstanding l
Unit 1 squipent qualification ites by letters dated Only 24, 1984 arp i
Septaber 26,1984 (tED-84-393 and 508, respectively). % e JCU for Itm,
E41-C002 (SV1), which appoars at the botta of page 1 o( Enclosure 2/
l l
was sutaitted prior to the two letters noted above, 'and is being resutaitted here for empletion, (Enclosure 5).
l As noted above, we are currently proceeding with Oplion A.
%is plan,
contains a scope of work activities estimated to be possible during an/
'o outage of approximately 10 weeks.
If the joutage which began on Septesber 29, 1984, is extended des to other feetors, GPC will endeavor to coplete additional envirorwental qualification, / cogem related installation
/
activities commensurate with the expected outage and date.
- J{
r/
J.'
,,q 6
3\\,
/
3i
{
f, s
~
./
s e
-,,.-,-,.~._,_-,,---.____,__.___,,},l
- )h
Georgialbwer A Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Brand No. 4 r
October 19, 1984 Page Four T
l l
Pursuant to the requirments of 10 CFR 50.92, J. L. Ledbetter of the f
Georgia Department of Natural Resources will be sent a copy of this letter and all applicable attachments.
I, L.
T. Oucwa, state that I am Manager Nuclear Engineering & Chief
/
Nuclear Engineer and to the best of sty knowledge and twlief the facts set i
forth in this letter are true.
(f, GEOPGIA POWER CTMPANY
- o
/
^ f^ ?
Syg L. T. Gucwa horn to subscribed. fore me this 19th day of October,1984.
r Nobry RAlic, Georgia, State at Lary i
(
p-L My comminion to.r sept.141se7 Notary Public i
)
CDSAnb Enclosures xc:
J. T. Deckh m, Jr.
- 11. C. Nix, Jr.
f#
Senior Resident Inspector J. P. O'Reilly, (tStC-Region II) g i
J. L. I4dbetter y
/
h, a
l
\\
t
?-
r g
s' s
ll t
p..
.?
I
- L
- w
., 3 NRC DOGET 50-321-OPEIRTING-LICENSE DPR-57 EIMIN I. HNICI NUCIFAR'PIANT UNIT 1:
ITINS MiIQI ARE NOT CURRENTLY QUALIFIED OR AVAIIABLE FOR INSTALIATION
.s GPC reglests that the -10 CFR 50.49(g) 'glalification deadline N extend d
~
to November 30,.1985, for the following estipment-items-r Plant MPL N1mber Balipment Description e
.e Ell-N002A,B Differential Presaire Transmitter s
s 4
P33-P001A,B Hydrogen and Oxygen Analyzer System I1 Rll-S039 Transformer *
>s Rll-SO40 Transformer *
.c R24-S0ll Panelboard*
R24-S012 Panelboard*
'i-s 4
h S,
s
'T October 19, 1984-i 1
l
+
\\
T' g
6
,u
.w
~~,,nvv
,s c
--+ 1
~
n Georgia Power d acIoSuas 2 (page 1 of 3)
NRC D00GT 50-321 OPERATING LICENSE DPR-57 EDNIN I. HA'ICH NUCIZAR PIANT UNIT 1 EQUII+ENT QUALIFICATION IROGRAM DEADLINE EXTENSION REQUEST FOR OPTION A OUTAGE SCDPE GPC recuests.that the 10 CFR 50.49(g) cpalification deadline be extended to Notember 30, 1985, for the followirg eglipment items:
Plant MPL M1mber Equipnent Description B21-F019 Motorized Valte. Operator B21-N006A,B,C,D Differential Presaire Indicating Switch B21-N007A,B,C,D Differential Presaire Indicating Switch B21-N008A,B,C,D Differential Presaire Indicating Switch B21-N009A,B,C,D Differential Presaire Indicating Switch B21-N010A,B,C,D Tenperataire Switch B21-N011A,B,C,D
'1bmperature Switch B21-N012A,B,C,D Tenperature Switch B21-N013A,B,C,D Temperature Switch B21-N036 Invel Indicating Transmitter Switch B21-NO37 Invel Indicating Transmitter Switch B31-F031A,B m torized Valve Operator C71-N002A,B,C,D Presaire Switch Ell-F004D mtorized Valve Operator Ell-E008 m torized Valve Operator Ell-F009 m torized Valve Operator g'
E11-E021A,B m terized Valve Operator Ell-F022 s torized valve Operator Ell-E075A m torized Valve Operator Ell-N002A,B Differential Presm re Transmitter Ell-N010A,B,C,D Presaire Switch Ell-N0llA,B,C,D Presaire Switch Ell-N015A,B Flow Transmitter Ell-N016A,B,C,D Presaire Switch Ell-N020A,B,C,D Presaire Switch Ell-N021A,B Differential Pressure Indicating Switch E41-C002(SV1)
Solenoid Valte October 19, 1984 i
r u.
p.
" Georgia Power ENcIosusE 2 (page ' 2 of 3) _
l
- NRC DOGET 50-3211 OPERATING LI NSE DPR [;.
' EDfIN I. HA'ICH NUCLEAR PIMrf IMIT-1 EQUIPM!NT GALIFICATION PROGRAM DEADLINE EX'IENSION iesuutur POR OPTION A OLTTAGE SCOPE
,..m Plant MPL M1mber Ptglipment Description E21-2004A,B Motorized Valve Operator.
E21-F005A,B --
Motorized Valve Operator
'E21-N003A,B Flow Transmitter E21-N006A,B Flow Indicating' Switch
E21-N008A,B Presaire Switch -
E21-N009A,B' Presaire Switch E41-C002(IE-4)
Limit Switch E41-F001 Motorized valve Operator-E41-F003 Motorized Valte Operator E41-F006 Motorized valve Operator-E41-F007-Motorized Valve Operator E41-F011 Motorized Valve Operator E41-F012-mtorized. Valve Operator E41-F041 Motorized valve Operator E41-N006.
Flow Switch E41-N008 Flow Transmitter E41-N010 Presaire Switch E41-N012A,B,C,D Pressure Switch E41-N015A,B Ievel Switch E41-N017A,B~
Presaire' Switch E41-N027 Presaire_ Switch E41-N030A,B Tenperature Elenent E41-N046A,B-Tenperature Element E51-F008 m torized Valve Operator E51-F031 Motorized Valse Operator E51-N012A,B,C,D Presaire Switch E51-N017 Differential Presaire Indicating Switch -
E51-N018 Differential Pressure Indicating Switch
.E51-N019A,B,C,D
- Presaire Switch E51-N023A,B.
Tenperature Element E51-N025A,B,C,D Temperature Element
.E51-N026A,B,C,D Tenperature Element E51-N027A,B,C,D Tenperat11re Element October 19, 1984 i
s li:
i A
e m de
-ws ew e --r-wwu,
.es,-4-+M.
m--p r-r-e-e t4 7--e rf -w #-
- e-Yt %'7 m"
7
'f w-
g 4
- 1 GeorgiaPower d enclosure 2
- (page -3 of 3)
- l
^
~
NRC DOCKET 50-321-OPEIRTING LICENSE'DPR '-
EDfIN I.- HATCH NUCIEAR PLANT INIT 1 1 EQUI 19ENT GJALIFICATION PROGRAM DEADLINE.
EXTENSION REQUEST POR OPTION A OtfrAGE SOOPE
- Plant MPL M1mber-
.' B311puent Description
' G31-F001 Motorized Valve Operator G31-N012 Flow Transnitter -
- G31-N016A,B,C,D,E,F Temperataire Element G31-N022A,B,C,D,E,F Tenperature Element G31-N023A,B,C,D,E,F Temperat21re Element G31-N036 Flow Transmitter G31-N041 Flow Transmitter P33-P001A,B Hydrogen and. Oxygen Analyzer System PS2-ES75-m torized Valve Operator P52-N021 Presaire Indicating Switch Rll-S039 Transformer *-
Rll-S040 Transformer
- R24-S0ll Panelboard*
R24-S012 Panelboard*
T41-N019A,B Temperata1re Indicating Switch T41-N020A,B Temperature Indicating Switch T41-N021A,B Tenperat21re Indicating Switch '
T47-N003 Tenperature Element T47-N009 Tenperature Element T48-Fil2A,B Hydraulic Valve Operator T48-K001 Power alpply T48-K011A,B Power alpply
.T48-N001 Pressure Transmitter T48-N009A,B,C,D Tenperature Element
-T48-N014A,B Flow Transmitter T48-N021A,B Ievel Transmitter T48-N210 Differential Press 2re Switch-T48-N211 Differential Pressure Switch N3-04 Hypalon Jacketed Cable N3-19
'PVC Jacketed Cable
^
- *EcElipnent associated with the Hydrogen and Oxygen Analyzer System LOctober 19,:1984 b
e+
,.p
,o se,, - v -- --
ww
-w--
r w.-
-w
=
e.
'e---e--=
.- * = - <
~~w-v w r--
e m+e
-ran+
-m--
m
Georgia Power A EncIoSURE 3 (page 1 of - 2) _
NRC DOGET 50-321 OPERATING LICENSE DPR-57 ENIN I. HA7CH NUCLEAR PIANP (NIT 1 BQUIPENT QUALIFICATION PROGRAM DEADLINE EXTENSION REQUEST EUR OPTION B OUTAGE SCDPE GPC requests that the 10' CER 50.49(g) malification deadline be extended to November 30, 1985, for the-following eglipment items:
Plant MPL M1mber Balignent Description B21-N006A,B,C,D Differential Presaire Indicating Switch B21-N007A,B,C,D Differential Presaire Indicating Switch B21-N008A,B,C,D Differential Presmre Indicating Switch B21-N009A,B,C,D Differential Presaire Indicating Switch B21-N010A,B,C,D Tenperature Switch B21-N011A,B,C,D Tenperature Switch B21-N012A,B,C,D Tenperature Switch B21-N013A,B,C,D Tenperature Switch B21-N036 Invel Indicating Transmitter Switch B21-N037 Invel Indicating Transmitter Switch C71-N002A,B,C,D Presaire Switch Ell-N002A,B Differential Presaire Transmitter Ell-N010A,B,C,D Presaire Switch Ell-N0llA,B,C,D Presaire Switch Ell-N015A,B Flow Transmitter Ell-N016A,B,C,D Fresaire Switch Ell-N020A,B,C,D Presaire Switch Ell-N021A,B Differential Presaire Indicating Switch E21-N003A,B Flow Transmitter E21-N006A,B Flow Indicating Switch E21-N008A,B Presaire Switch E21-N009A,B Pressure Switch E41-N006 Flow Switch E41-N008 Flow Transmitter
.E41-N010 Presaire Switch E41-N012A,B,C,D Presaire Switch E41-N015A,B Ievel Switch E41-N017A,B Presalte Switch E41-N027 Presaire Switch E41-N030A,B Tenperature Element E41-N046A,B Tenperature Element October 19, 1984
' Georgia Power A EncIoSURE 3 (page 2 'of 2)
NRC DOCKET 50-321-OPERATING LIGNSE DPR-57 EDWIN I. HA'ICH NUCIEAR PIANT UNIT 1 EQUIIM:NT CUALIFICATION PROGRAM DEADLINE EXTENSION REQUEST FOR OPTION B OUTAGE S(DPE Plant MPL M1mber Eg.11pment Description-E51-N012A,B,C,D Pressure Switch E51-N017 Differential Pressure Indicating Switch E51-N018 Differential Presaire Indicating Switch E51-N019A,B,C,D Presaire Switch E51-N023A,B Tenperature Element E51-N025A,B,C,D Tenperature Element E51-N026A,B,C,D Temperature Element E51-N027A,B,C,D Tenperature Element G31-N012 Flow Transmitter G31-N016A,B,C,D,E,F Tenperature Element G31-N022A,B,C,D,E,F hmperature Element G31-N023A,B,C,D,E,F Tenperature Element G31-N036 Flow Transmitter G31-N041 Flow Transmitter P33-P001A,B Hydrogen and Oxygen Analyzer System P52-F875 Motorized Valve Operator Rll-S039 Transformer
- Rll-SO40 Transfonner*
R24-S0ll Panelboard*
R24-S012 Panelboard*
T41-N019A,B Tenperature Indicating Switch
. T41-N020A,B
'IWnperature Indicating Switch T41-N021A,B Tenperature Indicatirn Switch 4
rn s.
' Georgia Poiver A EscIoSURe 4-(page.l of 1)
NRC DOCKET 50--321
. OPERATING LICENSE DPR EIMIN I.- HATCH NUCLEAR PLANF UNIT 1 EQUIMENT QUALIFICATION PROGRAM DEADLINE -
EXTENSION REQUEST FOR OPTION C OUTAGE SG)PE
. GPC remests that the 10 CER 50.49(g) malification deadline be extended
-to Nommber 30, 1985, for the following em ipment items:
Plant MPL M1mber B:pipment Description
-B21-N010A,B,C,D Temperature Switch B21-N011A,B,C,D Tenperature Switch B21-N012A,B,C,D Tenperature Switch B21 N013A,B,C,D Tenperature Switch Ell-N002A,B-Differential Presaire Transmitter E41-N030A,B Tenperature Elenent E41-N046A,B' Tenperature Elesnent E51-N023A,B Temperature Element E51-N025A,B,C,D Tenperature Element E51-N026A,B,C,D Tenperature Element E51-N027A,B,C,D Tenperature Element G31-N016A,B,C,D,E,F Tenperature Element -
G31-N022A,B,C,D,E,F Temperature Element G31-N023A,B,C,D,E,F Tenperature Element P33-P001A,B Hydrogen and Oxygen Analyzer System PS2-F875 Motorized Valve Operator Rll-S039 Transformer
- Rll-SO40 Transformer
- R24-S0ll Panelboard*
R24-S012 Panelboard*
T41-N019A,B 7enperature Indicating Switch T41-N020A,B Tenperature Indicating Switch T41-NO21A,B Temperature Indicating Switch
,,y v..w...-..w,
- -, ~.
,,m.-
v.-
G00rgia Powerd ENCIOSURE 5 NRC DOCITI 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'IGI NUCIEAR PIANT UNIT 1 EOUIRENT QUALIFICATICN PROGRAM DEADLINE EXTESION REQUEST - JCD FOR E41-C002- (SV1)
'Ihe attached. justification for continued operation.provides the basis for continued. operation in support of iten E41-C002 (SV1) and replaces the page 46 previously subnitted.
October. 19, 1984 i
i
~
y
REV. 2 i
ATTAONENT 2 E41-C002 E41-C002 is the HPCI Turbine and auxiliaries [ including E41-C002(SV1)].
The ~ HPCI Turbine _could be subjected to a harsh enviroment due to tenperature ' after a HPCI stem line break, but no credit is taken for the operation of the HPCI W rbine following a rupture of its stem supply line.
In the event of a large break IOCA for which the HPCI systen cannot maintain RPV level, the Turbine may be subjected to high radiation. However, in this case the HPCI System-is not required since the PRV will be depressurized by the break and/or the actuation of the ADS Systen. Adaluate core cooling is then provided by the low pressure ECCS systens.
In the event of a snall break IOCA for which the HPCI can maintain RPV level, the core never uncovers and hence core cooling is maintained and the radiation enviroment is not present.
'Ihis piece of equignent has been used during normal operation in plants similar to Hatch 1 for the past eleven (11) years. To date, no age related comon mode failures have been reported.
These devices have experienced relatively limited service in Hatch 1 as they have been use.d during normal operation for only five (5) years. With this limited service this equipnent is not expected to fail before replacanent.
Based on the above, continued operation is justified.
46 i
L
._ --.