ML20052B447

From kanterella
Jump to navigation Jump to search
Forwards LER 82-008/03L-0
ML20052B447
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/23/1982
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20052B448 List:
References
NUDOCS 8204300431
Download: ML20052B447 (1)


Text

r-v

. 1 Wisconsin Electnc ma comr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 April 23, 1982 Mr. J. G. Keppler, Regional Administrator g Office of Inspection and Enforcement, A p

Region III g U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road RECEIVED Glen Ellyn, Illinois 60137 Q -

Ej n a,AppggI982x ~J

Dear Mr. Keppler:

, , g_

  • re DOCKET NO. 50-266 LICENSEE EVENT REPORT NO. 82-008/03L-0 POINT BEACH NUCLEAR PLANT, UNIT 1 k u 0

Enclosed is Licensee Event Report No. 82-008/03L-0 (a 30-day report) with an attachment which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.B.3, " Observed inadequacies in the implementation of administrative or procedural controls which threaten to cause reduction of degree of redundancy provided in reactor protection systems or engineered safety feature systems".

Very truly yours,

\

h

^

r

(

Executive Vice President Sol Burstein Enclosure Copy to NRC Resident Inspector 040009/, gpa26 2 f,f g