ML20027C812

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1 Re Initial Classification,Epip 1.3 Re Estimation of Source Term & EPIP 1.4 Re Radiological Dose Evaluation
ML20027C812
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/10/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20027C808 List:
References
NUDOCS 8210270259
Download: ML20027C812 (4)


Text

e 1

Wisconsin Electnc row coupe 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE. WI 53201 September 10, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactor, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of the following revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures:

PROCEDURES

1. EPIP 1.1, " Initial Classification", Revision 3, dated 09-10-82.
2. EPIP 1.3, " Estimation of Source Term", Revision 3, dated 09-10-82.
3. EPIP 1.4, " Radiological Dose Evaluation",. Revision 6, dated 09-10-82.
4. EPIP 1.5, " Protective Action Evaluation", Revision 4, dated 09-10-82.
5. EPIP 1.7, " Evaluation of Core Damage", Revision 1, dated 09-10-82.
6. EPIP 1.8, " Emergency Off-Site Dose Estimations",

Revision 2, dated 09-10-82.

QO 7. EPIP 2.1, " Unusual Event - Immedis;e Actions", Revision 1, dated 09-10-82.

) to A.

k"/ 8210270259 821008 PDR ADOCK 05000266 PDR p

. M -- . 1. ....+...u Mr. H. R. Denton September 10, 1982

8. EPIP 2.3, " Unusual Event - Off-Site Agency Notification",

Revision 2, dated 09-10-82.

9. EPIP 3.1, " Alert - Immediate Actions", Revision 2, dated 09-10-82.
10. EPIP 3.3, " Alert - Off-Site Agency Notification",

Revision 1, dated 09-10-82.

11. EPIP 4.1, " Site Emergency - Immediate Actions",

Revision 2, dated 09-10-82.

12. EPIP 4.3, " Site Emergency - Off-Site Agency Notification",

Revision 1, dated 09-10-82.

13. EPIP 5.1, " General Emergency - Immediate Actions",

Revision 2, dated 09-10-82.

14. EPIP 5.3, " General Emergency - Off-Site Agency Notification",

Revision 1, dated 09-10-82.

15. EPIP 6.5, " Technical Support Center & Operations support Center Activation", Revision 0, dated 09-10-82.
16. EPIP 7.3.2, " Post-Accident Sampling & Analysis of Potentially High Level Reactor Coolant", Revision 4, dated 09-10-82.
17. EPIP 7.3.3, " Post-Accident Sampling of Containment Atmosphere", Revision 4, dated 09-10-82.
18. EPIP 7.4.1, " Routine Check, Maintenance, Calibration &

Inventory Schedule for Health Physics Emergency Plan Equipment", Revision 6, dated 09-10-82.

19. EPIP 7.4.2, " Emergency Plan Equipment Routine Check, Maintenance & Calibration Instructions", Revision 4, dated 09-10-82.
20. EPIP 11.1, "On-Site First Aid Assistance", Revision 3, dated 09-10-82.
21. EPIP 11.3, " Hospital Assistance", Revision 2, dated 09-10-82.
22. EPIP 13.1, " Crisis Communications", Revision 2, dated 09-10-82.
23. EPIP 15.4, " Emergency Preparedness Review", Revision 0, dated 09-10-82.

Mr. H. R. Denton September 10, 1982 FORMS

1. EPIP-04 (09-82), " Status Report on Plant Systems &

Controls for Affected Unit", (attach to EPIP 1.2).

2. EPIP-07 '(09-82) , "For X/Q Determination", (attach to EPIP 1.4).
3. EPIP-08 (0 9-82) , " Estimated Whole Body & Thyroid Projected Doses", (attach to EPIP 1.4).
4. EPIP-09 (09-82), " Estimated Whole Body Dose Calcu-lation Worksheet for Specific Noble Gas Releases",

(attach to EPIP 1.4).

5. EPIP-10 (0 9-82) , " Estimated Ground Deposition Calcu-lation Worksheet for Particulate Radionuclide Releases",

(attach to EPIP 1.4).

6. EPIP-10a (09-82), " Estimated Population Dose",

(attach to EPIP 1.8).

7. EPIP-ll (09-82), " Summary of Radiological Dose Evalu-ation Calculations", (attach to EPIP 1.4) .
8. EPIP-12 (09-82), " Initial Incident Report Form",

(attach to EPIP's 2.3, 3.3, 4.3, 5.3).

9. EPIP-13 (09-82), " Status Update Form", (attach to EPIP's 2.3, 3.3, 4.3, 5.3).
10. EPIP-22 (09-82), " Plant & Company Emergency Call List", (place af ter the Call List tab) .
11. EPIP-23 (09-82), "Off-Site Agency Emergency Call List", (place af ter the Call List tab) .
12. EPIP-24a (09-82), " Site Boundary Control Center Emergency Plan Inventory Checklist", (attach to EPIP 7.4.1).
13. EPIP-24b (09-82), "TSC, ESC, South Gate & OSC Emergency Plan Inventory Checklist", (attach to EPIP 7.4.1).
14. EPIP-24f (09-82), " Emergency Plan First Aid Kit Inventory Checklist", (attach to EPIP 7.4.1) .
15. EPIP-24g (09-82), " Emergency Plan Burn Kit Inventory",

(attach to EPIP 7.4.1) .

Mr. H. R. .Denton September 10, 1982

16. EPIP-24h (09-82) , " Emergency Plan First Aid Room Inventory", (attach to EPIP 7.4.1) .
17. EPIP-24i (09-82), " Emergency Plan Stretcher Inventory",

(attach to EPIP 7.4.1) .

18. EPIP-24j (09-82), " Emergency Trauma Kit Inventory",

(attach to EPIP 7.4.1) .

19. EPIP-25c (09-82), " Quarterly Emergency Plan Checklist",

(attach to EPIP 7.4.2) .

20. EPIP-25d (09-82), " Semiannual & Annual Emergency Plan Checklist", (attach to 7.4.2) .
21. EPIP-33 (09-82), " Estimation of Core Damage", (attach to EPIP 1.7).
22. EPIP-34 (09-8 2) , " Calculation of Xe-133 Equivalent Release Rates", (attach to EPIP 1.8).
23. EPIP-35 (09-82), " Dose Calculations", (attach to EPIP 1.8).
24. EPIP-37 (09-82), " Medical Assistance Call List", (attach to EPIP 11.1) .

MISCELLANEOUS

1. " Table of Contents" dated 09-10-82.
2. " Table of EPIP Forms" dated 09-10-82.

These revisions consist of page changes which should be filed in your copies of the Emergency Plan Implementing Procedures in accordance with the attached instructions. Please return the receipt form for these ten copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, v/

[!v v 7 },

/ '<

Assistant Vice Pre'sident C. W. Fay Enclosures Copies to NRC Resident Inspector (1)

Incident Response Center, Region III (3)

.- - __ _.-. . -- . . - . . _ . . _.__ - . - . - . - - . - - . - . - -