Category:ANNUAL OPERATING REPORT
MONTHYEARML20207A9291998-12-31031 December 1998 1998 Annual Rept for TMI-1 & TMI-2 ML20217F7231997-12-31031 December 1997 10CRF50.59 Rept for Period Jan 1996-Dec 1997 ML20203H5621997-12-31031 December 1997 1997 Annual Rept for TMI Units 1 & 2 ML20203C6541997-12-31031 December 1997 Biennial 10CFR50.59 Rept, Describing Changes,Test & Experiments Made During Previous Two Cys.Description of Changes Made to Pdms SAR for Previous Two Cys Also Included ML20064C7441994-02-24024 February 1994 1993 TS Sections 6 Annual Rept for TMI-1, Including Aircraft Movement Data from Harrisburg Intl Airport for CY93,leak Reduction Program Test Info,Porv & Safety Valve Challenges & Results of Activity Analysis ML20095F4921991-12-31031 December 1991 10CFR50.59 Rept for 1991 ML20070U7031990-12-31031 December 1990 10CFR50.59 Rept for 1990, Including Changes to Sys & Procedures Described in SAR ML20042E9051989-12-31031 December 1989 10CFR50.59 Rept for 1989. W/900426 Ltr ML20042D7541989-12-31031 December 1989 10CFR50.59 Changes,Tests & Experiments Rept for 1989 ML20245K9401989-06-29029 June 1989 Summary of Changes to TMI-1 Sys & Procedures as Described in SAR for 1988 ML20246P1681988-12-31031 December 1988 Changes,Tests & Experiments Re TMI-2 Recovery Activities ML20151Q6151988-04-19019 April 1988 Summary of Changes to Facility Sys & Procedures for 1987 ML20147F1821987-12-31031 December 1987 Description of Changes,Tests & Experiments from Facility Sys & Procedures for 1987 ML20205A6441984-12-31031 December 1984 Annual Rept of Facility Changes,Tests & Experiments,1984 ML20081D0981983-12-31031 December 1983 Annual Rept of Personnel Exposure Data,Aircraft Movement Data from Harrisburg Intl Airport,Leak Reduction Program Test Info & PORV & Pressurizer Safety Valve Challenges for 1983 ML20071J9981983-05-10010 May 1983 Changes to Sys & Procedures Described in FSAR Per 10CFR50.59 ML20052E7391982-05-0303 May 1982 Addendum to Annual Operating Rept for 1981 ML19210A1421975-11-17017 November 1975 First Year Operation Rept,TMI-1, Ending 750902 1998-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1001999-10-14014 October 1999 Errata to Safety Evaluation Supporting Amend 215 to FOL DPR-50.Credit Given for Delay in ECCS Leakage ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216F9231999-09-22022 September 1999 Safety Evaluation Supporting Amend 216 to License DPR-50 05000289/LER-1999-010, :on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With1999-09-21021 September 1999
- on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With
ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211E8731999-08-24024 August 1999 Safety Evaluation Supporting Amend 215 to License DPR-50 ML20211B1931999-08-19019 August 1999 Safety Evaluation Supporting Amend 214 to License DPR-50 ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With 05000289/LER-1999-009, :on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced1999-07-22022 July 1999
- on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced
ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20212H9101999-06-21021 June 1999 Safety Evaluation Supporting Amend 212 to License DPR-50 05000289/LER-1999-007, :on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed1999-06-18018 June 1999
- on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed
05000289/LER-1999-005, :on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With1999-06-14014 June 1999
- on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With
ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 05000289/LER-1999-003-01, :on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open1999-05-0707 May 1999
- on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open
ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20205Q6111999-04-15015 April 1999 Safety Evaluation Supporting Amend 210 to License DPR-50 ML20205Q5981999-04-13013 April 1999 Safety Evaluation Supporting Amend 209 to License DPR-50 ML20206P2841999-04-12012 April 1999 SER Approving Transfer of License for Tmi,Unit 1,held by Gpu Nuclear,Inc to Amergen Energy Co,Llc & Conforming Amend, Per 10CFR50.80 & 50.90 ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With ML20209G0071999-03-31031 March 1999 Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) 05000289/LER-1999-002, :on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With1999-03-14014 March 1999
- on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With
ML20210C0161999-03-0101 March 1999 Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246 ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With 05000289/LER-1999-001-01, :on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys1999-02-19019 February 1999
- on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys
ML20196K3561999-01-22022 January 1999 Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With1999-01-11011 January 1999
- on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With
ML20207A9291998-12-31031 December 1998 1998 Annual Rept for TMI-1 & TMI-2 ML20196G4661998-12-31031 December 1998 British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer Encl ML20196F6861998-12-0202 December 1998 Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20195C6921998-11-12012 November 1998 Safety Evaluation Supporting Amend 52 to License DPR-73 ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20203G1211998-10-30030 October 1998 Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt ML20155E7511998-10-15015 October 1998 Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing 05000289/LER-1998-013, :on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance1998-10-15015 October 1998
- on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance
05000289/LER-1998-010-01, :on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued1998-10-0909 October 1998
- on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued
ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With 05000289/LER-1998-011, :on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge1998-09-23023 September 1998
- on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge
05000289/LER-1998-009-01, :on 980820,discovered Potential Loss of HPI During Postulated Loca.Caused by Misapplication or Interpretation of Design Inputs.Revised OL Was Implemented & Mut Pressure & Level Limits Analysis Revised1998-09-18018 September 1998
- on 980820,discovered Potential Loss of HPI During Postulated Loca.Caused by Misapplication or Interpretation of Design Inputs.Revised OL Was Implemented & Mut Pressure & Level Limits Analysis Revised
1999-09-30
[Table view] |
Text
..
-.. - - -.... -.. ~
l f
L.
l i
r l
5 t
ATTACHMENT 1 l
l TABULATION OF TMI WORKER EXPOSURES l
BY WORK AND JOB FUNCTION JANUARY 1,1998 THROUGH DECEMBER 31,1998 l
6 9
I l
.9903050319 990224.
PDR ADOCK 05000289 R
PDR n.y 4
1
\\
1920-99-20078 Page1 of4 maeER or PERs0BuBL Ano PERs0N Rams my iIORIt als Jon PumCTICIr
. (INTEalmL + ExTBasmL sRO) j SPU NUCLEAR WIII 12 TIT-1 REPORT PERIOD = 01/01/98 TO 12/31/90 Joh CATEGORY SEkTION PERSCIEEL UTILITY PERSOF3EL CONTRACTOR PERSDIGIEL JOB PERICTICII IRESER RBIS IltmeER RBIS IltasER R3013 1
SEACTOR OPElthTICIIS/SURV.
]
ImINymunIICE P=maasn'er-54
.2e4 0
.000 0
.000
. OPRIATIIIs PERscammL -
46
.450 0
.000 0
.000 l
NEALWit PNYSICS pmmerr-29
.567 0
.000 0
.000 SUPEltVISORY ' PERs0PRIEL 22 '
.401 0
.000 0
.000 I
"" PER8couRL '
19
.199 1.
000-0
.000 ADRIIIISTI&TIVE PERSCImmL 16
.024
'5
.049 0
.000
' acygg3Ig m.
f ImIIP4BImIICE PEascammL -
107 3.934 14
.000 3
.107
- OPERATIIIS PERSom 110 4.882 1
.000 1
.033 NE<il PIlYSICS 7"'-
62 2.870 32
.001 0
.000 SUPERVISORY PERSCIEIEL 71
.752 4-
.023 0
,000 EIIeman-PERSCIEEEL 63
.206 7
.003 5
.041 AtaIINSTIlkTIVE PERSCIRIEL 50
.138 63
.075 5
.026
' INSERVICE INSPECTICII -
IRINTEMhlICE PEmaceuRL 6
.036 0
.000 0
.000 OPERATIIIe PER80mIEL 1
.000 0
.000 0
.Ir30 EIISumam PRRSCISIEL 1
.000 0
.000
'O
.000 AERIINSTRATIVE PERSOIBIEL 2
.000 0
.000 0
.000 i
I
.sPECIAL ImINeumMCE IRIIITERIhlICE PERSCIEEL 91 1.250 1
.000 4
.434
" OPEhkTIIIe PERSCIEEL 30 176 0
.000 0
.000 llEALTit PNYSICS PERSOIREL 14
.031
-1
.000 0
.000
)
SUPERVISORY PERSOIEEL 10
.070 0
.000
-0
.000 BIIOmamTina FEascemIEL 10
.040 1
.000 0
.000 mramsayagygv5 PEm30mIEL 12
.046 10
.041 0
.000 ImBTE PROCE851110 i
IRINTRIIhlICE PER801EIEL 22
.035 0
.000 0
.000 i
-OPERhTING Peas 00mEL 19
.153 0
.000 0
.000 j
IREALTH PItYSICS PER301aIEL 25
.046 24-
.000 0
.000 DVPERVIBORY PER800BIEL 12
.013 0
.000 0
.000 BIIgrammanTu'O Penarmrf-6
.000 0
.000 0
.000 AtaIIWsTRATIVE Paks0EIEL 10
.000 it
.000 0
.000 l
l I
i k
E I
1 l
\\
1920-99-20078 Page 2 of 4 MRSER OF PERSORBIEL AND PER800f RS88 BY DIORK AND JOB PUIICT10tl 1
(IlfTERIthL + EXTENEhL SRD)
)
GPU afUCLEAR StG UNIT-1 j
REPORT PERICO - 01/01/98 TO 12/31/98 i
JOB CATEGORY STATIC 05 PER300 RIEL UTILITY PEmactBIEL COIITRA TOR FER80tetEL l
' JOB PUIICTIott MASER REBIS MRdBER REMS MadBER REld5
- tihINTRISIICE PEasolafEL 110 5.539 15
.000 7
.541 OPERATING PERSotelEL 110 5.669 1
.000 1
.033 NEALTN PEYSICS PERSoteIEL 64 3.514 33
.001 0
.000 s
SUPERVISOPY PERACsentEL 72 1.322 4
.023 0
.000 ENGIIEEE*11NG PERSCIBIEL 66
.445 0
.003 5
.041 A0BENSTRATIVE PERscenIEL
'f2
.200 60
.165 5
.025
494 16.697 129
.272 18
.641 I
)
I-1 J
l'
{
i l
1 l
i i
e
- ~...-.
. -. ~..
9 1
1920-99-20078 Page 3 of 4 -
IRBSER OF PERSoleIEL ARW PERSCII RasS RY DIDRK AMD 000 PURICTIC0t -
I
.(IIPPERumL + EXTERIO& $RD) i I
SPU IIUCLEAR TIE UttIT-2 REPORT PERIOD - 01/01/98 TO 12/31/90 I
aos CmTEe0Rr
. sTATICII PERSOIEEEL UTILITY PERSONNEL CQtrFRACTOR PERSomtEL JDE FUIOCTIcet 3RaeER REBIS InneER Rass 3ResER Rata REACTOR OPERATIOgls/3URV.
1 MkI3fTEISBBCE PERSCIEEEL 4
.014 0
.000 0
.000 l
IREALTH PHYSICS PERSoletEL 2
.052 0
.00s 0
.000 l
ROUTINE MkINTmEMICE 8
ML.4 PERatunner.
61
.093 0
.000 1
.000 OPERATIIIS PERS00mEL 70
.252-0
.000 0
000 l
MBALTE PMYSICS PERSoggIEL 1s
.113 0
.000 -
1
.000 SUPERVISORY PERSCOBIBL 21
.090 1
.000 0
.000 EIOG m ma N PERSCOSfEL 16
.014 1
.000 3
.001 AISEIIISTRATIVE PERSOIBIEL -
25
.001 2
.000 0
,000 SPECIAL REIllTamIOCE MkIarfEIEMICE PERSoteIEL 14
.014 0
.000 0
.000 OPERATING PERSOOBIEL 11
.039 0
.000 0
.000 MEPLTil PNYSICS PERSceeEEL P
.037 0
.000 0
.000 SUPERVISORY PERSoleIEL 1
.007 1
.006 0
.000 ADecNSTRATIVE PERSolerEL 0
.?00 3
.020 0
.000 i
i 1'
i 1
i l
l l
I l
l i
l 1
l 1
I I
l d
1 b
.I a
1920-99-20078 Attachment i Page 4 of 4 1
)
masutR Or PERscanntL Ano PERs0s: RENs my wore Aun Joe PuMCTION (INTERuaL + ExTERNRL sRD)
GNU NUCLEAR SMI UNIT-2 REPORT PERICO - 01/01/98 TO 12/31/90 JOB ChTEGORY STATION PERaotafEL UTILITY PER30enfEL CONTRACTOR PER308BfEL JOB PUNCTION NUBSER RAMS-MASER REMS mRARER REbES
69
.121 0
.000 1
.000 i
OPERATING PERSOIRIEL 77
.291 0
.000 0
.000 ME<N PNYSICS PER300 RIEL 21
.202 0
.000 1
.000 SUPERVISORY PER20BRIEL 21
.097 1-
.006 0
.000 ENSNN"O PERS00 RIEL 16
.014 1
.000 3
.001 AIREINSTRATIVE PERaoleIEL 25
.001 5
.020 0
.000
229
.726 7
.026 5
.001 i
'f a
L I
1 1
)
i l
l 1
i
-- ~ -.
)
6L20-98-20078
{
Page1of1
. ATTACHMENT 2 AIRCRAFT MOVEMENTS AT THE HARRISBURG INTERNATIONAL AIRPORT (HIA)-
1 JANUARY 1,1998 THROUGH DECEMBER 31,1998 1.
Total Aircraft Movements - 84,239 2.
Total number ofmovements of aircraft larger than 200,000 pounds is estimated to be 588, 1
i i
1 1
i
r
-O e
6L20-98-20076 Page1ofI ATTACHMENT 3 TECHNICAL SPECIFICATION 6.9.1.B.3 PERIODIC LEAK REDUCTION PROGRAM TEST RESULTS The results of the TMI-l 1998 periodic Leak Reduction Program Tests, which included visual inspections re summarized in Table 1. These tests were performed in accordance with the referenc-a procedures. (See Note 1 for procedure titles.)
i
. TABLE 1 1998 LEAK REDUCTION PROGRAM TEST RESULTS FOR TMl l
i SURVEILLANCE DATE OF LEAKING MAINTENANCE LEAK LEAK PROCEDURES PEFFORMANCE COMPONENT UNDERTAKEN MTE MTE LD.
AS AS LEFT FOUND (SCCM) j (SCCM) j 1/16/98 AH-VIA/B 1424 1424 None 2/26/98 AH-VIC/D 3569 -
3569 None i
1303-11.18 4/19/98 Emergency hatch 892 892 None 4/20/98 Personnel hatch 1321 1321 None (Full LLRT not 4/26/98 AH-VIA/B 1580 1580 None performed RB 5/30/98
. AH-V1C/D 2808 2808 None purge valves and 8/7/98 AH-VIA/B 1209 1209 None
)
access hatches 8/26/98 AH-VIC/D 12129 1638 Retest only(Note 2) only) 10/13/98 AH-VIA/B
.1053 1053 None
'10/17/98 Emergency hatch 74 74 None 10/18/98 Personnel hatch 462 462 None j
11/25/98 AH-VIC/D 4485 4485 None j
l/27/98, 2/25/98, SF-V76 being i
1303-11.28' 3/26/98, evaluated for 0
0 None
& 4/30/98 potentialleakage Note 1: 1303-11.18, "RB Local Leakrate Testing"
.1303-11.28, " Liquid Waste System Leak Check" i
Note 2: Retest confirmed source of"as found" leakage was improper test rig
]
configuration.
7, x..
s 1920-99-20078 Page1 of1 ATTACHMENT 4 PRESSURIZER POWER OPERATED RELIEF VALVE AND PRESSURIZER SAFETY VALVE CHALLENGES IN 1998 There were no pressurizer power operated relief valve or pressurizer safety valve challenges in 1998.
i i;
7
u j *-
1920-99-20078 a
)
Page1of2 l
l ATTACHMENT 5 l
RESULTS OF SPECIFIC ACTIVITY ANALYSIS-
- PRIMARY COOLANT SYSTEM i
Technical Specification'6.9.1.B.5 requires _ annaal reporting of certain information regarding the i
results of specific activity analyses in which the primary coolant exceeded the limits of Technical
" Specification (TS) 3.1.4.1 The limits of TS 3.1.4.1 were not exceeded at any time during 1998.
')
The figure of RCS activity for 1998 shows that the limit of 0.35 microcurie / gram dose equivalent I-131 was'not exceeded in 1998. Page 2 of this attachment contains a graph of the dose equivalent iodine concentration for 1998.
N i.
l:
1 J
l I
l :
I l'-
8$2 7
t f 0 no 0 e 2 m2 9h e 9 c g
- aa
^
P 0 tt 2 A 9
1 02 1
1 89 9
1 5
0 0
1 8
9 9
1 f
4 1
1 3
8 1
0 8
e 9
in 9
1 do l
tn e
l a
9 v
2 i
u y
6 t
e q
i
. 0 t
E v
8 a
i 9
t 9 D es c
o 1
A D
S
^
0 C
y R
8 1
8 5
y
. 8 f
9 0
9 g
9 1
9 g
1 a
8 0
4
. 0 8
99 1
gy-8 1
y 20 8
y 99 L
1 f
2 0
1 0
8 9
0 1
2 39 0
0 0
01
+
E E
E E
0 0
0 0
0 0
0 0
1 1
1 1
=E$ ?.? E 5
. ~... _.
. ~
u s
j 1920-99-20078
~
Page1of1 l
ATTACHMENT 6 MAJOR CHANGES TO RAD WASTE TREATMENT SYSTEMS Technical Speci6 cation Section 6.17 requires reporting of." Major Changes -to Radioactive Waste Treatment Systems.". Major changes are interpreted to mean changes that would alter how the system functions or changes that would alter the predicted releases that were previously analyzed. There were Eno major changes to the liquid, gaseous, or solid radioactive waste treatment systems at TMI-1 'during the year of 1998.
J i
l s
h i
4 4
'l 1
)
'l
)
'I i
I i
i i,
1