Letter Sequence Other |
|---|
|
Results
Other: ML19338E122, ML19338E126, ML19339B208, ML19340B681, ML19347D323, ML19347E204, ML20008F589, ML20009F108, ML20033D218, ML20040H345, ML20050C823, ML20054E801, ML20062J441, ML20065H986, ML20070L991, ML20071N774, ML20074A858, ML20076F399, ML20080Q925, ML20080Q937, ML20090H443, ML20091M568, ML20098E985, ML20099C148
|
MONTHYEARML19338E1261980-08-29029 August 1980 Order for Mod of Licenses DPR-57 & NPF-5 to Add Info Which Fully Responds to NRC Request for Info Re Environ Qualification of safety-related Electrical Equipment.Info Should Be Submitted by 801101 Project stage: Other ML19338E1221980-08-29029 August 1980 Forwards Order Requiring Info Supporting Environ Qualification of safety-related Electrical Equipment. Requests Submittal of Info by 801101 Project stage: Other ML20062J4411980-09-19019 September 1980 Revised Order for Mod of License Requiring Timely Submission of Info Previously Requested Re Environ Qualification of safety-related Electrical Equipment Project stage: Other ML19340B6811980-10-24024 October 1980 Revised Tech Spec Pages Per 801024 Order for Mod of Licenses Re Environ Qualification of safety-related Electrical Equipment Project stage: Other ML19339B2081980-10-31031 October 1980 Provides Info Re Environ Qualification of safety-related Equipment in Response to DG Eisenhut .Util Is Willing to Participate in Establishment of Standardized Equipment Environ Qualification Acceptance Criteria Project stage: Other ML19347D3231981-02-17017 February 1981 Confirms Commitment to Install Qualified Limit Switches & Solenoids by 820630.Commitment Will Be Reflected in Package Updating Util Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment Project stage: Other ML19350C6801981-04-0101 April 1981 EN-81-11:on 810407 Notice of Violation & Proposed Imposition of Civil Penalties Will Be Issued to Util Based on Alleged Violations Re Inadequate Sampling Procedures Which Allowed Contaminants to Reach Unrestricted Area Project stage: Request ML20003E6901981-04-0101 April 1981 Forwards Partial Review of Environ Qualification of safety- Related Electrical Equipment.Written Response Required within 10 Days Project stage: Approval ML20008F5891981-04-13013 April 1981 Responds to NRC 810401 Evaluation of Util Response to IE Bulletin 79-01B Re Environ Qualification of safety-related Electrical Equipment.Potential Deficiencies Will Not Impact Facility Safe Operation.Detailed re-evaluation to Follow Project stage: Other ML19347E2041981-04-20020 April 1981 Advises of Error in NRC Re Environ Qualification of safety-related Electrical Equipment.No Caustic Sprays Are Used in Either Containment.Phrase in Section 3.2 Should Be Deleted Project stage: Other ML20009F1081981-07-14014 July 1981 Forwards TER-C5417-9, Equipment Environ Qualification,Hatch Nuclear Plant Unit 1, Final Technical Evaluation Rept.Rept Replaced 810131 Rept Project stage: Other ML20033D2181981-11-16016 November 1981 Forwards Info on Issues Discussed During 810806 Telcon in Support of Extension of 820630 Deadline for Compliance W/ Environ Qualifications Guidelines,Per IE Bulletin 79-01B Project stage: Other ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info Project stage: Request ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info Project stage: Request ML20040H3451982-02-10010 February 1982 Forwards Info Requested in Re Environ Qualification of safety-related Electrical Equipment.Encl Withheld (Ref 10CFR2.790) Project stage: Other ML20040H1791982-02-10010 February 1982 Discusses Corrective Actions Re Implementation of Operating Procedures to Resolve Concerns Referenced in GE SIL 299 & SIL 299 Suppl 1 Concerning Leg Flashing of Yarway Level Instruments & Cold Leg Flashing of Ge/Mac Level Instruments Project stage: Request ML20049J3361982-02-25025 February 1982 Forwards Request for Addl Info Needed to Continue Review of Environ Qualification Program for safety-related Electrical Equipment.Response Due in 30 Days Project stage: RAI ML20050C8231982-04-0505 April 1982 Forwards Addl Info in Response to 820225 Request Re Peak Containment Temps for Equipment Qualification.Small Steam Line Break Analysis Peak Drywell Temps Lower than FSAR DBA Temps Project stage: Other ML20054E8011982-06-0707 June 1982 Forwards Franklin Research Ctr Requests for Addl Info Re Equipment Environ Qualification Program.Response Requested within 30 Days Project stage: Other ML20055A0811982-07-0909 July 1982 Responds to NRC 820607 Request for Addl Info on Correlation Between TMI Action Plan Equipment & Specific Sections in NUREG-0737.Procurement of Equipment Per Scope of IE Bulletin 79-01B Will Meet NUREG-0588 Requirements Project stage: Request ML20065H9861982-09-28028 September 1982 Forwards Schedule for Qualification Testing of Analog Transmitter Trip Sys,In Response to 801001 Request Project stage: Other ML20070L9911983-01-0303 January 1983 Updates 801101 Response to IE Bulletin 79-01B Re Electrical Equipment Qualification.Completion of Mild Environ Qualification Programs Deferred Until Publication of Final Rule (SECY-82-207).Summary of Outstanding Items Encl Project stage: Other ML20074A8581983-05-0606 May 1983 Submits 30-day Response to SER & Technical Evaluation Rept Re Environ Qualification of Class IE Equipment (IE Bulletin 79-01B).Final Plans for Resolving Qualification of Items in Categories I.B,Ii.A & Ii.B Will Be Transmitted by 830520 Project stage: Other ML20071N7741983-05-20020 May 1983 Forwards Rev 0 to Ei Hatch Nuclear Plant Units 1 & 2 Environ Qualification of Class IE Equipment, in Response to IE Bulletin 79-01B & 10CFR50.49 Requirements Project stage: Other ML20076F3991983-06-0808 June 1983 Advises That SER & Technical Evaluation Repts Re Environ Qualification of safety-related Electrical Equipment Do Not Contain Proprietary Info.Repts May Be Placed in PDR Project stage: Other ML20093E1001983-12-0909 December 1983 Design Stress Rept Project stage: Other ML20083H8061984-01-0606 January 1984 Notifies of Equipment Qualification Problems Which Could Result in Request for Extension of 10CFR50.49 Rulemaking Deadline Project stage: Request ML20080Q9371984-02-24024 February 1984 Post-Accident Temp & Pressure Profiles Project stage: Other ML20080Q9251984-02-24024 February 1984 Forwards Containment post-accident Profiles Utilized in 10CFR50.49 Qualification Program & Extended Drywell Temp Analysis.Drywell Temp Analysis Withheld (Ref 10CFR2.790) Project stage: Other ML20087P1721984-03-30030 March 1984 Discusses 840214 Meeting W/Nrc Re Ongoing Program Developed for Qualification of Electrical Equipment.Central Qualification Documentation File & Master List of All Equipment Established.Rept on Methodology Used Encl Project stage: Meeting ML20087P1251984-04-0303 April 1984 Notifies of Potential Problem Re 10CFR50.49 Equipment Qualification Deadline.Qualification Testing Program for Pyco Resistance Temp Detectors & Qualification of Valve Motor Operators Could Require Extensions Project stage: Other ML20091M5681984-06-0404 June 1984 Forwards Addl Info Requested Per Re Electrical Equipment Qualification,Covering Balance of Plant Components,Nsss Components & Methodology to Identify Equipment Per 10CFR50.49(b) Project stage: Other ML20090B9201984-07-0606 July 1984 Requests Extension of Environ Equipment Qualification Deadline for Analog Transmitter Trip Sys Until 851130 So Necessary Equipment Installation Can Be Completed During 1985 Scheduled Refueling Outage Project stage: Other ML20093E0841984-07-12012 July 1984 Forwards Design Stress Rept, in Attempt to Resolve Seismic Problem.Requests Exemption from Outage Based Deadline Specified in 10CFR50.49(g) for Motorized Operators on Valves 2E11-F016A&B Project stage: Other ML20093F6651984-07-17017 July 1984 Requests Extension Be Granted for Existing Unit 1 Hydrogen & Oxygen Analyzers.Replacement of Existing Analyzers Scheduled for Fall 1985 Refueling Outage.Qualification Deadline Extension to 850331 Requested for Unit 2 Analyzers Project stage: Other ML20090F8741984-07-19019 July 1984 Forwards Rev to Equipment Qualification Program,Per 840706 Request for Deadline Extension for Analog Transmitter Trip Sys Project stage: Request ML20094B6281984-07-19019 July 1984 Notifies of Potential Equipment Qualification Problems Re 10CFR50.49 Equipment Qualification Deadline.Problems Result from Inability of Pyco,Inc to Provide Qualification for Resistance Temp Detectors in Use Project stage: Other ML20090H4431984-07-24024 July 1984 Forwards Response to IE Bulletin 79-01B,consisting of Justifications for Continued Operation of balance-of-plant Components,Nsss Components & Unit 2 balance-of-plant,per 840716 Telcon Project stage: Other ML20093J6571984-07-24024 July 1984 Requests Further Extension of 10CFR50.49(g) Environ Qualification Deadline for Motorized Actuators on RHR Isolation Valves 2E11-F016A & B,Until Startup Date Following Next Refueling Outage in May 1985 Project stage: Other ML20097D9911984-09-11011 September 1984 Requests Extension Until 851130 of Equipment Qualification Program Deadline,Per 10CFR50.49(g),due to Delays in Extensive Equipment Replacement Effort.Response Requested So Final Planning for Upcoming Outage Can Proceed Project stage: Other ML20098F0701984-09-26026 September 1984 Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage Limits Project stage: Request ML20098E9851984-09-26026 September 1984 Forwards New &/Or Revised Pages to 840724 Equipment Qualification Program Justifications for Continued Operation Transmittal.Revs Due to Changes in Qualification Status of Certain Equipment Project stage: Other ML20093E4431984-10-0404 October 1984 Resubmits List Updating & Combining Items in Equipment Qualification Program.Extension of Qualification Program Deadline to 851130 Requested Project stage: Other ML20106D1111984-10-19019 October 1984 Responds to 841012 Request for Addl Info Re Extension of Deadline for Equipment Qualification Until 851130 Project stage: Request ML20106E2851984-10-23023 October 1984 Forwards Corrections to 841019 Response to NRC Request for Addl Info Re Util Request for Schedular Relief from Certain Environ Qualification Requirements Project stage: Request ML20204G9481984-11-0202 November 1984 Forwards Response to NRC 841031 Request for Addl Info Re 840706 Request for Extension to Schedular Requirements of 10CFR50.49(g) for Certain Electrical Equipment Due to Test Complications & Procurement Lead Times Project stage: Request ML20099C4741984-11-12012 November 1984 Forwards Revised Reponse to Item 3 in 841102 Submittal of Addl Info Re Percentage of Contract Workers Accumulating Significant Overtime Hours During Unit 2 Equipment Qualification Program Project stage: Other ML20099C1481985-03-0404 March 1985 Forwards Response to Generic Ltr 84-24 Re Certification of Requirements of 10CFR50.49.Environ Qualification Plan Implemented.Equipment Either Fully Qualified or Justification for Continued Safe Operation Submitted Project stage: Other ML20100N1401985-04-0404 April 1985 Confirms That Surface Exam of Two Feedwater Nozzles Scheduled During Upcoming Maint/Refueling Outage,Per NUREG-0619.Justification for Reducing Number of Feedwater Nozzles Based on Sparger Configuration Project stage: Request ML20127P6851985-05-10010 May 1985 Responds to NRC 850404 Request for Addl Info Re Small Break LOCA Drywell Temp Profiles Used for Environ Qualification of Electrical Equipment.Curves & Rept Describing Methodology Used in Generating Curves,Transmitted w/ Project stage: Request 1983-05-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
_ _ -
ed o
g-
.b os c
ADMINISTRATIVE CONTROL RECORD' RETENTION (Continuedl Records of radiation exposure for all individuals entering c.
radiation control areas.
d.
Records of gaseous and liquid radioactive material released to the environs, e.
Records of transient or operational cycles for those unit components identified in Table 5.7.1-1.*
f.
Records of reactor tests and experiments.
g.
Records of training and qualification for currant members of
~
the unit staff.
h.
Records of in-service inspections performed pursuant to these 1
Technical Specifications.
i.
Records of Quality Assurance activities required by the QA Manual.
j.
Records of reviews performed for chang'es made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.
k.
Records of meetings of the PRB and the SRB.
1.
Records for Environmental Qualification which are covered under the g provisions of paragraph 6.15.
6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be apprerted, maintained and adhered to for all operations involving personnel radiation exposure.
6.12 HIGH RADIATION AREA 6.12.1 In lieu of the " control device" or " alarm signal" required by paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area in which the intensity of radiation is greater than 100 mre/hr But less than 1000 l
mrem /hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Pennit*. Any individual or group of individuals pemitted "neal.n Fnysics persennel, or personnel escorted by Health Physics person-tiel in accordance with approved emergency procedures, shall be exmpt from j
the RWP issuance requirement during the perfomance of their assigned radia-tion protection duties, provided they comply with approved radiation pro-tection procedures for entry into high radiation areas.
HATCH - UNIT 1 20 Anendment No k0rder dtd.
October 24, i980 gg4 W
ADMINISTRATIVE CONTROL 6.15 ENVIRONMENTAL QUALIFICATION 6.15.1 By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of Division of Operating Reactors " Guidelines for Evalua. ting Environmental Qualification of Class IE Electrical Equipment in Operating Reactors"{ DOR Guidelinesh or, NUREG-0588 " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment".
December 1979. Copies of these documents are attached to Order for Modi-fication of Licenses DPR-57 and NPF-5 dated October 24, 1980.
6.15.2 By no later than December 1,1980, complete and auditible records must be available and maintained at a central location which describe the environnental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the D0R Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.
Order dated
~
HATCH - UNIT 1 6-22 October 24,1980 L
~
qlL
'{t ADMINISTRATIVE' CONTROL l
ECORD RETEN' ION (Continued)
T R
Records of radiation exposure for all individuals entering c.
radiation control areas.
Records of gaseous and liquid radioactive material released to d.
the environs.
Records of transient or operational cycles for those unit e.
components identified in Table 5.7.1-1.
f.
Records of reactor tests and experiments.
Records of training and qualification for current members of g.
the unit staff.
Records of in-service inspections performed pursuant to these h.
Technical Specifications.
Records of Quality Assurance activities required by the QA i.
Manual.
Records of reviews performed for changes made to procedures or J.
equipment or reviews of tests and experiments r-rsuant to 10 CFR 50.59.
k.
Records of meetings of the PRB and the SRB.
Records for Enviroamental Qualification which are covered under the 1.
provisions of paragraph 6.15.
6.11 RADIATION PROTECTION PROGRAM _
Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
6.12 HIGH RADIATION AREA In lieu of the " control device" or " alarm signal" required by 6.12.1 paragraph 20.203(c)(2) of 10 CFR 20, each high rsdiation a mrem /hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit *, Any individual or group of individuals permitted
- Healtn Fnysics personnel, or personnel escorted by Health Physics person-nel in accordance with approved emergency procedures, shall be exempt from the RWP issuance requirement during the' performance of their assigned radia-tion protection duties, provided they comply with approved radiation pro-tection procedures for entry into high radiation areas.
i
. HATCH - UNIT 2 6-18 Order dtd. October 24,1980
~
f ADMINISTRATIVE CONTROL 6.15 ENVIRONMENTAL QUALIFICATION 6.15.1 By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of Division of Operating Reactors " Guidelines for Evalua. ting Environmental Qualification of Class IE Electrical Equipment in Operating Reactors"(DOR Guidelinesh or, NUREG-0588 " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment",
December 1979. Copies of these documents are attached to Order for Modi-fication of Licenses DPR-57 and MPF-5 dated October 24, 1980.
6.15.2 By no later than December 1,1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with
~
the DOR Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.
l Order dated
~
RATCH - UNIT 2 6-21 October 24,1980 1
--.