Deficiency Rept Re Seismic I Hanging Conduit Lacking Appropriately Approved Detail Per Recent Audit.Addl Info Required for Approval Not Sent.Criteria & Drawings Will Be Prepared to Prevent Further Occurrences
ML19290A498
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/20/1973
From: John Miller
METROPOLITAN EDISON CO.
To:
Shared Package
ML19290A466 List:
References
NUDOCS 7911070726
Download: ML19290A498 (2)


Text

- '

/ 'Za#&r71j cv :. J- /

/

l ,N',,*;.',, mio no nxorss

/

/ /

/ METROPOLITAN EDISON COMPANY __ _; m em.uvv;ac umma ccucmmce /

' CST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 4601 August 20, 1973 Dr. D. F. Knuth, Directur Directorate of Regula. tory Operations United States Atomic Energy Cormaission Washington, D. C. 20545

SUBJECT:

Three Mile Island Nuclear Station Unit No. 1, Report of Significant Deficiencies; Electrical Conduit Seismic Hangers Docket No. 50-289

Dear Dr. Knuth:

You were notified on July 23, 1973, of a situation which could be con-sidered reportable under 10CFR50.55 (e)(1)(1), " Conditions of Construction Permits."

This situation related to seismic electrical conduit hangers.

DESCRIPTION A recent audit indicates that the Seismic I hanging conduit does not have appropriately approved detail. Detailed sketches of conduit hengers had been forwarded to the Engineer in June of 1971 for approval, but such approval was withheld pending additional information. By some oversight, this additional information was never sent to the Engineer. In the interim, conduit has been hung in accordance with thoce details.

CORRECTIVE ACTION A thorough review of conduit hangers is now in progress spearheaded by a task force consisting of:

Gilbert Associates Structural Engineering Department United Engineers Electrical Ccnstruction Department United Engineers Quality Control Department GPU Quality Assurance Department The task force is charged with inspecting and analyzing the Seismic I conduit installation to assure their acceptability. Any corrections to the present supports will be made with the results presented by this group.

1557 340 7911070 M 6

Dr. D. F. Knuth Pace Two PREVENTIVE MEASUPIS Necessary criteria and drawings will be prepared to prevent further occur-ence of this nature.

Very truly your,s ,

s rf 71-

-l J'.'.' G. Mille r Vice President bav cc: Mr. J. P. O'Reilly, Director Directorate of Regulatory Operations Region 1 Mr. W. A. Verrochi Vice President GPU Service Corporation 1557 341