Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20040D129
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/11/1981
From: Crane C
FRANKLIN INSTITUTE
To:
NRC
Shared Package
ML20040D127 List:
References
RTR-NUREG-0737, RTR-NUREG-737 RFI-C5257-475, TAC-42505, TAC-42506, NUDOCS 8201300273
Download: ML20040D129 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ)

REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EOUIPMENT Georgie Power Company E.I. Hatch Unit 2 NRC Docket No. 50-366 December 11, 1981 NRC TAC No. 42506

. sg

00. Franklin Research Center A Division of The Franklin Institute The Banjernan Frankan Parkwey, PNia.. Pa 19103 (215) 44e-1000 8201300273 020107 PDR ADOCK 05000321 p PDR

RFI-C5257-475 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commiesion (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment.' The results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (RFI) is the result of an evaluation of the information provided by letters dated September 14, 1981

[1] , February 1, 1981 [2], and March 5, 1981 [3].* FRC previously requested TMI Action Plan information by telephone memoranda dated July 27, 1981 and September 14, 1981 [4,5].

In response to the request for Reference 4, Georgia Power Company transmitted the following information [6]:

1. Southwest Research Institute letters to Hays Republic Div. Milton Roy Company, dated 29 May 1980, 19 November 1979, 21 February 1980, and 26 February 1980, concerning SwRI Project No. 11-5453-013,

" Irradiation of Instrumentation."

A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER Information Requested Date Received by FRC**

1. In reference to the Licensee's 90-day response [1] to the NRC SER [7], a legible single copy of each of the following qualification. documents is requested in order that the FRC evaluation may proceed;
a. Mechanical Calculation 296, Rev. 0
  • Numbers in brackets refer to citations found in the list of references.
    • This column will be completed by FRC as the requested information is received.

nklin Research Center' A Duwan of The FransJn heesule n

e <

.

  • I RFI-C5257-475 Date Received by FRC**
b. General Electric Information Document 22A5230
c. Westinghouse Order No. (Test) AT-18008-Y1
d. Target Rock Corp. Test Report 1559, December 13, 1976
e. Static-O-Ring Report No. 7924-101, May 22, 1979
f. Control System Calculation 30
g. HNP-2 Electrical Calculation No. 27
h. Terminal Block LOCA test by General 4 Electric Company, November 6,1973
1. Wyle Laboratories Report No. 44354-1
j. Hatch Unit 2, Electrical Calculation No.

25

k. Okonite Company Engineering Report No.

N-l***

1. AMP Engineering Test Report GPR575-98
m. AMP Engineering Test Report EER-35
n. Hatch Unit 2, Electrical Calculation No.

23

o. Hatch Unit 2, Electrical Calculation No.

24

p. Estimation of Qualified Life of EA180 Series Nuclear Switch, Rev. 3, February j 27, 1980
q. Estimation of Qualified Life of EA740 Series Nuclear Switch, Rev. 3, February 27, 1980
r. ENP-2 Electrical Calculation No. 28
s. NEQ Test Report No. 43703-1, Wyle Job No.

43703

      • Document previously requested in Reference 5 but not received by FRC.

0007ranklin Research Center -

A Dmmen of The Franken innumme I - . .

RFI-C5257-475

, Date Received by FRC**

t. HNP-2 Electrical Calcula'tion No. 29, Rev. O
u. NNP-2 Electrical Calculstion No. 26 ,
v. Hatch Unit 2, Electrical Calculation No. 22
w. Okonite Company Engineering Report No G-3 * * *
x. Hatch Unit 2, Electrical Calculation No. 21 y..Rosemount Report 108025
z. Hatch Unit 2, Electrical Calculation No. 20 aa. Samuel Moore Letter, March 25, 1980 bb. GE Letter G-CPC-0-249, October 23, 1980
  • cc. GE VPF 2793-54-3 dd. GE VPP 3379-243-1 ee. GE Qualification Report HNP Unit 2 Core Spray and RHR Motors No. NSE-17-04-81 Rev. 1 f f. GE Qualification Report No. NSE-17-0481-1 gg. GE Letter G-GPC-1-202, dated September 2, 1981

( hh. Rosemount Report No. 127227

11. Rosemount Report 97215A l

l l'

l

. nkun

- ~Research

. - Center

L RFI-C52S7-475 REFERENCES

1. J. T. Beckham, JL .

Letter to J. P. O'Reilly, NRC.

Subject:

Environmental Qualification of Safety-Related Equipment F.evision 3 - Response to SRF for Edwin I. Hatch Nuclect Plant Georgia Power Co., 14-Sep-81

2. W. A. Widner Letter to J. P. O'Reilly, NRC. Subj ect: Response to IE Bulletin 79-OlB Supplement 3.

Georgia Power Co. , 01-Feb-81

3. W. A. Widner Letter to J. P. O'Reilly, NRC. Subjects Georgia Power Company's Update of its IE Bulletin 79-OlB Response dated February 17, 1981.

(Attached)

Georgio Power Co. , 05-Mar-81

4. Telephone Memorandum J. A. Murphy (PRC) with R. Baker (Georgia Power Co.)

(

Subject:

Request for Information for Hatch Units 1 and 2 July 27, 1981

5. Telephone Memorandum K. Iepson and D. Schmitz (FRC) with R. BaYer (Georgia Power Co.)

Subject:

Pequest for Information for Hatch Units 1 and 2.

September 14, 1981

6. Draf t letter to FRC, transmitting documentation references and cold shutdown information. (Information requested via telecon, 7/27/81.)

Letter received 8/14/81.

Georgia Power Co. , 00-Aug-81

7. Office of Nuclear Reactor Regulation Safety Evaluation Report for Hatch Unit 2 Environmental Qualification of Safety-Related Electrical Equipment NRC,16 Jun-81
8. NUREG-0737, " Clarification of TMI Action Plan Requirements" NRC, November 1980 000 nklin Research Center A OMuon af The Fransen enesue a