Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20138M5091997-02-13013 February 1997 Proposed Tech Specs Section 15.3.3. Re Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray ML20134L9791997-02-12012 February 1997 Proposed Tech Specs Re Relocation of Turbine Overspeed Protection ML20134A3661997-01-24024 January 1997 Proposed Tech Specs 15.5.4 Re Fuel Storage ML20134A3121997-01-21021 January 1997 Proposed Tech Specs 15.6.11, Radiation Protection Program ML20133N4021997-01-16016 January 1997 Proposed Tech Specs 15.3.2 Re Chemical & Volume Control Sys, 15.3.3 Re Emergency Core Cooling Sys,Auxiliary Cooling Systems,Air Recirculation Fan Coolers & Containment Spray & 15.3.8 Re Refueling ML20133N6321997-01-16016 January 1997 Proposed Tech Specs 15.1-6,15.2.2 Re Safety Limit,Reactor Coolant Sys Pressure,Ts 15.3.1-9,TS 15.3-10,TS 15.3.4-2 & TS 15.3.4-3 ML20133L1071997-01-13013 January 1997 Proposed Tech Specs 15.3.15 Re Overpressure Mitigating Sys & 15.3.1 Re Reactor Coolant Sys ML20133E5531997-01-0606 January 1997 Proposed Tech Specs 15.4.1, Operational Safety Review, Changing Ref Note 20 from TS 15.3.10.B to TS 15.3.10.E to Match TS Section Previously Containing Hot Channel Factor Limit ML20132F3471996-12-19019 December 1996 Proposed Tech Specs Improving Sections TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1, Operational Safety Review ML20132C3741996-12-12012 December 1996 Proposed Tech Specs Section 15.3.3 Re Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers & Containment Spray ML20135A8921996-12-0202 December 1996 Proposed Tech Specs 15.3.14 & 15.4.15 Re Fire Protection Sys ML20135A8431996-12-0202 December 1996 Proposed Tech Specs 15.3.10 Re Control Rod & Power Distribution Limits & 15.4.1 ML20129F2101996-09-30030 September 1996 Proposed Tech Specs Modify TS Section 15.3.3, Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers, & Containment Spray,To Incorporate Allowed Outage Times ML20129C0771996-09-19019 September 1996 Proposed Tech Specs Revising Section 15.3.15, Overpressure Mitigating Sys & Section 15.3.1, Rcs ML20117D2651996-08-22022 August 1996 Proposed Tech Specs Re Licensed Power Level for Plant ML20116N1341996-08-15015 August 1996 Proposed Tech Specs,Consisting of Suppl to Change Request 170,modifying TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1, Operational Safety Review ML20116G4891996-08-0505 August 1996 Proposed Tech Specs Modifying 15.2.3 & 15.5.3 of Change Request 188 & 15.2.1,15.2.3 & 15.3.1.G of Change Request 189 Supporting SEs ML20116D7471996-07-29029 July 1996 Proposed Tech Specs Re Health Physics Manager Qualifications for Plant ML20112F7341996-06-0404 June 1996 Proposed Tech Specs 15.2.3, Limiting Safety Sys Settings & Protective Instrumentation & 15.5.3, Design Features - Reactor ML20117K1991996-06-0404 June 1996 Proposed Tech Specs 15.2.1, Safety Limit,Reactor Core, 15.2.3, Limiting Safety Sys Settings,Protective Instrumentation & 15.3.1.G, Operational Limitations to Maintain Safety Margin for Unit 2 W/Replacement SGs ML20112E2441996-05-29029 May 1996 Proposed Tech Specs 15.1 Re definitions,15.3.6 Re Containment sys,15.4.4 Re Containment Tests & 15.6 Re Administrative Controls ML20108D1531996-04-29029 April 1996 Proposed Tech Specs Re Removal of Fire Protection Requirements ML20108A0011996-04-24024 April 1996 Proposed Tech Specs Section 15.7 RETS Re Removing Items Identified in GLs 89-01 & 95-10 as Being Procedural Details & Relocating Items to Appropriate Documents ML20149D9691996-03-20020 March 1996 Proposed Tech Specs,Providing Corrected Page to Bases for TS 15.3.1 ML20100L3891996-02-27027 February 1996 Proposed Tech Specs,Consisting of Change Request 186, Modifying TS Section 15.4.4, Containment Tests, Spec I.C.1 to State That Type a Tests Shall Be Conducted Per 10CFR50, App J Modified by Approved Exemptions 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] |
Text
, _ _ _.
a e
Marked-Un Technical Specifications Panes Technical Specifications Channe Reauests 1%
Relocation of Turbine Overspeed Prvtection Technical Specifications to FSAR Point Beach Nuclear Plant. Units 1 and 2 i
1 l
i j
3 i
1 4
1 i
4 i
J t
i 9702200042 970212 PDR ADOCK 05000266-P PDR
i 1
2.
Single Unit Operation - One of the three operable auxiliary feedwater pumps associated with a unit may be out-of-service for the below specified times. The turbine driven auxiliary feedwater pump may be out-of-service for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. If the turbine driven auxiliary feedwater pump cannot be restored to service within that j
-72 hour time period, the reactor shall be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1 Either one of the two motor driven auxiliary feedwater pumps rnay be out-of-service for up to 7 days._ If the motor driven auxiliary feedwater pump cannot be restored to service within that 7 day period the operating unit shall be in hot shutdown within the l
next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
l D.
The main steam stop valves (MS-2017 and MS-2018) and the non-return check valves (MS-l 2017A and MS-2018A) shall be operable. If one main steam stop valve or non-retum check i
l valve is inoperable but open, power operation may continue provided the inoperable valve is 1
restored to operable status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise the reactor shall be placed in a hot shutdown condition within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With one or more main steam stop valves i
or non-return check valves inoperable, subsequent operation in the hot shutdown condition may proceed provided the inoperable valve or valves are maintained closed. An inoperable main steam stop valve or non-return check valve may however, be opened in the hot L
shutdown condition to cool down the affected unit and to perform testing to confirm operability.
E The crc crer s: cam dump system cha!! be operable. !f the crossover steam dump s,3:e:wis determined ic be inoperable, reduce pe".er-to less than 180 MWe (grc 3) "ithin 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />s-F During pe ver operati(m, at least one ef the turbine overspeed protectien systems that trip 4he turbine ::cp valves er -hut the turke ge.enw+alves cha!!4wrable. If all three :; : ems are determmed c be inoperah!e,ine! ate the turbine from the 3:eam supply cithkwhe-neu-six hours-
,i i
i 4
l Unit 1 Amendment NoA41 A4areh44W5 l
Unit 2 - Amendment NoA65 15.3.4-2a
i i
d G.
Should one ef the turMne step va!ves er govemer.alves he declared inoperable, restore the inoperable valve to an operable s:atus "ithi 72 h-eure-4foperaNiity-eannot be restarah n-perform +neef-the fc!!cv ing actions Shut the affected va!ve within the next,ix-heure l
l 2.
belate the turbmefrenHhe steam supp!; "it!Hhe next six hours.
Basis A reactor shutdown from power requires removal of core decay heat. Immediate decay heat removal requirements are normally satisfied by the steam bypass to the condenser. Therefore, core decay heat can be continuously dissipated via the steam bypass to the condenser as feedwater in the steam generator is converted to steam by heat absorption. Normally, the capability to return feedwater flow to the steam generators is provided by operation of the turbine cycle feedwater system.
The eight main steam safety valves have a total combined rated capability of 6,664,000 lbs/hr. The total full power steam flow is 6,620,000 lbs/hr, therefore eight (8) main steam safety valves will be able to relieve the total full-power steam flow if necessary.
l In the unlikely event of complete loss of electrical power to the station, decay heat removal would continue to be assured for each unit by the availability of either the steam-driven auxiliary feedwater pump or one of the two motor-driven auxiliary steam generator feedwater pumps, and steam discharge to the atmosphere via the main steam safety valves or atmospheric relief valves. One motor-driven auxiliary feedwater pump can supply sufficient feedwater for removal of decay heat from a unit. The minimum amount of water in the condensate storage tanks ensures the ability to maintain each unit in a hot shutdown condition for at least one hour concurrent with a loss of all AC power.
An unlimited supply is available from the lake via either leg of the plant sersice water system for an indefinite time period.
Unit 1 - Amendment No.-447 (4*reetion4etk+ dated Unit 2 - Amendment No.-14 15.3.4-2b May !!,1991
Each of the AFW pumps possesses a low suction pressure trip that will protect it should a loss of l
feedwater occur. Additionally, should a steam generator tube rupture occur, the motor-operated steam admission valves for the turbine-driven AFW pumps serve as isolation boundaries for the affected steam generator.
gs.m...m c c m,...m c..m.m....a...,.,..,.....
_am.e. m v m..m..... t........t :., m c mm...m. _m _ a....,. i.. m. spg.g
.m
...._. ~
~,
.,v~a. c.mu. ~m..m.,.,... :....:.,
rt._
c..
m._
a..,, m,. m, :
a.
.c.m..._..
v e. ~... ~.,.. m...
- r. u..m c,,.
...m._ m...m.m,.
...e.
.~
,a n
.t.m m... c.m._.., _m.,a..............a.. t......n.......n.:.m...... i _. m, 3-....m..m.._m 1,a m m. a.. n_ m. _ m...a.
m,._
v.... -
~.
..... ~ v.. -...
.vm N m. m m. : m.n.C,,..c..m.m.. x.
.,,.~...,.,, m m.m.,v -. m m,. a :. : n n.
T. n..m.,..c,.m.n..
m m s..c.. c, n.e cm..
/inDC T c m.u m -
-a_.m..~.
n:
v.Ime.. pera, ted
~
- g.. m...
.m..t..m.
,m.m. n.,.. L. _.... n..
.m.,, n. m : m..,.
..n :
.m....m...m...n..m :
1 m.
.m m,...m.am. _c _...
v~. v. -. m.-..,._
.m
.,m,. m..,..
y
.. - - ~. ~
gm.m....m,., _m.. m._.... m. a..m..c.:i.... _:.m.:.. u. m _ m, m.
...c.m..
.~...e..,.,.m,, cn..n.. um-a m a_. ~. d
_ a.,, m
. ~........ _......-
inoper.akn. : c,.., m.m, c. n... cm. a....e., a.. ~, :, n a., _ a. :., m.. m u..
..,.., _ ~._
..~ e...~
gggge.n...m...-~.m.
c...m.._, a.... e.,.,~. m.m..,. n..., _.. _. n..m..
- m. n...m
,~.,....~..n_m. v.
- m...,m.-. n..m.ggge
__,m
.m..,c. -... m..m. v-_ a. m., a : : m _
rn... c.
- c. c.. m.... ~. :-. n..m
., _ n., : ~. a. ~...m
,.v~.. :.,._.m n.... :
.. g41
__a.c...-
~ -. _.. ~...
...... ~........ -...
c.m...
_m.,..: o.. _ a.., i _, m.. m a. :... n...m....n:., m m,,._ _. m.m. a, ~m.,.,1, c.
- r. u...m, _o m,., a.cm._..m. a. ses ec m..c.c
.. ~_._..
, ~.
..m the-t m
..s..m.m_mm..I.: m.m., e -...., m k.
.m,.. m.. c m....t m..m.m.m c,v~... c..,,,I..., e.n...m
.m. m,. t. _: m,..
.c,v ~.. mon.~ o...m.m T. n.m
.,m..a c
mm
..mm
. ~.
tn..:..a.c.a.m..m ;c inDC T. n..:, c,.c.. m.m..m. ~m, e m.M
.k n..,..m c,y m m t.mi. ~m e...: m n.t h.,
..., a m m.a.c "x. c.
m
, c. n m..
~
~..... -..,
.. ~.
.~ -
-. ~.-
m~L. v,. m. t,. c.v.,,m a., a..g,.,. A.. r. n.m......... :m,
.. _.. ~...,c...m m c. n...m_ m t._....... A..,..: n... m.
m.m m
.m...:,.:m,..i. T.he m
.. ~ -..
... ~..
... v
.e _
meeha... m.a..,,. _._ a...:.
m ma.. c... _..... _a i. n_ D e m... m a.ae....t:.._.,.m.~ c. i.. _., _ mp m.., a. n......t a.. m..
...,v _... y m -
~....
..., ~
~.-
govermm..,a.....c,
.,L...,4, m 1..,:. n..>. n...m
.m. m :g.m..,.. 3-.m.
-...,.m, n. n..... m..m
..,........t.m,. gg,,,,,4
.m
~~.
,.m m m_.. c m
.~.... ~
3 tm4m... c,. _. a.. _, n. n.. um u o.a. :..,~mper a.n. : c :. _n
.. m. p,1. ~... emu..,.
...m. e.... a.. ~ -...._. a.
...a.m
_m_..
... ~c
~....
~.
..vm
- m. 3...a. A.....n :.s.
, 3.... ~. m.n.... A...,a. i um _A ma..._: :am m,..m.u. : c : a _ c.m...e v e m m.m.m.L i
..m
.. m _ _.
~v..-
r r-i
..... ~ - ~..
fe,a. t. m.
m
.m._1:am..m c.m m a. c.:e.,_m1..
.m
.v m..m The atmospheric steam dump lines are required to be operable because they are relied upon, following a steam generator tube rupture coincident with a loss of A.C. power, to cool down the Reactor Coolant System to RHR entry conditions. An atmospheric steam dump line is considered operable ifit is capable of providing the controlled relief of main steam flow necessary to perform the RCS cooldown. Isolating an atmospheric steam dump line does not render it inoperable if the line can be unisolated and the RCS can still be cooled down to RHR entry conditions, through local or remote operation, within the time period required by the applicable FSAR accident analyses.
Unit 1 - Amendment No.447 Correetion4etter4ated Unit 2 - Amendment No.4M 15.3.4-2c Ma.t !!.1991
TABLE 15.4.1-1 (continued)
PLANT CONDITIONS
~
NQ, CIIANNEL DESCRIPTION CIIECK CALIBRATE TEST WilEN REOUIRED 36.
Radiation Monitoring System D(7)
R(7)
M(7)
ALL 37.
Reactor Vessel Fluid Level System M
R ALL 38.
Refueling Water Storage Tank Level R
ALL 39.
Residuallleat Removal Pump Flow R
ALL 40.
Safety Valve Position Indicator M
R ALL 41.
Subcooling Margin Monitor M
R ALL 42 TwS:n Over: peed T:ips Deleted
'ndependen: Oven: peed Prc:ee&n Sy; ten
't M(!)
^lA Os en peed !!!cck trip R
M(!)
A!1 43.
Volume Control Tank Level R
ALL 44.
Reactor Protection System and M(1,23)
ALL Emergency Safety Feature Actuation System Logic 45.
Reactor Trip System Interlocks
-Intermediate Range Neutron Flux, P-6 R(24)
R ALL
-Power Range Neutron Flux, P-8 R(24)
R ALL
-Power Range Neutron Flux, P-9 R(24)
R ALL
-Power Range Neutron Flux, P-10 R(24)
R ALL
-Ist Stage Turbine impulse Pressure R(24)
R ALL Unit 1 - Amendment No.45-7 Page 4 of 6 Deeember 8,1991 Unit 2 - Amendment No-M4
= ~.
TABLE 15.4.1-2 (Continued) 1 Icst Freauenev 7.
Spent Fuel Pit a) Boron Concentration Monthly b) Water Level Verification Weekly 8.
Secondary c' a' ant Gross Beta-gamma Weekly (')
Activity or gamma isotopic analysis lodine concentration Weekly when gross Beta-gamma activity equals or exceeds 1.2 Ci/cc
9.
Control Rods a) Kod drop times of all Each refueling or U
fulllength rods )
after maintenance that could affect i
proper functioning ")
b) Rodworth measurement Following each refueling shutdown prior to commencing power operation 04 10.
Control Rod Partial movement of Every 2 weeks all rods i1.
Pressurizer Safety Valves Set point Every five years '")
12.
Main Steam Safety Valves Set Point Every five years (")
13.
Containment isolation Trip Functioning Each refueling shutdown 14.
Refueling System Interlocks Functioning Each refueling shutdown 15.
Service Water System Functioning Each refueling shutdown J
16.
Primary System Leakage Evaluate Monthly )
17.
Diesel Fuel Supply Fuel inventory Daily 18.
Twbirdopand4ewrnor_Ddeled Func4kming A:maalV' Valws 19.
L: ; Pr=ure Tu:hineJdeled V !' s." and4nagnene Rwry4ws ReiOF4n$peCliOR-par!!chW4N}HN}
penetrant 20.
Boric Acid System Storage Tank and Daily"*
piping temperatures 2 temperature required by Table 15.3.2-1 Unit 1 - A.mendment No.448 Unit 2 - Amendment No.-442 Page 2 of 4 December 12,19%
. _ - =.
TABl.E 15.4.1-2 (Continued)
Icil Freauency 21.
PORV Block Valves
- a. Complete Valve Cycle Quarterly (")
- b. Open position check Every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ("'
22.
Integrity of Post Accident Evaluate Each refueling Recovery Systems Outside cycle Containment l
l 23.
Containment Purge Supply Verify valves are Monthly M l
and Exhaust isolation locked closed Valves 24.
Reactor Trip Breakers
- a. Verify independent Monthly
- J operability of automatic shunt and undervoltage trip functions.
i i
- b. Verify independent Each refueling operability of man-shutdown ual trip to shunt and undervoltage trip functions.
25.
Reactor Trip Bypass
- a. Verify operability Prior to Ikeakers of the undervoltage breaker use trip function.
- b. Verify operability Each refueling of the shunt trip shutdown functions.
- c. Verify operability Each refueling of the manual trip shutdown to undervoltage trip functions.
26.
120 VAC Vital Instr.
Verify Energizedo2)
Shiftly Bus Power i
27.
Power Operated Relief Operate"0 Each shutdown""
Valves (PORVs),
PORV Solenoid Air Control Valves, and Air System Check 28.
Atmospheric Steam Dumps Complete valve cycle Quarterly 29.
Gn= :: Stea : D=7 ys:::n_Dekted--Vwifyqwal444 y e
Quarterly S
eadH,teanulemp+alves Unit 1 - Amendment No.-M8 Unit 2 - Amendment No.442 Page 3 cf 4 Deeember 12,1991