[Table View]Forwards Requests for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages to Continue Review. Response Requested within 45 Days of Ltr Receipt Project stage: Other ML19337A6211980-09-22022 September 1980 Tech Spec Change for Item 7 of Table 15.3.5-1 & Item 3a of Table 15.3.5-3 Re Time & Trip Delay Settings for Undervoltage Protection Sys Project stage: Other ML19337A6181980-09-22022 September 1980 Proposed Change 45,modifying 770728 Request to Amend Licenses DPR-24 & DPR-27 to Incorporate Tech Spec Changes. Changes Modify Trip & Time Delay Setting for Undervoltage Protection Circuitry Project stage: Request ML19338E9531980-09-26026 September 1980 Requests Addl 90 Days to Provide Info Re Adequacy of Station Distribution Sys Voltages Per Project stage: Other ML20002E3761981-01-21021 January 1981 Responds to NRC Requesting Addl Info Re Adequacy of Electrical Distribution Sys.All safety-related Sys Supplied from Either 480 Volt or 4160 Volt Sys.Electrical Sys Diagram Encl Project stage: Other ML19345G4961981-03-26026 March 1981 Forwards Request for Addl Info for Review of Util Re Adequacy of Station Electric Distribution Sys Voltages. Requests Response within 60 Days Project stage: RAI ML19350D3341981-03-31031 March 1981 Safety Evaluation Supporting Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML19350D3321981-03-31031 March 1981 Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively, Reflecting Mods to Plant Equipment for Addl Assurance of Proper Functioning of safety-related Electrical & Emergency Power Sys Project stage: Other ML19352A9991981-05-30030 May 1981 Informs That Mod of Protective Relaying Unavoidably Delayed, Due to Longer than Anticipated Delivery Times for Required Replacement Relays for safety-related Electrical Distribution Buses.Anticipates Mod Completion by 810831 Project stage: Other ML20030C8451981-08-20020 August 1981 Advises That Addl Info Requested in NRC Re Adequacy of Station Distribution Sys Voltages Will Be Provided by Dec 1981 Project stage: Other ML20039D6141981-12-30030 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,responding to NRC 811218 Telecopied Request for Addl Info on 811203 Tech Spec Change Request 74 Re Emergency Power Undervoltage Relay Protection Project stage: Request ML20049H8411982-02-26026 February 1982 Informs That Requested Analyses of Effects of Transient Voltages Present During Switching & Motor Starting Operations Will Be Completed by 820501 Project stage: Other ML20052G3531982-05-14014 May 1982 Advises That Addl Info Requested 820226 Re Adequacy of Station Distribution Sys Voltages Will Be Submitted by 820601 Project stage: Other ML20053D8781982-06-0101 June 1982 Forwards Clarification & Updated Info Re Adequacy of Station Electrical Distribution Sys Voltages Referenced in NRC .Info Combined w/810601 & 1230 Ltrs Completes Response Project stage: Other ML20063M5941982-09-10010 September 1982 Responds to 820813 Request for Addl Info Re Adequacy of Electrical Distribution Sys Voltages.Theoretical & Actual Voltages for safety-related Buses Listed Project stage: Request ML20065T5841982-10-29029 October 1982 Responds to NRC Re Adequacy of Station Electrical Distribution.Failure of Both Low Voltage Station Auxiliary Transformers Is Condition Described in Fsar,Chapter 7, Electrical Sys Project stage: Other ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20069E6501983-03-14014 March 1983 Suppls 791012 & 810601 Responses to Requests for Addl Info Re Offsite Power Distribution Sys.Nrc Safety Analysis Concluded That Ac Auxiliary Power Sys Adequate & Physical & Electrical Separation of Power Sys Acceptable Project stage: Other 05000266/LER-1983-003, Forwards LER 83-003/01T-01983-03-22022 March 1983 Forwards LER 83-003/01T-0 Project stage: Other ML20072J6891983-03-23023 March 1983 Application for Amend to Licenses DPR-24 & DPR-27,modifying 820427 Tech Spec Change Request 77 Re Loss of Voltage Protective Relays Project stage: Request ML20204F5251983-04-25025 April 1983 Forwards Safety Evaluation of Util Preferred Ac Power Sys Conformance to GDC 17.Power Sys Do Not Fully Meet Intent of GDC 17 Since Sys Could Be Automatically Disconnected from 4,160-volt Safeguards Buses in Worst Case Accident Loads Project stage: Approval ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate Project stage: Approval ML20085A7491983-06-30030 June 1983 Informs of No Significant Changes to Electrical Distribution Sys Described in FSAR Which Would Affect Degree of Conformance w/GDC-17.Available Info Adequate to Determine Intent of GDC-17 Re Offsite Power Distribution Sys Project stage: Other 1982-10-29 |
ML19337A621 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 09/22/1980 |
From: | WISCONSIN ELECTRIC POWER CO. |
To: | |
Shared Package | |
ML19337A619 | List: |
References | |
TAC-12955, TAC-12956, NUDOCS 8009290342 | |
Download: ML19337A621 (2) | |
Similar Documents at Point Beach | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C0521999-10-0505 October 1999
[Table view]Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20138M5091997-02-13013 February 1997 Proposed Tech Specs Section 15.3.3. Re Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray ML20134L9791997-02-12012 February 1997 Proposed Tech Specs Re Relocation of Turbine Overspeed Protection ML20134A3661997-01-24024 January 1997 Proposed Tech Specs 15.5.4 Re Fuel Storage ML20134A3121997-01-21021 January 1997 Proposed Tech Specs 15.6.11, Radiation Protection Program ML20133N4021997-01-16016 January 1997 Proposed Tech Specs 15.3.2 Re Chemical & Volume Control Sys, 15.3.3 Re Emergency Core Cooling Sys,Auxiliary Cooling Systems,Air Recirculation Fan Coolers & Containment Spray & 15.3.8 Re Refueling ML20133N6321997-01-16016 January 1997 Proposed Tech Specs 15.1-6,15.2.2 Re Safety Limit,Reactor Coolant Sys Pressure,Ts 15.3.1-9,TS 15.3-10,TS 15.3.4-2 & TS 15.3.4-3 ML20133L1071997-01-13013 January 1997 Proposed Tech Specs 15.3.15 Re Overpressure Mitigating Sys & 15.3.1 Re Reactor Coolant Sys ML20133E5531997-01-0606 January 1997 Proposed Tech Specs 15.4.1, Operational Safety Review, Changing Ref Note 20 from TS 15.3.10.B to TS 15.3.10.E to Match TS Section Previously Containing Hot Channel Factor Limit ML20132F3471996-12-19019 December 1996 Proposed Tech Specs Improving Sections TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1, Operational Safety Review ML20132C3741996-12-12012 December 1996 Proposed Tech Specs Section 15.3.3 Re Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers & Containment Spray ML20135A8921996-12-0202 December 1996 Proposed Tech Specs 15.3.14 & 15.4.15 Re Fire Protection Sys ML20135A8431996-12-0202 December 1996 Proposed Tech Specs 15.3.10 Re Control Rod & Power Distribution Limits & 15.4.1 ML20129F2101996-09-30030 September 1996 Proposed Tech Specs Modify TS Section 15.3.3, Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers, & Containment Spray,To Incorporate Allowed Outage Times ML20129C0771996-09-19019 September 1996 Proposed Tech Specs Revising Section 15.3.15, Overpressure Mitigating Sys & Section 15.3.1, Rcs ML20117D2651996-08-22022 August 1996 Proposed Tech Specs Re Licensed Power Level for Plant ML20116N1341996-08-15015 August 1996 Proposed Tech Specs,Consisting of Suppl to Change Request 170,modifying TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1, Operational Safety Review ML20116G4891996-08-0505 August 1996 Proposed Tech Specs Modifying 15.2.3 & 15.5.3 of Change Request 188 & 15.2.1,15.2.3 & 15.3.1.G of Change Request 189 Supporting SEs ML20116D7471996-07-29029 July 1996 Proposed Tech Specs Re Health Physics Manager Qualifications for Plant ML20112F7341996-06-0404 June 1996 Proposed Tech Specs 15.2.3, Limiting Safety Sys Settings & Protective Instrumentation & 15.5.3, Design Features - Reactor ML20117K1991996-06-0404 June 1996 Proposed Tech Specs 15.2.1, Safety Limit,Reactor Core, 15.2.3, Limiting Safety Sys Settings,Protective Instrumentation & 15.3.1.G, Operational Limitations to Maintain Safety Margin for Unit 2 W/Replacement SGs ML20112E2441996-05-29029 May 1996 Proposed Tech Specs 15.1 Re definitions,15.3.6 Re Containment sys,15.4.4 Re Containment Tests & 15.6 Re Administrative Controls ML20108D1531996-04-29029 April 1996 Proposed Tech Specs Re Removal of Fire Protection Requirements ML20108A0011996-04-24024 April 1996 Proposed Tech Specs Section 15.7 RETS Re Removing Items Identified in GLs 89-01 & 95-10 as Being Procedural Details & Relocating Items to Appropriate Documents ML20149D9691996-03-20020 March 1996 Proposed Tech Specs,Providing Corrected Page to Bases for TS 15.3.1 ML20100L3891996-02-27027 February 1996 Proposed Tech Specs,Consisting of Change Request 186, Modifying TS Section 15.4.4, Containment Tests, Spec I.C.1 to State That Type a Tests Shall Be Conducted Per 10CFR50, App J Modified by Approved Exemptions 1999-08-04 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20217C0521999-10-0505 October 1999
[Table view]Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04 |
Text
,
.~.
l o
g l C.
O TABLE 15.3.5-3 10 ENGINEERED SAFETY FEATUPE ACTUATION.iYSTEM INSTRUMENTATION O
1 2
3 4
5 OPERATOR ACTION NO. OF MIN.
MIN.
PERMISSIBLE IF CONDITIONS OF NO. OF OIANNEIS OPERABLE DEGREE OF BYPASS COLUMN 3 OR S NO.
FUNCTIONAL UNIT CIIANNEIS TO TRIP CIIANNEIS REDUNDANCY CONDITIONS CANN(yr DE MET 1.
SAFETY INJECTION a.
Manual 2
1 1
1 Ilot Shutdown * *
- b.
Iligh Containment Pressure 3
2 2
1 Ilot Shutdown ***
c.
Steam Generator Low Steam Primary Pressure is Pressure / Loop 3
2 2
1 Less than 1800 psig Hot Shutdown ***
d.
Pressurizer Low Pressure Primary Pressure is and Low Level 3*
1*
1*
2 Less than 1800 psig Hot Shutdown ***
2.
a.
Manual 2
2 2
Ilot Shutdown ***
b.
Ili-Ili Containment Pressure 2 sets 2 of 3 2 per 1/ set Ilot Shutdown * * *
(Containment Spray) of 3 in each set set 3.
SAFETY REIATED ELECTRICAL BUSTS a.
Degraded Voltage (4.16KV) 3/ Bus 2/ Bus 2/ Bus 1/ Bus I
l t
. _.. _. _ _ _... _= _
TABIE 15.3.5-1 (00NrINUID)
NO.
FUNCTIONAL UNIT OIM2EL SETTING LIMIT 7
Degraded Voltage (4.16KV)
Disconnection of affectal
> 3675 volts 12%
bus from offsite pcwer Time delay: 13.6 sec.15% at 0-95%
of voltage setting 8
Ioss of Voltage a.
4.16 KV Disconnection of affected a.
2450 volts +3%
bus from offsite power Time delay:~0.3 sec.15% at 0 volts start Diesel 1.2 sec.15% at 90% of voltage setting b.
480V Ioad Sinkling b.
256 volts +3%
Time delayT 0.75 sec. +5% at 0 volts 3.5 sec. +5% at 90% of voltage setting i
- \\
1 l
I i
i I
1 I
4 4
-.