ML20050E864

From kanterella
Jump to navigation Jump to search
Clarifies Statement in Util 801215 Ltr Re Inclusion of Simulator Exams for Operator Requalification,Per NUREG-0737, Item I.A.3.1.Description of Initial Operator Training Program Can Be Found in Training Manual
ML20050E864
Person / Time
Site: Pilgrim
Issue date: 04/07/1982
From: Deacon W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.3.1, TASK-TM 82-100, NUDOCS 8204130337
Download: ML20050E864 (1)


Text

J l

BOSTON EDISON COMPANY son Scyteron Semes, BOSTON. MAssACMusETTs 02199

, eIw a - April 7, 1982 e gggpjg) ,

BECo. Ltr. #82-100

-8 2 APR131982C F g es;;;y,aemon -

fir. Domenic B. .Vassallo, Chief Operating Reactors Branch #2 s

25(7" Division of Licensing /

Office of Nuclear Reactor Regulation & d' U.S. Nuclear Regulatory Commission Washington, D. C. 20555 License No. DPR-35 Docket No. 50-293 Clarification to Operator Training per Item 1. A.3.1 NUREG 0737

Dear Sir:

In BEco Letter #80-310 dated December 15, 1980, we stated that simulator examinations have been included for operator requalification. This state-ment was questioned by one of your Staff reviewers and clarified in a telephone discussion between flessrs. Eccleston, Wiggington (HRC) and Messrs.

Keyes, Olson (BECo) as follows:

Simulator exams are required for initial Licensing only. Simul ator training is required for requalification.

In addition, a description of our initial operator training and requalifications.

programs as requested by fir. Niggington can be found in Sections 3.1.1 and 3.1.2 of the Pilgrim Nuclear Power Station Training fianual, a copy of which is on file in the offices of tir. D. Beckham (0.L.B.)

Should you require any additional information on this subject, clease do not hesitate to contact us.

Very truly y urs,

/'< . H . h eacon Acting Manager Nuclear Operations Sunport 0

fo4 8204130337 820407 E PDR ADOCK 05000293 I V PDR