Monthly Operating Rept for July 1999 for TMI-1.With
ML20210U479
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/31/1999
From: Heysek W, Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1920-99-20425, GL-97-02, NUDOCS 9908200124
Download: ML20210U479 (3)


Text

.

l GPU Nucleer,Inc.

(

Route 441 South NUCLEAR Post Office Box 480 Middletown, PA 17057-0480 Tel?17-944 7621 1920-99-20425 August 13, 1999 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for July 1999 Enclosed are two copies of the July 1999 Monthly Operating Report for Three Mile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this repon is in accordance with the guidance provided by Generic Letter 97-02.

Sincerely, bidd ames W. Langenbach Vice President and Director, TMl WGli cc: Administrator, Region i - liuben J. Miller g) g

{ ?j

' TMI Senior Resident Inspector - Wayne L. Schmidt I

File 99001 l

200009 WEN Ek R

I

q l

APPENDIX A OPERATING DATA REPORT DOCKETNO. 50-289 DATE August 13 1999 COMPERD BY W. IfEYSEK TEEPHONE (717)948-8191 REPORTING PERIOD: July 1999 YEAR TO MONTH DATE CUMULATIVE 3.

DESIGN ELECTRICAL RATING (MWe NET).

819.0 ne nominud net electrical output of the urut specified by the utthty and used for the purpose of plant design.

2.

MAXIMUM DEPENDABE CAPACrlY 786.0 (MWeNET).

The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station senice loads.

3.

NUMBER OF HOURS REACIOR WAS 744.0 5,087.0 139,558.7 CRITICAL.

The total number of hours during the gross hours of the reporting period that the reactor was critical.

4.

HOURS GENERATOR ON LINE.

744.0 5,087.0 138,356.0 (Senice Ifours) The total number ofhours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

He sum of the hours that the generator was on line plus the total outage hours in the reporting period.

5.

UNIT RESERVE SHUTDOWN HOURS.

0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from senice for economic or similar reasons but was available for operation.

6.

NET EECTRICAL ENERGY (MWH).

588.207.0 4,126,729.0 108,248.365.0 The gross electrical output of the unit measured at the output terminals of the turbine generator mmus the normal station senice loads during the gross hours of the reporting period, expressed in megauntt hours Negative quantities should not le used.

  • Design values have no " Year to Date" or " Cumulative" significance.

1

b U

e t' $ I S

U SF1 M

'Fe

'sc M

  • d
  • e 4

A R

TCDD R

E EOAO P

L Y

O EMTC R

P P EK 1

E T

T H 1 T

h I

O A

e N

i Nt uN p

D e

G EugO re P

u.

(

B s5 i

E 7

t Y t0 e

R 1

7 2

n IO

)

t e

T

D 9.W 18 e

9 r

H,3 4

y d

p 8

e t

J h

u 8E1 19Y9 e

ly 1 S 9 mo nc EFe5AR 2 1

E 9 9

- e OD o-l R

MEe e

ags ti 9

K n

t g

t h

n.

o m a

9 n7a

)mn s

u h

o

(

es en o

5 uar e

n 9mi Ty s

p e

a r

e aR sF r

ma r a i

s s

Ta e

d a

)

ma i

t sn i

s en R

n m

&at dF aa g

e Ln P

m a

m s

a e

t ns e

?

1 g

0 F

0

=

=

wM e

p d

w o

d w

=

of er U

an N

I d

T A o

P p

S P e

HE r

UN a

te TD d

DI 2

a OX t

WB th a

N t

S p

o 3

4v2t-M w

0 MMe e

t a a d h

nmw r

r e

ua d l

a d e

(5 9 s~ l S

v s

s e

a s

l

- au a

t

)

hro u

g h

theen C

_- m d

o f

N th o

C e

n a

m

_ m e

on t

.h l