ML20003G632

From kanterella
Jump to navigation Jump to search
Informs That Preservice Exam Requirements Have Been Incorporated in QA Program & Will Be Performed by QC Personnel.Preservice Insp Will Be Verified Completed within Six Months of Preoperational Testing
ML20003G632
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/13/1981
From: John Marshall
TEXAS UTILITIES SERVICES, INC.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
TXX-3301, NUDOCS 8104300313
Download: ML20003G632 (1)


Text

. .-

h&t d _

TEN ,t ' 4TCS SERVICES INC. Log # TXX-3301 2 oui nava.s .ow .a .ortus.rsxas 7 sani File 10010.1 April 13,1981 4 v>

  1. ro 2, 4pg2 1 Mr. Robert L. Tedesco -

Assistant Director S Jgg7A 5 Division of Licensing i.

g%

U. S. Nuclear Regulatory Comission '

Washington, D.C. 20555

( /bp

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION PRESERVICE INSPECTION AND TESTING 0F SNUBBERS

REFERENCE:

NRC 8.ETTER DATED JANUARY 14, 1981

Dear Mr. Tedesco:

The preservice examination requirements listed in the referenced letter are already incorporated as part of the CPSES Quality Assurance Program and will be performed and documented by CPSES Construction Quality Control personnel.

The preoperational testing requirements have been incorporated into chapter 14 of the FSAR. As a prerequisite to the pre-operational testing, the preservice inspection will be verified to have been completed within 6 months of the preoperational testing.

Sincerely, J. S. Marshall BSD:skf cc: H. C. Schmidt D. N. Chapman J. C. Kuykendall J. T. Merritt N. S. Reynolds R. G. Tolson f