TAC:12955
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| |
From | |
MONTHYEARML19344F1861980-09-0808 September 1980
[table view]Forwards Requests for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages to Continue Review. Response Requested within 45 Days of Ltr Receipt ML19337A6211980-09-22022 September 1980 Tech Spec Change for Item 7 of Table 15.3.5-1 & Item 3a of Table 15.3.5-3 Re Time & Trip Delay Settings for Undervoltage Protection Sys ML19337A6181980-09-22022 September 1980 Proposed Change 45,modifying 770728 Request to Amend Licenses DPR-24 & DPR-27 to Incorporate Tech Spec Changes. Changes Modify Trip & Time Delay Setting for Undervoltage Protection Circuitry ML19338E9531980-09-26026 September 1980 Requests Addl 90 Days to Provide Info Re Adequacy of Station Distribution Sys Voltages Per ML20002E3761981-01-21021 January 1981 Responds to NRC Requesting Addl Info Re Adequacy of Electrical Distribution Sys.All safety-related Sys Supplied from Either 480 Volt or 4160 Volt Sys.Electrical Sys Diagram Encl ML19345G4961981-03-26026 March 1981 Forwards Request for Addl Info for Review of Util Re Adequacy of Station Electric Distribution Sys Voltages. Requests Response within 60 Days ML19350D3361981-03-31031 March 1981 Notice of Issuance & Availability of Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively ML19350D3341981-03-31031 March 1981 Safety Evaluation Supporting Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively ML19350D3321981-03-31031 March 1981 Amends 47 & 52 to Licenses DPR-24 & DPR-27,respectively, Reflecting Mods to Plant Equipment for Addl Assurance of Proper Functioning of safety-related Electrical & Emergency Power Sys ML19352A9991981-05-30030 May 1981 Informs That Mod of Protective Relaying Unavoidably Delayed, Due to Longer than Anticipated Delivery Times for Required Replacement Relays for safety-related Electrical Distribution Buses.Anticipates Mod Completion by 810831 ML20030C8451981-08-20020 August 1981 Advises That Addl Info Requested in NRC Re Adequacy of Station Distribution Sys Voltages Will Be Provided by Dec 1981 ML20039D6141981-12-30030 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,responding to NRC 811218 Telecopied Request for Addl Info on 811203 Tech Spec Change Request 74 Re Emergency Power Undervoltage Relay Protection ML20049H8411982-02-26026 February 1982 Informs That Requested Analyses of Effects of Transient Voltages Present During Switching & Motor Starting Operations Will Be Completed by 820501 ML20052G3531982-05-14014 May 1982 Advises That Addl Info Requested 820226 Re Adequacy of Station Distribution Sys Voltages Will Be Submitted by 820601 ML20053D8781982-06-0101 June 1982 Forwards Clarification & Updated Info Re Adequacy of Station Electrical Distribution Sys Voltages Referenced in NRC .Info Combined w/810601 & 1230 Ltrs Completes Response ML20063M5941982-09-10010 September 1982 Responds to 820813 Request for Addl Info Re Adequacy of Electrical Distribution Sys Voltages.Theoretical & Actual Voltages for safety-related Buses Listed ML20065T5841982-10-29029 October 1982 Responds to NRC Re Adequacy of Station Electrical Distribution.Failure of Both Low Voltage Station Auxiliary Transformers Is Condition Described in Fsar,Chapter 7, Electrical Sys ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20069E6501983-03-14014 March 1983 Suppls 791012 & 810601 Responses to Requests for Addl Info Re Offsite Power Distribution Sys.Nrc Safety Analysis Concluded That Ac Auxiliary Power Sys Adequate & Physical & Electrical Separation of Power Sys Acceptable 05000266/LER-1983-003, Forwards LER 83-003/01T-01983-03-22022 March 1983 Forwards LER 83-003/01T-0 ML20072J6891983-03-23023 March 1983 Application for Amend to Licenses DPR-24 & DPR-27,modifying 820427 Tech Spec Change Request 77 Re Loss of Voltage Protective Relays ML20204F5251983-04-25025 April 1983 Forwards Safety Evaluation of Util Preferred Ac Power Sys Conformance to GDC 17.Power Sys Do Not Fully Meet Intent of GDC 17 Since Sys Could Be Automatically Disconnected from 4,160-volt Safeguards Buses in Worst Case Accident Loads ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate ML20085A7491983-06-30030 June 1983 Informs of No Significant Changes to Electrical Distribution Sys Described in FSAR Which Would Affect Degree of Conformance w/GDC-17.Available Info Adequate to Determine Intent of GDC-17 Re Offsite Power Distribution Sys 1982-10-29 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:12955&oldid=3329536"