Category:CONTRACTED REPORT - RTA
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:QUICK LOOK
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] |