MONTHYEARML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed ML20249B7791998-06-22022 June 1998 Part 21 Rept Re Findings,Resolutions & Conclusions Re Failure of Safety Related Siemens 4KV,350 MVA,1200 a Circuit Breakers to Latch Closed ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML20217C2481998-04-21021 April 1998 Potential Part 21 Rept Re Failure of Siemens Circuit Breaker to Close Latch in Test Position W/Ge Test Flag Installed. Cause Indeterminate.Will Ship Identified Circuit Breakers to Siemens Mfg Facility in Wendell,Nc for Checking Procedure ML18065B1351998-01-0606 January 1998 Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 9712011997-11-20020 November 1997 Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys1997-10-13013 October 1997 Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-0041997-08-14014 August 1997 Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML20134B2301997-01-24024 January 1997 Final Part 21 Rept Re Potential Safety Concern on Matl Used for Fabrication of Permanent Canal Seal Plate.Correpondence W/Fabricator & Matl Supplier Documents Tig Automated Welding Process Used to Fabricate Angle Pieces ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power1996-04-15015 April 1996 Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power ML20101N8441996-04-0505 April 1996 Interim Part 21 Rept Re Potential Safety Concern on Matl for Fabrication of Permanent Canal Seal Plate.Licensee Will Provide Final Rept to NRC in Approx Six Months Upon Completion of Evaluation of Welds ML18065A5001996-02-15015 February 1996 Part 21 Rept Re Hex Bolts Mfg by Cardinal Industrial Products (Cip).Aerofin Will Provide Replacement Bolts for Bolts in Question If Util Notify Aerofin in Writing within 30 Days of Date of ltr.10CFR21 Rept from CIP Encl ML18065A1441995-10-0404 October 1995 Part 21 Rept Re Fastener Products (Hex Bolts) Mfg by Cardinal Industrial Products.Bolts Used as Header Cover Plate Bolts in Safety Related Containment Air Cooler Replacement Cooling Coils Furnished by Aerofin Corp to CPC ML18064A8841995-08-30030 August 1995 Part 21 Rept Re Presence of Hardwired Connection in Each of Four Containment High Pressure Trip Logic Circuits.Jumpers Removed in Slot 11 of Interconnection Module Assemblies in All Four Channels ML20082E7421995-04-0404 April 1995 Part 21 Rept Re Nonconformance in Dresser Industries,Inc (Dresser) MSSV Owned by Entergy Operations,Inc ANO Unit 1. Part Used in Safety Valve That Was Not Mfg to Spec Requirements & Not Mfg Nor Provided by Dresser ML20070Q5721994-05-10010 May 1994 Part 21 Rept Re Potential Defect of Samtec,Inc 11-pin Connector Socket in Pro Series Bargraph Instrumentation. All safety-related Bargraphs That May Contain Suspect Connector Have Been Identified & Licensee Notified ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058G5981993-11-17017 November 1993 Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl ML20057G1511993-10-0707 October 1993 Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door ML20056E9751993-08-19019 August 1993 Provides Insp Results & Safety Analysis Re Operational Amplifiers Discussed in 920917 & 23 Ltrs as Potential Safety Issue.Concludes That There Are No Safety Concerns W/Respect to Buffer Amplier Module.Ltr Not 10CFR21 Notification ML18058B9021993-07-0101 July 1993 Part 21 Rept Re Potential Defect in Vicor Corp mini-mod Dc/ DC Converter Modules.Deficiency Identified During Failure Analysis of Subj Modules While in Svc at Palisades in Apr 1993.Affected Dc/Dc Converter Modules at Plant Replaced ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 ML20044G5011993-05-26026 May 1993 Part 21 Rept Re Buffer Amplifier Modules Mfg by Bailey Controls Co Containing Suspect Negative Ref Power Supply Having Safety Implications.Caused by Design Error in Circuitry.Modules Would Not Result in Miscalibration LD-93-003, Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared1993-01-13013 January 1993 Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20126F8081992-12-22022 December 1992 Part 21 Rept Re Possible Condition of Gag Plug in Cap of Valves That Cause Valves Not to Lift to Requirement for Providing Full Capacity.Affected Customers Notified.Removal of Caps &/Or Gag Plugs Recommended ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl 0CAN119206, Part 21 Rept Re Inadequacy of Asea Brown Boveri (Abb) ITE-62L Solid State Relays W/Respect to Electrical Noise Immunity.Subj Relays Installed in Unit 1 RB Cooler Control Circuitry Will Be Replaced During Unit 1 Refueling Outage1992-11-11011 November 1992 Part 21 Rept Re Inadequacy of Asea Brown Boveri (Abb) ITE-62L Solid State Relays W/Respect to Electrical Noise Immunity.Subj Relays Installed in Unit 1 RB Cooler Control Circuitry Will Be Replaced During Unit 1 Refueling Outage ML20115C7151992-10-13013 October 1992 Initial Part 21 Rept Re Abb Pneumatic Timers in Control Circuits for EDG Svc Water Pumps & Reactor Bldg Cooling Fans Exhibiting Early time-out.Significant Disagreement Exists Between Util & Vendor Over Testing Requirements ML20118B2191992-09-23023 September 1992 Suppl to Part 21 Rept Re Potential Deviation in Some Bailey Controls Co 88 Series Modules,Transmitted Via .One Module Found Incapable of Reaching 100% Output at Max Rated Load.Recommends That Circuit Board Assemblies Be Inspected ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML18058B0201992-08-24024 August 1992 Part 21 Rept Re 920513 & 0701,premature Lifting of Farris Safety Relief Valve RV-3128 & SI Tank T-82B Relief Valve. Initially Reported on 920701.Caused by Misalignment of Spring Adjustment Screw Bore.Bonnet & Spring Replaced ML18058B0051992-07-30030 July 1992 Part 21 Rept 23967:on 920513 & 0701,Farris Relief Valve RV-3128 & SI Tank Relief Valve T-82B Lifted Prematurely. Caused by Misalignment of Spring Adjustment Screw Bore in Valve Bonnet.Util Has 23 Subj Valves in Facility ML18058A4551992-05-15015 May 1992 Part 21 Rept Re Allis Chambers Switchgear Breakers Refurbished by Sitek of Milwaukee.Original Procurement of Breakers Before IEEE Stds Were Developed.Breakers Sent to Sitek of Milwaukee for Refurbishment ML18058A4131992-04-23023 April 1992 Part 21 Rept Re Improperly Terminated Wires on Closing Relay for 2,400-volt Switchgear Mfg by Allis Chalmers & Refurbished by Sitek of Milwaukee.Corrective Actions Not Yet Determined.Palisades Only Facility W/Subj Defect ML20090L8801992-03-18018 March 1992 Part 21 Re Cracked Piston Castings Received from Acme Foundry,Fairbanks Morse & General Casting.Magnetic Particle Insp of All Pistons Will Be Performed.List of Affected Plants Encl ML20079G5601991-09-16016 September 1991 Part 21 Rept Re Mismatch in Heat Duty Between Air Cooler HX & Jacket Water Hx,Discovered During Review of Generic Ltr 89-13.Initially Reported on 910913.Results of Analysis of Six Different non-design Scenarios Submitted ML20077A4041991-04-29029 April 1991 Deficiency Rept Re Possible Mfg Problems W/Certain Coils Used on Asco Nuclear Qualified Valves.Problems Discussed in NRC Info Notice 86-057.All Purchasers Will Be Notified & Replacement Product Will Be Offered If Item Still in Svc L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl1991-01-0404 January 1991 Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl ML17262A2621990-11-30030 November 1990 Part 21 Rept Re Chilled Water Sys.Initially Reported on 901030.Evaluation of Perry Plant Will Be Sent by 901230 1998-09-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML20217L8931999-10-31031 October 1999 Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant 0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216J6271999-09-27027 September 1999 Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 Colr ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20211F4281999-08-25025 August 1999 Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with ML20210K8831999-07-29029 July 1999 Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20207E7231999-06-0202 June 1999 Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML20196A6251999-05-31031 May 1999 Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20195D1991999-05-28028 May 1999 Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 ML20206M7711999-05-11011 May 1999 SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206F0691999-04-29029 April 1999 Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20205M6941999-04-12012 April 1999 Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1 ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML20205R6351999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with ML20205D6061999-03-31031 March 1999 Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon Steel ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With 1999-09-30
[Table view] |
Text
. .
^'U &"rjgL7 !
, ,a g.. -- -- /
n .n an ex nocom
/
/
/
METROPOLITAN EDISON COMPANY .scunoc anesavusucunune:ccarosanc:. l ,
POST OFFICE BOX 542 READING, PENNSYLVANIA 19603 TELEPHONE 215 - 929-3601 August 17, 1973 P
Dr. D. F. Knuth, Director Directorate of Regulatory Operations United States Atomic Energy Commission Washington, D. C. 20545
SUBJECT:
Three > Ele Island Nuclear Station Unit No. 1 Docket No. 50-289 Grease Leakage from the Vertical Bulk Filled Reactor Building Tendons
Dear Dr. Knuth:
You were notified on July 20, 1973, of a situation which could be considered reportable under 10 CFR 50.55 (e)(1)(iii), " Conditions of Construction Permits." This situation relates to grease leakage from the vertical bulk filled reactor building tendons.
DESCRIPTION OF INCIDENT On July 20, 1973, an investigation was conducted of the reactor con-tainment building exterior concrete wall between the elevations of 279'0" and 284'6". This investigation was conducted as a result of a report of unusual staining of the concrete in that area.
It was found that there was an cil-like substance emerging from approxi-mately 30 vertical hairline shrinkage cracks just above the base mat. The area around the cracka were stained and in some cases there was small accu-mulation on the floor below the cracks. Approximately 12 other leaks were observed higher up on the exposed wall. It appeared that these leaks were also from vertical hairline shrinkage cracks. The actual length of the cracks appeared to be about one foot.
The source of this oil-like substance was concluded to be the 2090P casing filler, manufactured by Viscosity 011 Company, that had been bulk-filled into the vertical tendon conduits. Only the vertical tendon had been stressed and conduits bulkfilled at this time.
The vertical tendons had been bulkfilled during the period June 7 to June 15, 1973. No leakage was observed during this period of bulkfilling or during the period immediately following that tine. It is unknown how long the leaks had been evident before they were discovered.
1557 344
- 81107o Gp7
Dr. D. F. Knuth ~'
Page Two a
CORRECTIVE ACTION The following are results of actions taken as of August 17, 1973:
- 1. The liner plate was checked and no bulging or buckling was found.
- 2. Samples of the bulk fill material were taken from two of the vertical tendons, tested in accordance with ASTM test requirements, and found .
to comply with ASTM and Engineer's specification. A sample of the substance eminating from the cracks will be analyzed and compared with a similar analysis of 2090P casing filler material to determine any separation.
- 3. It was reported that two plants have experienced similar problems--
Palasades & Arkansas. Viscosity 011 Company has supplied casing filler to both of these projects. At Palasades the material was Visconorust 2090P. At Arkansas two casing fillers were used, Visconorust 2090P and 2090P-1. The Visconorust 2090P-1 is a modification of the original 2090P which increases the consistency slightly at lower temperatures.
According to Viscosity 011 Company, the bulkfill =aterial is wax base and is self-sealing where microcracks are the leakage path as the case here.
- 4. A total of*59 " Crack / stains" have been discovered as of August 10, 1973, sixteen (16) having appeared af ter the initial survey on July 20, 1973.
A daily survey has been initiated so as to observe the degree of acti-vity of the seeping oily substance. The concrete surfaces at each loca-tion have been cleaned (with solvent) periodically so as to facilitate the evaluation of the degree of flow of the substance.
Of the 59 " crack / stains," apprcximately 37 have maintained a steady flow rate, 11 have reduced flow rates and 11 have become inactive.
Cessation of 20 percent of the presently located leaks indicates a possible self-sealing effect is in progress, which should be aided by stressing of all hoop tendons. Surveillance during doce and hoop tendon bulk filling will be conducted regularly over the entire exterior building surface.
Plans presently call for using Visconorust 2090P-2, the third generation casing filler, which is heavier in consistency than all previously supplied material. This casing filler will be used for the balance of tendon greasing.
Very truly yoursg' ^
v y, / %
J[ G. Miller bav Vice President ec: Mr. J. P. O'Reilly, Director Region I f Directorate of Regulatory Ope, rations Mr. W. A. Verrochi 1557 345 Vice President GPU Service Corporation