Responds to NRC 810127 Ltr Re Action Taken to Determine Conditions of Mechanical Snubbers,Per IE Bulletin 81-01.All Accessible & Inaccessible Mechanical Snubbers on safety- Related Svc Replaced W/Snubbers of Different Design
ML20054C301
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/07/1982
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 A01531, A1531, IEB-81-01, IEB-81-1, TAC-08952, TAC-8952, NUDOCS 8204200326
Download: ML20054C301 (7)


Text

. . a.

MMEA'FI' IFI'II.I'I'II"*J *"*'"'"''***'d*"5"**'**"i"""*'"'"'

3 ZZ./,O'7. "OT~ Nn ro*n![, CONNECTICUT 06101

=:==: -

n=> eea9" g ,; .3 April 7, 1982 DOCKET NO. 50-336 A01531 Mr. Ronald C. Haynes Regional Administrator, Region I /-

f Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

[ gf , p 4 Lj pg3' 631 Park Avenue \_i 3, 'f -

King of Prussia, PA 19406 I g

\< , - ,

Q,f ,' @

References:

(1) B. H. Grier letter to WQG'.?Cqtmsi ' dated January 27, 1981, transmil;t'$ngJ ' Bulletin No. 81-01.

(2) W. G. Counsil letter to B. II. Grier, dated June 23, 1981.

Gentlemen:

MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 MECHANICAL SNUBBERS In Reference (1), the NRC Staff requested that Northeast Nuclear Energy Company (NNECO) perform certain actions to determine the condition of mechanical snubbers, specifically those manufactured by International Nuclear Safeguards Corporation (INC), at Millstone Unit No. 2.

Reference (2) provided the Staff with a compendium of the correspondence regarding the actions taken by NNECO in response to Reference (1). This included the inspection of all inaccessible INC mechanical snubbers on safety related systems auf the replacement of inoperable units. At that time NNECO reaf firmed its commitment to replace all accessible INC mechanical snubbers with snubbers of a different design prior to the Cycle 5 refueling outage. NNECO had also committed to replace all remaining inaccessible INC mechanical snubbers during the Cycle 5 re-fueling outage.

In fulfillment of those commitaents, NNECO hereby informs the Staff that all accessible and inaccessible INC mechanical snubbers on safety rela-ted systems at Millstone Unit No. 2 have been replaced with snubbers of a different design. The following information is provided to the Staff in fulfillment of Item 4 of Reference (1).

8204200326 820407 PDR ADOCK 05000336 G PDR ps.M

s -

A total of 81 INC mechanical snubbers were replaced with snubbers of a different design since the May, 1981 outage. Table 1 provides a listing of the mechanical snubbers replaced prior to the Cycle 5 refueling out-age and Tabic 2 provides a listing of those snubbers replaced during the refueling outage. Information included in both Tables includes model number, size, number of failures, snubber location, mode of failure and cause of failure.

In all cases, the INC mechanical snubber was replaced with a snubber of a different design.

All INC snubbers were visually examined. With the exception of one, all those snubbers listed in Tables 1 and 2 were stroke tested over the full range of tension and compression. Snubber No. DP537 located on Hanger number FSK-M-15-029 in the high pressure safety injection system was lost prior to stroke testing. This snubber was assumed to be frozen for the purposes of system operability evaluations. Of the remaining 80 INC snubbers which were stroke tested, four failures were identified.

Of the five failures identified or assumed, NNECO performed stress analyses and fatigue evaluations, where appropriate, for two cases. In the remaing cases, it was determined that detailed stress analyses were not required since the nature of the snubber failures was such that additional thermai stresses in the affected systems had not been in-duced.

The first case analyzed involved hanger number 408005 on the pressurizer safety and relief system. The stresses were determined to be below Code allowable values and the increase in usage factor was insignificant.

The second case analyzed involved hanger number 416032 on the containment spray system. In this case, the stresses were also found to be well below code allowable values.

In all cases where inoperable snubbers were identified or assumed, NNECO has concluded that the integrity of the piping system has not been compromised and that continued safe operation of the affected system is assured.

During the Cycle 5 refueling outage, NNECO identified one additional INC mechanical snubber which had not previously been included in the list of mechanical snubbers under the Reference (1) review. This snubber was incorrectly identified as a rigid restraint in the input listing to a stress analysis problem. The snubber is correctly depicted on the piping system isometric. The snubber was stroke tested satisfactorily and replaced with a mechanical snubber of a different design. NNECO has concluded that this anomaly is an isolated occurrence.

NNECO also performed visual examinations and stroke tests on all me-chanical snubbers manufactured by vendors other than INC which were installed prior to the issuance of Reference (1). This action was performed in accordance with Item 3 of Reference (1). The results of these tests are provided in Table 3. No failures of either the stroke test or visual examination were identified.

w * . .

The docketing of this information completes NNECO's response to Refer-ence (1). All commitments regarding the replacement of INC mechanical-l snubbers at Millstone Unit No. 2 have been fulfilled. No further action is planned in this matter.

1 To assist the NRC Staff in evaluating the value/ impact of this Eulletin, NNECO has determined that approximately $740,000.00 has been expended in i response to Reference (1) to date. This figure includes the preparation

)'

and review of reports required by the Bulletin as well as repair / replace-ment program costs. In addition, it is noted that approximately

$12,000,000.00 in replacement power costs were incurred during the l May 1981 outage for snubber testing and replacement.

We trust you find this information responsive to the Reference (1) 4 requests.

I Very truly yours, NORTEAST NUCLEAR ENERGY COMPANY

~

. Ah '

W.'G. Counsli ~

! Senior Vice President l

b -

1 1

i i

t I

1 t

TABLE 1 MILLSTONE NUCLEAR POWER STATION UNIT NO. 2 INC MECHANICAL SNUBBER REPLACEMENT ACCESSIBLE AREAS NUMBER NUMBER FAILURE CAUSE OF SYSTEM MODEL TESTED FAILED MODE FAILURE LPSI MSVA-2 3 0 - -

IIPSI MSVA-2 4 0 - -

MSVA-3 1 0 - -

SERVICE MSVA-2 2 0 - -

WATER MSVA-3 3 0 - -

RBCCW MSVA-1 2 0 - -

MSVA-2 1 0 - -

MSVA-3 1 0 - -

CONTAINMENT MSVA-1 1 0 - -

SPRAY SIIUTDOWN MSVA-2 2 0 - -

COOLING TOTAL 20 0 MSVA-1 750 LBS.

MSVA-2 3,000 LBS.

MSVA-3 10,000 LBS.

TABLE 2 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 INC MECilANICAL SNUBBER REPLACEMENT INACCESSIBLE AREAS NUMBER NUMBER FAILURE CAUSE OF SYSTEM MODEL TESTED FAILED MODE FAILURE IIPSI MSVA-1 4 1 SNUBBER LOST ASSUMED FAILED SAFETY MSVA-2 1 0 - -

INJCETION CONTAINMENT MSVA-1 2 1 INTERMITTENT WOULD NOT STROKE SPRAY JAMMING TifROUGli FULL RANGE MSVA-2 2 1 FROZEN CORROSION MAIN MSVA-1 11 0 - -

STEAM MSVA-2 1 0 - -

CVCS MSVA-1 2 1 INTERMITTENT WOULD NOT STROKE JAMMING Ti!ROUGli FULL RANGE MSVA-2 1 0 - -

PRESSURIZER MSVA-1 2 0 - -

SAFETY AND MSVA-2 27 1 FR0 ZEN CORROSION RELIEF MSVA-3 7 0 - -

MSVA-4 1 0 - -

TOTAL 61 5 MSVA-1 750 LBS.

MSVA-2 3,000 LBS.

MSVA-3 10,000 LBS.

MSVA-4 20,000 LBS.

s TABLE 3 MILLSTONE NUCLEAR' POWER STATION UNIT NO. 2 PSA MECHANICAL SNUBBER TESTS 1981/1982 REFUELING OUTAGE NUMBER NUMBER MODEL NO. CAPACITY TESTED FAILED PSA- k 350 LBS. 5 0 PSA-10 15,000 LBS. _6 0 TOTAL 11 7

) ss. Berlin April 7, 1982 COUI4TY OF llARTFORD )

Then personally appeared before me W. G. Counsil, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

Notary Public My Commission Expires March 31, 1983 i