ML20216F098
| ML20216F098 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/28/1998 |
| From: | Heysek W, Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1920-98-20129, NUDOCS 9803180250 | |
| Download: ML20216F098 (3) | |
Text
s
.p
{
GPU Nuclear, Inc.
(
floute 441 South NUCLEAR Post Off ce Box 480 Middletown, PA 17057-0480 Tel 717-944-7621 March 11,1998 1920-98-20129 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for Febatary 1998 Enclosed are two copies of the February 1998 Monthly Operating Report for Three Mile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
l i
l Sincerely, N
M J. W nbach Vice President and Director, TMI l
WGH cc: Administrator, Region i TMI Senior Resident inspector 97001 i
9803180250 900228 h!$f!$llllllllllllllllllllllllllll ADOCKOS00g9 PDR R
j
o APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-289 DATE March 11, 1998 COMPLETED BY W. HEYSEK TELEPIlONE (717) 948-8191 REPORTING PERIOD: FEBRUARY 1998 YEAR TO MONTH DATE CUMULATIVE 1.
DESIGN ELECTRICAL RATING (MWe 819.0 NET).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2.
MAXIMUM DEPENDABLE CAPACITY 786.0 (MWeNET).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the nonnal station sersice loads.
3.
NUMBER OF HOURS REACTOR WAS 672.0 1,416.0 127,127.7 CRITICAL.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4.
HOURS GENERATOR ON LINE.
672.0 1,416.0 125.925.0 (Senice !!ours) The total number of hours during the L
gross hours of the reporting period that the unit
]
operated with the breakers closed to the station bus.
l The sum of the hours that the generator was on line plus the total outage hours in the reporting period.
5.
UNIT RESERVE SHUTDOWN HOURS.
0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from I
senice for economic or similar reasons but was I
available for operation.
I 6.
NET ELECTRICAL ENERGY (MWH).
553,298.0 1,165,701.0 98.228,135.1 7he gross electrical output of the unit measured at j
the output tenninals of the turbine generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
- Design values have no " Year to Date" or " Cumulative" significance.
1
M o
I S
=-
U Se1 m m
ts e
M o
in M
W=
4 4
A R
TCDD R
E EOAO P
L Y
O E MTC R
P P EK T
T H L E
O eM T h
I e
N a N i
p D
N tr O l
e G
a es E uc.
n P
( Bh E
7 t
5 e
R T
0 1
J n
I 7
1 2 O
t
)
e 8
4.W e
T
- D 9
9 r
y d
p 8
1 H
e t
9 h
F 8E 1
9 e
E Y8 B
9 m
HoFEDcBAR 2 S
1 R
E RR -" L D
U K
owAPg-s
) a R
o F
e
- ni Nwt A
n 1amTy%
- F e &
e t
c n
u a
h r
m w
mm o
aR Y
p e
r s s r n 1
. e u a o a a
.m r
)
h ne g n Ts 9
e R
t s
= (E a
7 e
&wt s
e i
8 L
t s
n g
T a a x
o c
p t
n l
n" e
a s
g an m
1 s
0 r
0 e
l R
M e
ed h
p ra f
o o
d o
o wer U
a N
n I
d TA P
r S P e
m HE UN a
TD in e
DL 2
d OX a
WB t
N th S
a t
3 4w2t0 %ha po t
n h
i w
r - uu.
e nu e
(F l 4 a a T~l r
Sa le r
sa v
- = sa 3 =
e l
=
throu g
h the C
e s
a n
u d
N e
o o
t' f
n t
e he mon th d