Responds to Generic Ltr 89-19 Re USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. Individual Plant Exam Approach Will Result in Best Safety Solution to Generic Ltr 89-19 & Listed NUREGsML20012D652 |
Person / Time |
---|
Site: |
Arkansas Nuclear ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
03/19/1990 |
---|
From: |
Ewing E ARKANSAS POWER & LIGHT CO. |
---|
To: |
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
---|
References |
---|
REF-GTECI-A-47, REF-GTECI-SY, RTR-NUREG-1217, RTR-NUREG-1218, RTR-NUREG-CR-4386, TASK-A-47, TASK-OR 1CAN039001, 1CAN39001, GL-88-20, GL-89-19, NUDOCS 9003280190 |
Download: ML20012D652 (9) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEAR2CAN099009, Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 9009251990-09-21021 September 1990 Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 900925 0CAN099002, Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP1990-09-14014 September 1990 Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP 0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-14014 September 1990 Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 2CAN099004, Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis1990-09-0707 September 1990 Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis 0CAN099001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised1990-09-0707 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised 1CAN099003, Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 19911990-09-0606 September 1990 Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 1991 0CAN089009, Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg1990-08-31031 August 1990 Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg 0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual1990-08-30030 August 1990 Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual 0CAN089008, Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)1990-08-29029 August 1990 Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d) 0CAN089005, Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 9010011990-08-27027 August 1990 Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 901001 1CAN089011, Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers1990-08-16016 August 1990 Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers 2CAN089009, Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 9010311990-08-13013 August 1990 Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 901031 0CAN089002, Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 11990-08-0808 August 1990 Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 1 05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria1990-08-0202 August 1990 Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria 2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info1990-08-0202 August 1990 Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info ML20081E0891990-07-31031 July 1990 Advises That Since Guidance Contained in Reg Guide 1.97 Not Addressed in Submittals Re Generic Ltr 82-33,further Clarification of Position Re Compliance W/Generic Ltr Appropriate,Per .Ltr Will Be Submitted by 901215 0CAN079014, Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 9009301990-07-31031 July 1990 Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930 0CAN079024, Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures1990-07-31031 July 1990 Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures 0CAN079020, Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)1990-07-31031 July 1990 Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790) 0CAN079018, Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)1990-07-24024 July 1990 Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3) 0CAN079021, Forwards Rev 12 to QA Manual Operations1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations 0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations.W/O Encl 0CAN079011, Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 9002161990-07-20020 July 1990 Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 900216 2CAN079008, Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps1990-07-17017 July 1990 Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance1990-07-17017 July 1990 Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance 2CAN079001, Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip1990-07-0505 July 1990 Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip ML20043H5161990-06-19019 June 1990 Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605 ML20043H3121990-06-18018 June 1990 Forwards Responses to Remaining NRC Questions Re Seismically Qualified,Partially Protected,Condensate Storage Tank (Qcst).Analyses in Calculations Demonstrate That Qcst Tank Foundation & Drilled Piers Adequate W/O Mod ML20043F3321990-06-15015 June 1990 Submits Addl Info on Tech Spec Change Request for Seismic Instrumentation,Per 890809 Request.Licensee Concurs W/Nrc Recommendation Re Editorial Change ML20043G0661990-06-13013 June 1990 Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control Panels ML20043H3471990-06-11011 June 1990 Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043G3801990-06-11011 June 1990 Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043F4341990-06-0707 June 1990 Informs of Receipt of Necessary Approvals to Transfer Operating Responsibilities of Plant to Entergy Operations, Per Amends 128 & 102 to Licenses DPR-51 & NPF-6, Respectively.Extension of Amend Request Unnecessary ML20043E6561990-06-0707 June 1990 Requests That Listed Distribution Be Made on All Future NRC Correspondence.Correspondence to Ns Carns Should Be Addressed to Russellville ML20043E4991990-06-0505 June 1990 Provides Supplemental Response to Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02.Corrective Actions:Listed Program Enhancements Being Implemented to LER Process to Provide Timely Determinations of Condition Rept ML20043E3851990-06-0404 June 1990 Concurs w/900516 Ltr Re Implementation of SPDS Complete for Both Units & Requirements of NUREG-0737,Suppl 1 Met ML20043E3771990-06-0404 June 1990 Forwards Response to Concerns Re Control Room Habitability Survey.Addl Mods Identified Will Enhance Overall Reliability of Control Room Sys & Changes Designed to Increase Performance,Effectiveness & Response of Habitability Sys ML20043C0821990-05-25025 May 1990 Withdraws 900410 Request to Amend Tech Spec Table 3.3-1 Re Applicable Operational Modes for Certain Reactor Protective Instrumentation Operability Requirements ML20043B6531990-05-22022 May 1990 Forwards Rev to Industrial Security Plan to Eliminate Need to Protect Certain Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML20043B7091990-05-21021 May 1990 Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5991990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1 ML20042H0551990-05-0909 May 1990 Forwards Civil Penalty in Amount of $50,000 for Violations Noted in Insp Repts 50-313/86-23 & 50-368/86-24 Re Environ Qualification of Electrical Equipment Important to Safety. Comprehensive Corrective Actions Undertaken ML20043B0841990-05-0909 May 1990 Corrects 900309 Ltr Re Completion of Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Design Change Package Addressing Perimeter & Interior Lighting Scheduled to Be Onsite Late Summer 1991 ML20043A8361990-05-0707 May 1990 Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance Requirements ML20042F4371990-05-0404 May 1990 Requests 90-day Extension to Provide Addl Time for Reviews of Amends 128 & 102 to Licenses DPR-51 & NPF-6,respectively, Re Ownership Transfer ML20042G4771990-05-0404 May 1990 Forwards Summary of Util Exercise Critique Board Evaluation of Radiological Emergency Preparedness Exercise REX-90,per Insp Repts 50-313/90-08 & 50-368/90-08 ML20042F3351990-05-0303 May 1990 Forwards Nonproprietary Suppl 1 to CEN-386-NP & Proprietary Suppl 1 to CEN-386-P, Responses to Questions on C-E Rept CEN-386-P, 'Verification of Acceptability of 1-Pin Burnup Limit....' Proprietary Rept Withheld (Ref 10CFR2.790) ML20042F2701990-04-30030 April 1990 Provides Exam Schedules for Reactor Coolant Pumps a & B in Revised Inservice Insp Program Plan.Insps Scheduled for Refueling Outages 1R10 & 1R12 for Pump a Exams & Refueling Outages 1R10,1R12 & 1R14 for Pump B Exams 1990-09-07
[Table view] |
Text
_ _ _ . . . . . . . . . . . . . . . .. . . . . . . .
..I Arkansas Power & Ught Company Aam e Non,m O m
- I CC" Route 3 (Un 137 G hwnsule Ah /;mol I to 501 W 3100 March 19, 1990 1CAN039001 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Response to Generic Letter 89-1; Gentlemen:
NRC Generic Letter (GL) 89-19, dated September 20, 1989 (OCNA098921), was issued as a result of the technical resolution of Unresolved Safety Issue (USI)
A-47, " Safety Implications of Control Systems in LWR Nuclear Power Plants" GL 89-19 described the NRC staff's concerno regarding steam generator overfill events and the staff's conclusion that all PWR plants should provide automatic steam generator overfill protection, with associated technical specifications for periodically verifying its operability, to mitigate main feedwater overfeed events during normal operation. GL 89-19 required that each licensee provide, pursuant to 10CFR50.54(f), a statement regarding a plan and schedule for implementation of the recommendations in GL 89-19 Enclosure 2, or appropriate justification for not implementing the recommendations. Items (3)(a) and (b),
regarding Babcock and Wilcox (B&W) plants, are applicable to ANO-1. Item (3)(c) is not applicable to ANO-1, as recognized by GL 89-19.
AP&L has reviewed the NRC staff's concerns described in GL 89-19 Enclosure 2, as well as NUREG/CR-4386, NUREG-1217 and NUREG-1218, upon which the GL is based. AP&L is also actively participating in a Babcock & Wilcox Owners' Group (B&WOG) evaluation of the overfill concerns discussed in GL 89-19.
Based upon our concerns for the potential negative safety impact associated with the proposed modification (a loss of feedwater event) and that the safety benefits derived from the Oconee study are not directly applicable to ANO-1, AP&L intends to address the steam generator overfill safety concerns described in GL 89-19 by the Individual Plant Examination (IPE) process for AN0-1, presently scheduled for completion by the end of 1991.
AP&L's proposed IPE program was discussed in our response to GL 88-20, dated November 1, 1989 (0CAN118906). The NRC reviewed and approved AP&L's IPE approach, methodology and schedule as stated in NRC letter dated January 12, 1990 (0CNA019010). AP&L is confident that this approach will provide the necessary technical basis for resolving competing safety con-cerns while effectively using the IPE process to identify optimum solutions.
9003280190 900319 (/O PDR ADOCF OSOOO31:
P FDC 4
y
- U. S. NRC l
! Page 2 03/19/90 l g
! AP&L .has evaluated the generic documents upon which GL 89-19 was based, in order to determine their applicability to the appropriate resolution of steam ;
, generator overfill concerns specific to ANO-1. The recommendations of GL 89-19 '
for B&W plants are based on a probabilistic risk assessmeht (PRA) of the Oconee plants performed by Pacific Northwest Laboratory (PNL) as documented i in NUREG/CR-4386. While generic work of this nature may be considered
- j. sufficient for regulatory decision making, AP&L must evaluate the plant-
- fp specific implications prior to implementation.
-The fundamental issue which must be addressed in evaluating the recommendations of GL 89-19 is how to assemble sufficient plant-specific data and analyses to assure that a proposed overfill protection system's safety benefit is not
, overridden by the increased risk posed by the system. AP&L's responsibility
- under 10CFR50.59 requires, at a minimum, that the following questions be ,
satisfactorily answered: i
- 1. Are the PNL results a valid basis for resolving overfill concerns?
- 2. Is ANO-1 sufficiently similar to Oconee to warrant adoption ef the PNL resulte, as a technical basis for plant-specific changes? .
- 3. What is the negative impact on safety from installation of an overfill ;
protection system? '
- 4. Will the increased t'isk frora system installation exceed the safety benefit?
- 5. Are there alternative procedural, training or hardware fixes that would ;
provide increased sefety Denefit or are more cost-beneficial? ;
AP&L must essentially duplicate the PNL process on a plant-specific basis in order to provide a sufficient technical and regulatory basis for installa-tion of an overfill protection system. This is particularly important for the issues raised in GL 89-19 because the GL and its supporting documents do not address the magnitude of increased risk due to inadvertent operation of the overfill protection system (e.g., leading to a loss of feedwater accident). Coupled with the apparent overstatement of safety benefit from installing such a system, detailed plant-specific reviews must be conducted to assure that plant safety is not degraded. The following discussions provide an overview of AP&L's concerns associated with answering these questions. Based on these concerns, and consideration of the ANO-1 IPE presently in progress, AP&L has determined that the IPE is the optimum vehicle for resolving the issue of steam generator overfill. Each of the questions mentioned above is addressed individually as follows: ,
- 1. Are.the PNL results a valid basis for resolving overfill concerns?
It does not appear that the PNL results are completely applicable for ANO-1.
AP&L recognizes that there are many sources of uncertainty and numerous judgement calls in any PRA effort, which may have little effect on the ultimate
.c .
U. S. NRC l Page 3 l' 03/19/90 outcome of the analysis. For that reason, we have not engaged in a detailed :
review of the assumptions, analyses and calculations associated with :
NUREG/CR-4386. Nonetheless, there are several key assumptions /judgements made by the analysts which appear to be unsupported and incorrect, and which significantly affect the outcome of the analyses. Because such judgement f would not be acceptable in a plant-specific 10CFRSO.59 analysis, the applicability'of the PNL results to ANO-1 is questionable. These assumptions :
fall into three areas: j
- a. The probability of a main steam line break (MSLB) ocurring in an !
unisolable location, ,
l
- b. The likelihood of operator failure to terminate a potential overfill l event, and
- c. The probability of water loading on the main steam line piping l leading to a MSLB. ;
To place these assumptions in context, it is worthwhile to briefly describe ;
the major core damage scenario analyzed by PNL. Note that because of their low contribution to public risk, the Overfill & MSLB, and Transient Shutdown, core ;
damage sequences are not discussed. However, our concerns with the PNL i assumptions are also r.pplicable to those sequences. :
The overfi?1 transient scenarios described for Oconec required failures that initiated a main feedwatt;r (MFW) overfeed, f ailure o# the MFW trip signal, i and f ailat e of the operator to isolate feodwater flow. As the steem generator over fills, water spills inte the main stean line, eventually resulting in a MSLB due to the static enc dynamic water loads on the piping. The steam generator experiences a pressure tr60sient upon blowdown af the secondary side following the postulated MSLB. The pressure differential across the steam generator tubes is then postulated to induce one or more steam generator tube ruptures (SGTR). High pressure injection into the primary system continues to maintain core cooling as long as a water source (reactor building sump or borated water storage tank (BWST_)) is available. If the MSLB location is outside containment but upstream of the main steam isolation valve (MSIV),
sufficient primary water is lost through the ruptured tubes to eventually exhaust the BWST inventory, at which point core damage is assumed to occur.
The public risk due to this scenario as described in NUREG/CR-4386 dominates the total risk associated with the control system failure scenarios. A major contributor to the risk is the assumption that the MSLB occurs with a 50% probability in a location where water would not be collected by the containment building sump for recirculation, which is then always assumed to result in core damage. The break location probability used by PNL is based on the simplified assumptions that a MSLB has an equal probability of occurring upstream or downstream of the MSIVs, and that a MSLB upstream will result in core damage and subsequent offsite release. This latter assumption is invalid for several reasons. The ANO-1 MSIVs are located relatively close to the outside containment wall compared to the length of main steam line piping
s I
r f;
U. S. NRC Page 4 ;
03/19/90 ;
inside containment, as well as the length downstream of the MSIVs. Should a l MSLB occur inside containment, the water lost through the break will be collected at the containment sump for recirculation, assuring an adequate supply for high pressure injection and containment. spray. The maximum ;
potential for core damage therefore cannot exceed the product of 50% and the ratio of the main steam line piping length outside containment up to the a MSIVs, to the total main steam line piping length up to the MSIVs. For f ANO-1, this value is .16, a greater than 60% reduction over the 50% assump- t tion of NUREG/CR-4386. This results in a proportionate reduction in public j risk. ,
Considering only the effects of the MSLB break location probability discussed !
above, the actual estimated risk will be significantly lower. There are other j presently unquantifiable factors affecting the probability of an MSLB occurring in an unisolable location and leading to core damage. For example, the main steam line piping qualification is different for piping upstream of the MSIVs from that piping downstream of the MSIVs. It is intuitive that the difference in piping quality would result in a higher probability of a MSLB d:,wnstream of i the MSIVs (i.e., an is,olable break which would not lead to core damage). -
Further, it is not clear that an unisolable MSLB combined with a SGTR leads ;
to core damage in all cases. The reactor coolant system (RCS) inventory :
lost should be no more then for a SGTR without a MSLB since the MSLB causes significant cooldown and depressurizatinre of the RCS toward shutdown cooling entry conditions muc5 faster than is assumed in SGTR analyses.
Two other critical assumptions of NUREG/CR-4386, regarding the probability L of an operator failing to termintte an overfill scenario, and the probability ;
of an overfill event leading to an MSLB, should also be addressed. The probability of operator failure to terminate the cverfill was estinated at L 0.7 (recognized by PNL as an upper bound estimate of operator error). It i plant-specific PRAs, such overfill scenarios would be assigned an operator failure probability an order of magnitude lower, resulting in en associated t order of magnitude further reduction in public risk. It should be noted that
- NUREC/CR-4386 recognized that the A-47 issue dealt with control systems routinely under operator control, and therefore interaction of the operator with failure diagnosis and recovery is an appropriate consideration, and also recognized that the average failure probability would be lower in plants with simulator programs stressing proper diagnosis of failures. For ANO-1, as well as other B&W plants, MFW overfeed due to control system malfunctions receives special attention in operator training, due to the smaller secondary volume of 1 the B&W once-through steam generator (OTSG), and its associated responsiveness.
The use of a probability of 0.95 for a MSLB given an overfill is also unrealistic. NUREG/CR-4386 recognized that this was a high failure probability do to the uncertainty in this factor, and also recognized that further study could significantly reduce the risk associated with these scenarios. AP&L understands that B&W is presently conducting further study of overfill concerns.
The bases for the recommendations in GL 89-19 are discussed in NUREG-1218, which used the calculations of NUREG/CR-4386 to estimate the safety benefit and value impact of various proposed upgrades. The feedwater control system
V. S. NRC Page 5 03/19/90 at ANO-1 is significantly different from Oconee, and the values for both costs and benefits of the proposed upgrades which were used in the NRC's regulatory analysis do not apply to ANO-1. For example, ANO-1 has made major improvements in the MFW control system, and in the Integrated Control System (ICS) over the past several years, which make the actual probability of a MFW overfeed due to control system failures significantly lower than assumed for Oconee.
A further examination of the factors discussed above should lead to an estimated risk reduction for the applicable control system failure scenarios well below the point at which the NRC's value/ impact guidelines would conclude that hardware changes are a viable option. More significantly, when plant specific factors are taken into account, the actual risk reduction due to an overfill protection system may actually be less than the risk increase due to spurious operation of the system. Based on the above concerns, AP&L believes for ANO-1 that the actual risk due to overfill scenarios is substantially lower than estimated in the basis NUREGs for GL 89-19.
Consequently, a plant-specific evaluation under a program such as the IPE must be conducted to determine the actual risk associated with overfill issues.
It should be noted that NUREG-1218 incorrectly acsumed that all B&W plants other than Oconee either had in place or had committed to modify their designs to include a safety grade overfill protection system. The Emergency Feedwater Initiation and Control (EFIC) system at ANO-1, a safety grade system, was r.riginally designed with the capability for MfW overfill protection. However, due to the concerns discussed above, related to adverse consequences due to spurious operation, questionable cost / benefit (cost estimated in excess of
$1 eillinn dollars), 5nd recent improvements in tN MFW and ICS control systems, AP&l determined that overfill protection implementation was not appropriate The MFW overfill issue was specifically addrer, sed by AP&L as part of the B&WOG Safety & Performance Improvement Program (SPIP).
- 2. Is ANO-1 sufficiently similar to Oconee to warrant adoption of the PNL results as a technical basis for plant-specific changes?
Although ANO-1 and Oconee are similar in many respects, there are signifi-cant plant-specific differences between Oconee and ANO-1 which would alter the PNL results. The PNL study generally recognized that care must be taken in applying the Oconee results to other B&W plants because of these differences. We believe this is particularly important in the case of ANO-1. In addition to differences in hardware reliability, operator response and plant response, fundamental design differences exist between Oconee and ANO-1. For example, Oconee does not have MSIVs and ANO-1 does, the power supply configuration for the ICS at ANO-1 is significantly dif-ferent, and the MFW control system at ANO-1 is significantly different.
This is further justification for allowing the IPE process to determine if overfill scenarios are really risk significant at ANO-1, considering the plant-specific dif f erences f rom PHL's results.
- a. ,
U. S. NRC ,
Page 6 ,
03/19/90 '
- 3. What is the negative impact on safety from installation of an overfill protection system? r Although GL 89-19 and its supporting documents each recommend installation of an overfill protection system which will assure that feedwater is isolated to the steam generators, they do not address the negative impact on safety through ,
implementation of such a system. An overfill protection system can itself :
initiate a loss of feedwater accident, regardless of the safety qualification of the system (GL 89-19 allows implementation of a conemercial grade system).
Spurious actuation of the system during the course of other initiating events may also have adverse safety consequences. Using the same approach as the PNL study, including highly conservative failure assumptions, multiple failures, a high probability of operator failure to restore feedwater, etc., the public risk due to installation of the overfill protection system may be significant. At a .I minimum, it cannot be ignored and must be included in the evaluation of any I proposed modificetions.
- 4. Will the increased risk from system installation exceed the safety benefit?
f As discussed in Items 1 and 2, above, the actual plant-specific public risk due to overfill scenarios may be substantially lower than the risk estimated in the supporting documents for GL 89-19. As discussed in Item 3, the adverse effect on other accident-scenarios of installing an overfill protection system ;
may exceed the overfill risk reduction. Before proceeding with plarst-specific implementation of the recommendations of GL 89-19, AP&L must have a technical basis to resolve this question of competing safety ef fects. The PNL analysis will not represent an adequate basis for plant-specific resolution and there is no specific technical information available on the risk associated with an overfill protection system, although AP&L is aware that the B&W plants >
with some form of overfill protection have had tpurious actuations.
Implementation of an overfill protecticn system will require an evaluation >
pursuant to 100FR50.$9. Sah an ovaluation is likely to find an increase in .
the probability of a loss of all feedwater because of the increased likelihood '
of the initiating event, a loss of main feedwater. The increased probability of a loss of all feedwater may bring this type of accident (not previously i evaluated in the Safety Analysis Report) into the realm of possibility. l
- 5. Are there alternative procedural, training or hardware fixes that would provide increased safety benefit or are more cost-beneficial?
While NUREG/CR-4386 examined several alternatives for reducing risk associated with overfill events, it did not examine all possibilities. There may be other more risk- and cost-beneficial solutions which a plant-specific review would uncover. Another approach to reducing overfill risk involves operator training and/or procedure changes. GL 89-19 cited the potential for signi-ficant reduction in operator error probability through the use of effective training and emergency procedures, as the preferred resolution for the SBLOCA concerns on CE plants. Any significant reduction in operator error probability which would thus lower the estimated core-melt frequency and
t .
L U. S. NRC Page 7 03/19/90
! associated public risk would remove hardware changes as viable options under the NRC's value/ impact criteria. NUREG/CR-4386 did recognize that recom-mendations for USI A-47 might well be integrated with operator training and transient response programs.- As discussed previously, it is AP&L's position that the MFW pump control system improvements, the.ICS improvements and
! enhancements, and existing operator training related to MFW overfeed events
! are preferred to implementation of an overfill protection system at this F time. As mentioned above, this was also the basis for AP&L's determination L not to implement the Main Feedwater Isolation portion of EFIC.
It is AP&L's opinion that the IPE process is particularly well suited for i identification of a range of alternative solutions, should they be neces-sary, with E. built-in process for evaluating and choosing the best solution.-
The IPE process is underway at ANO-1, with a Level I and a limited Level II i PRA being performed. This process involves a search for risk-significant accident sequences coupled with a structured approach to identifying and evaluating a range of possible risk reduction measures. _The IPE therefore
, presents an ideal solution and framework to resolve the overfill issues raised by GL 89-19. Because the basis for the GL is largely PRA-based, PRA techniques should form the core of the plant-specific resolutions. Further-more, a stated sub purpose of the IPE is resolution of USIs/GIs on a plant-specific basis. For these reasons, AP&L has chosen to incorporate the overfill scenarios into its IPE. The concerns of GL 89-19 will be addressed L in AP&L's IPE submittal. AP&L is convinced that this approach will resuit in the best safety solution to GL 89-19 while avoiding unforseen safety concerns which could occur through another, less structured, approach.
Should you have any questions regarding this issue, please don't hesitate to contact me.
Very truly year *,
[
arly . g
~
General Manage Technical Support and Assessment JJF/RBT Attachment
{<
p.
'; ,, s
[ . .. '!
U. S.: NRC -
Page 8 '
03/19/90 _ 1 1
j I
cc: Mr. Robert Martin U. S. Nuclear. Regulatory Commission '
Region'IV I 611 Ryan Plaza Drive, Suite 1000 l
]( Arlington -TX 76011 ;
.E NRC Senior Resident. Inspector {
e '
Arkansas Nuclear One - ANO-1 & 2 -
. Number 1,. Nuclear Plant Road !
Russellville, AR 72801 +
Mr.; Thomas W. Alexion l NRR Project Manager,- Region IV/ANO-1 '!
U. S. Nuclear Regulatory Commission i NRR Mail Stop 13-D-18 {
One White Flint North ~{
11555 Rockville Pike- l Rockville, Maryland 20852 I Mr. Chester Posiusny {
NRRProject. Manager,RegionIV/ANO !
U. S. Nuclear Regulatory Commission - ]
NRR Mail Stop 13-D-18 :
One White Flint North a 11555 Rockville Pike- -
Rockv?lle, Maryland 20852 lj
.c
.. {
'[.'
f f
5 i
~
- m. ---
,g e-
- p. - :e.' . r STATE OF ARKANSAS )
) SS COUNTY Of POPE )
L, P I, Early C. Ewing, being duly sworn, subscribe to and say that I am General Manager, Technical Support and Assessment for Arkansas Power & Light Company; that I have full authority to execute this oath; that I have read the document numbered ICAN839881 and know the contents thereof; and that to the best of my knowledge, information and belief, the statements in it are 4
'true.
_ '/ _ N._
w M N Ea/
rly C. Ewing L SUBSCRIBED 'AND SWORN 10 before me, a Notary Public in and for the County and State above named, this c40 day of f///epel ,
1990.
l /2l Y5 -
Notary Public t
- My Commission Expires:
Y f tf.9j l}