Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18151A6301999-09-0101 September 1999 Submits Summary of 990812-13 Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Examination Stds,New Insp Programs & Other Training Issues.List of Attendees Encl ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML18152B3701999-08-30030 August 1999 Informs That Virginia Electric & Power Co Hereby Granted Approval to Submit Original & One Paper Copy & 6 CD-ROM Copies of Updates to FSAR as Listed,In Response to ,Requesting Exception to 10CFR50.4(b)(6) ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3811999-08-23023 August 1999 Forwards Safety Evaluation,Granting Relief Request IWL-3 Re ISI Programs,Per Util ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B3731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at North Anna & Surry. Requests Info Re Individuals Taking Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B3951999-06-30030 June 1999 Informs That Effective 990706,GE Edison Has Been Assigned as Project Manager,Project Directorate II-1,for North Anna Power Station.Edison Will Continue in Assignment as Project Manager for Surry Power Station ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML20207C9851999-05-28028 May 1999 Requests Regrading of RT Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of RT Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206H0221999-05-0303 May 1999 Informs That Licensee Changes Bases for TS 3/4.6.1.2, Containment Leakage. Changes Allow Use of Other NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing.Ts Bases Page,Encl ML20206G9481999-05-0303 May 1999 Informs NRC That Insp of 58 Accessible safety-related Pipe Supports Completed in Response to NOV from Insp Rept 50-338/98-05 & 50-339/98-05.Commitments Made Include Plans to Perform Assessment of Welding & Welding Insp ML20205T1181999-04-16016 April 1999 Requests NRC Approval Prior to Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit.Nrc Concurrence with Irradiation Program Requested by End of June 1999 ML20205P1891999-04-0808 April 1999 Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included ML20205K3631999-04-0505 April 1999 Requests That Relief Request IWE-3 Be Removed from 980804 Relief Requests Submitted to Nrc.Subject Relief Request Was Inadvertently Retained in Attachment 1 for Unit 1 ML20205K2191999-04-0101 April 1999 Forwards Response to NRC 990106 RAI Re Util Summary Rept on USI A-46 Program,Submitted 970527.Calculations & Corrected Table 11.1-1,encl ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML20205E2701999-02-25025 February 1999 Forwards Rept on Status of Decommissioning Funding for North Anna Power Station,Units 1 & 2.Trust Agreement Between Old Dominion & Bankers Trust Co,Effective 990301,attached ML20207A8741999-02-25025 February 1999 Draft Response to NRC Telcon Re Licensee Request for Approval of LBB Evaluation in Support of Elimination of Augmented Insp Program on RCS Loop Bypass Lines.Response Justifies Use of Less than One Gpm Detectable Leakage Rate ML18152B5401999-02-11011 February 1999 Requests Relief from Specific Requirements of Subsection Iwl of 1992 Edition with 1992 Addenda of ASME Section Xi,Per 10CFR50.55a(a)(3) ML20203C8181999-02-0505 February 1999 Forwards Response to NRC 981217 Telcon RAI Re risk-basis of Nitrogen Accumulator Action Statement to Complete NRC Review of 951025 Proposed TS Changes 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML20043D1661990-05-30030 May 1990 Requests Withdrawal of 860321 Request for NRC Review & Approval of Engineering Evaluations 7 & 8 Re App R Fire Protection Features at Plant,Based on Establishing 60-minute Interval Prior to Requiring Reentry Into Fire Area ML20042H0571990-05-11011 May 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04.Corrective Actions:Leak Test Procedures Will Be Reviewed & Revised to Specify Appropriate Test Boundaries & O-ring Obtained ML20042G2081990-05-0808 May 1990 Forwards List of Issues Requiring NRC Review & Approval to Support Upcoming Plant Refueling Outages.Issues Include Tech Spec Change Request to Increase Fuel Enrichment to 4.3% & Use of Improved Westinghouse Fuel Assembly Design ML18153C1971990-04-24024 April 1990 Responds to Unresolved Items Noted in Insp Repts 50-338/89-12,50-339/89-12,50-280/88-19 & 50-281/88-19 Re Secondary Sys Containment Leakage & Concludes Leakage Need Not Be Quantified & Not Included in as-found Leakage ML20034B9431990-04-24024 April 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/89-35 & 50-339/89-35.Corrective Action:Escape Hatch Inner Door Operator Closed to Ensure Containment Integrity & Outer Door Opened,Inspected & Sealing Surface Cleaned ML20034B9461990-04-24024 April 1990 Forwards Results of H-3 Spiked Sample Analysis Completed on 900321.Analysis Performed W/Liquid Scintillation Counter ML20033G7391990-04-0202 April 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-02 & 50-339/90-02.Corrective Actions:Test Procedures Developed to Include Testing of Svc Water Supply Check Valves to Charging Pump Lube Oil Coolers ML18151A2551990-03-30030 March 1990 Forwards Rev to, Corporate Emergency Response Plan & Rev to, Corporate Plan Implementing Procedures ML18153C1671990-03-30030 March 1990 Submits Supplemental Response to 10CFR50.63, Loss of All AC Power. Understands That Load Mgt Schemes for Both Blackout & Nonblackout Units Allowed by Station Blackout Rule ML20012E5331990-03-29029 March 1990 Requests That Operator License for Listed Individuals Be Cancelled Due to Termination of Employment ML18151A4941990-03-29029 March 1990 Forwards Listed Info Re Licensee Guarantees of Payment of Deferred Premiums,Per 10CFR140.21(e) ML20012D7551990-03-20020 March 1990 Forwards Nonproprietary WCAP-12266 & Proprietary WCAP-12265, North Anna Unit 2 Evaluation for Tube Vibration Induced Fatigue. Deferral of Potential Sentinel Plug Removal Workscope Requested.Proprietary Rept Withheld ML18153C1511990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47. Operability & Surveillance Requirements for Steam Generator Overfill Protection Sys Will Be Incorporated in Tech Spec Change ML20012B8171990-03-0909 March 1990 Advises That Util Plans to Simplify Plant Liquid Radioactive Effluent Sampling Sys to Increase Reliability & Reduce Exposure.Mods Expected to Occur by Apr 1990 ML20012C0091990-03-0808 March 1990 Forwards Topical Rept WCAP-12497, Analysis of Capsule U from VEPCO North Anna Unit 2 Reactor Vessel Radiation Surveillance Program ML20012A0581990-03-0202 March 1990 Advises That Util Intends to Revise Emergency Diesel Generator Bushing Gap Measurement Insp Frequency to Each Refueling Outage in Order to Detect Extruded Bushings & Prevent Generator Failure ML18153C1261990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re NRC Regulatory Impact Survey.Survey Covers Type of Insp,Audit or Evaluation by NRC Resident,Nrc Regional Ofc,Nrc Teams & INPO ML20033E4181990-03-0101 March 1990 Advises of Proposed Change in Steam Generator Tube Rupture (SGTR) Operator Training Commitment,As Result of Unit 1 870715 Sgtr.Revised Commitment Will Increase SGTR Training Per 10CFR50.55.59(c) ML20011F7451990-02-26026 February 1990 Forwards 1989 Annual Steam Generator Inservice Insp Rept,Per Tech Specs 4.4.5.5.b & 6.9.1.4 ML20011F6191990-02-26026 February 1990 Forwards Analysis of Small Steamline Break Performance W/O Low Pressurizer Pressure Safety Injection North Anna Units 1 & 2 & Proposed Amends to Licenses NPF-4 & NPF-7 Re Rupture of Main Steam Pipe Analysis ML20006E5971990-02-19019 February 1990 Forwards Rev 24 to Physical Security Program.Rev Withheld (Ref 10CFR73.21) 1990-09-07
[Table view] |
Text
-
VIHOINIA EtecTwie Axn Powan Cons Awy Ricnwoxo,VinointA uauci April-24,1990 U.S. Nuclear Regulatory Commission Serial No 90 193 Attn: Document Control Desk NAPS /PAK,R2 Washington, D.C. 20555 Docket No. 50 338 2
50 339 License No. NPF-4 NPF-7 4
i Gentlemen:
^
VIRGINIA ELECTillC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 INSPECTION REPORT NOS. 50 338/89-35 AND 50-339/89 35 I
RESPONSE TO THE NOTICES OF VIOLATION We have reviewed your letter of March 30,1990 which referred to the inspection conducted at North Anna on November 18,1989 through January 3,1990 and reported in inspection Report Nos. 50 338/89 35 and 50 339/89 35. Our response to the Notices of Violation are attached.
This event was also discussed in Licensee Event Report 89-019 00 for Unit 1, dated January 19,1990.
We havo no objection to this correspondence being made a matter of public record. -If you have any further questions, please contact us.
Very truly yours, W. L.
tewart Senior Vice President - Nuclear Attachment cc: U. S. Nuclear Regulatory Commission i
101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station 9005010200 900424 O
ADOCK0500{g8 FDR 1
I INSPECTION REPORT NOs. 50 338/89 35 AND 50 339/89 35 RESPONSE TO THE NOTICE OF VIOLATION..
RESPONSE TO THE NOTICES OF VIOLATION REPORTED DURING THE NRC INSPECTION CONDUCTED BETWEEN NOVEMBER 18.1989 AND JANUARY 3.1.9.99 INSPECTION REPORT NOS 50 338/89-35 AND ~ 50-339/89 35 NRC COMMENT During the Nuclear Regulatory Commission (NRC) inspection conducted on November 18,1989 through January 3,1990, violations of NRC requirements were identified. In -
accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, (1989), the violations are listod below:
~
1.
Technical Specification 3.6.1.1. which is applicable with the unit in Modes 1-4,-
requires that, without primary containment integrity, restore containment integrity to the unit within one hour or be in a least hot standby within the next six hours and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Containment integrity exists when each containment air lock is operable pursuant to Technical Specification 3.6.1.3., which requires that both doors for each air lock be closed except when the air lock is being used for normal transit.
Contrary to the above, Unit 1 was operated in Modes 1 and 2 between December 20, 1989 and December 29,1989, without containment integrity on the equipment hatch escape air lock, and the unit was not placed in hot standby or cold. shutdown within-the required time. During this period. In which the equipment hatch escape air lock was not being used for normal transit, the handwheel operating mechanisrn for the escape air lock inner door was not secured'in the fully closed. position.
Consequently, the pressure equalizing valve between the containment and the escape air lock was partially open resulting in the Inner air lock door not being fully -
closed.
This is a Severity Level Ill violation (Supplement 1),
i 1
2.
10 CFR 50.72(b)(1)(ii) requires,in part, that if any event or condition during operation l
l results in the condition of nuclear power plant, including its principal safety barriers, being seriously degraded the licenses shall notify the NRC as soon as practica! and-in all cases within one hour of the occurrence of the event or condition.
10 CFR 50.72(b)(2)(iii)(C) requires that the licensee notify the NRC as soon as practical and in all cases, within four hours of the occurrence of any event or-i condition that could alone have prevented the fulfillment of the safety function of a structure or system needed to control the release of radioactive material.
Contrary to the above, at 10:30 pm on December 28,1989, with the plant in operation, it was discovered that the Unit 1 containment equipment escape air lock, which forms a portion of one of the plant's principal safety barriers, was unable to j
fulfill its safety function due to leakage through both the outer door and inner door's air lock equalizing valve.
NRC was not notified of the event until 10:40 am December 29,1989.
I This is a Severity Level IV violation (Supplement I).
Page 2 of 6
l lNSPECTION REPORT NOs. 50 338/89 35 AND 50-339/89-35 j
RESPONSE TO THE NOTICE OF VIOLATION RESPONSE TO VIOLATION 1 1
i-
- 1. ADMISSION OR DENIAL OF THE ALLEGED VIOLATION The violation is correct as stated.
- 2. REASON FOR THE VIOLATION On December 20,1989, containment integrity was required as a result of Unit 1 entering hot shutdown (Mode 4). At 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on December 28,1989, with Unit 1 at 100 percent power (Mode 1), Health Physics personnel performing weekly survey-rounds discovered 1he containment equ!pment escape air lock outer door drawing in air and notified the Operations Shift Supervisor, Following' discovery of the outer door leakage, actions were initiated to perform Periodic Test (PT) 62.3, " Equipment Hatch Escape Lock Door Seals Testing", to quantify the seal leakage. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> ~on December 29, 1989, Operations personnel preparing.to quantify the outer door leakage noted that the escape hatch _ inner door operator was not in the fully closed position and immediately closed the. door operator, thus respring containment integrity. Investigation could not determine why the escape air lock inner door was not in the fully closed position on December 29,'1989.
At 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> on December 29,1989, the outer door failed to pass PT-62.3 and the Action Statement of Technical Specification 3.6.1.3 was entered for one containment l
escape air lock door inoperable. The O-rings on the outer door were cleaned and' I
satisfactorily tested. The most probable cause of leakage past the escape air lock outer door, based on vendor information, was a build up of dirt and grease on the door's flange surface. The outer door was opened to provide access to the inner:
door. The inner door was successfully tested in accordanco with PT-62.3. The outer door was subsequently reclosed and satisfactorily retested. The Action Statement of Technical Specification 3.6.1.3 was cleared at approximately. 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> on December 29,1989.
Prior to this event, the escape hatch air lock door seals had been verified to be sealed by satisfactory performance of a Periodic Test on December 17,1989. Following the completion of this seal leakage verification, the escape hatch air lock shield blocks and security door were installed. In addition, on December 24,1989, the Security Department performed an alarm test on the security door at the containment equipment escape air lock and did not observe increased noise due to escape air lock leakage.
- 3. CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS' ACHIEVED The escape hatch inner door operator was immediately closed to ensure containment l
L integrity. The outer door was opened, inspected, and the sealing surface cleaned.
Subsequently, both escape lock doors successfully passed their leakage tests.
Page 3 of 6
~
.f 7
INSPECTION REPORT NOs. 50-338/89 35 AND 50 339/89 35 L
RESPONSE TO THE NOTICE OF VIOLATION The Un!t 2 esecpc hatch doors wors checked and'verliied to be fuiiy ciecod.
Tamper indicating seals were installed on the. escape hatch door operators located 1
outside containment and placards were added to the escape hatch doors that-
]
address the need for the Control Room to be notified when the doors are operated.
Appropriate' Periodic' Tests were revised to require the installation of the shield blocks '
and security door prior to performing the seal leakage test, and to require verification that the tamper indicating seals are intact.- If operational requirements preclude installation of the shield blocks and security door prior to the seal leakage test, appropriate administrative controls will be established to ensure that the escape hatch doors are not reopened.
A Root Cause Evaluation (RCE) of the event was also performed. The evaluation
~
identified additional enhancements which are being implemented to preclude-l recurrence of a similar event.
- 4. CORRECTIVE STEPS WHICH WILL BE TAKEN' TO - AVOlD FURTHER I
VIOLATIONS The containment escape hatch doors will be inspected and preventative maintenance performed as necessary during the next refueling outages.
- 5. THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance has been achieved.
5 l
l l
l Page 4 of 6 Y
--n
INSPECTION REPORT NOs. 50 J38/89 35 AND 50-339/89-35 RESPONSE TO THE NOTICE OF VIOLATION _
RESPONSE TO VIOLATION 2-
- 1. ADMISSION OR-DENIAL OF THE ALLEGED VIOLATION The violation is correct as stated except that at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on December 28,1989, the Unit 1 containment equipment escape hatch inner door had not been identified as not being fully closed. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on December _29,1989, the Unit 1 containment equipment escape hatch inner door was discovered as not being fully closed and _was immediately closed, j
- 2. REASON FOR THE VIOLATION Upon receiving notification of the escape hatch leakage at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> the Operations Shift Supervisor discussed the problem with the Superintendent of Operations. A 6
procedure deviation was determined necessary to identify the "as found" leakage of the escape hatch outer door seal. The event was determined to be at least 30 day reportable at this time. Between 2330 and 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> the Station Nuclear Safety and l
Operating Committee (SNSOC) discussed the situation with the-Operations Shift Supervisor and approved the procodure deviation to allow testing.of the outer door seal. The actions underway to measure the outer door leakage for a reportabluty determination were also discussed.
At 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on December 29,1989, System Engineering was requested to review-the documented La leakage and determine the amount of escape hatch leakage that could be allowed to maintain' compliance with the Technical Specifications. This -
l information was to aid in-the reportability determination. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> Operations personnel, attempting to test the outer door seal, discovered the inner door operator not in the fully closed position and immediately closed the door operator, thus.
f-l restoring containment integrity. The Operations Shift Supervisor turnover occurred at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> and prompt reportability was discussed based upon receiving results of the outer door "as found" leakage testing. At 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> the attempt to pressurize the outer door seal to quantify the leakage was unsuccessful. The outer door was subsequently opened, cleaned, and satisfactorily retested by 0315 without obtaining-an "as found" leakage value.
The changing conditions (i.e., inner door not being fully closed with the inability to quantify the outer door "as found" leakage) from what was discussed. earlier with SNSOC was rereviewed by the STA and discussed with management at 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br />.
The NRC Senior Resident inspector was notified by management at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> and informed that the escape hatch outer door was discovered leaking and the inner door was discovered not fully closed. Management reviewed the event at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> and a
determined'a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> report was necessary based upon 10CFR50.72(b)(2)(iii)(D) requirements.
SNSOC re reviewed the event at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> and ~ based on an i
engineering assessment determined a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> report was required under
-j 10CFR50.72(b)(ii).
i i
Page 5 of 6 i
,:p
'l INSPECTION REPORT NOs 50-338/89 35 AND 50 339/89-35 RESPONSE TO THE NOTICE OF VIOLATION -
The initial delay in notifying the NRC was a result of a management decision to quantify the amount of escape hatch outer door leakage to accurately-determine reportability requirements.
- 3. CORRECTIVE STEPS WHICH HAVE BEEN TAKEN - AND THE RESULTS ACHIEVED-Special training _was given to each operating shift to convey the small amount of:
leakage that is equivalent to La. This will assist the operators in assessing future leakage events to determine if the Technical Specification leakage limit has been.
exceeded.
- 4. CORRECTIVE STEPS _WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS l
Station Management will co.1 duct coaching sessions on management expectations _
for reporting under 10 CFR 50.72 and 10 CFR 50.73 during Licensed Operator Requalification Training.
These management expectations.will include both conservatism and timeliness in reaching a decision on the needs for reporting.
Training materials for operations personnel will be_ enhanced to convey.that the small amount of containment leakage that may occur is equivalent to the maximum leakage and the reportability requirements of 10 CFR 50.72 (b)(ii).
i e
- 5. THE DATE WHEN' FULL COMPLIANCE WILL BE ACHIEVED The coaching sessions will be completed by May 25,1990.
The enhanced training materials for operations personnel will be completed by October 30,1990.
t 1
l l
Page 6 of 6 l
.