Tais report -is being =ade pursuant to 10 CFR 50}55(e) on significant deficiencies q
i g-
^N
.to docu=ent the generic investigation of-the significant deficiency in the design J
i of, the internals handling fixture spherical nut' retaining device.
T Identification o f Problem l
4*
)
J g
During the preparation for plenus asse=bly' removal from the reactor vessel at
'IM1-1, it was noticed that the spherical nut was not secured to the threaded j
rod and could beco=a unthreaded.
The set screws on the three asse=blies were found to be either missing, loose, or the wrong length.
q Analysis A design review by B&W engineering has found that the set screw concept of
~
^
preventing the spherical nuts fron rotating relative to~ the threaded rods J
(i.e.., beco=e unthreaded) is inadequate in the original design.
The spherical j.O R,)
nuts could be unthreaded during the adjusting procedure, leaving inadequate thread engage =ent to support the weight of the internals.
Shoudl the threads shear off, the resulting drop of the internals fro: as little as.6 inches 1
f.
height could result in fuel da= age.
Drops from greater heights could also
^
result in damage to the internals and the reactor vessel.
\\
1 Evaluation l
4, With the inadequate method of capture between the spherical nut and the threaded rod, there would be no assurance that the proper thread engage =ent would cluays g
J
~
be =ade.
A scall drop of about 7 inches could cause fuel assembly da= age which
{
vould, adversely affect the safety of the internals handling operation.
This design deficiency is considered to be a significant deficiency pursuant to i.
m 8003040fif i
k i -
y.
, q..
- ll effseted plaues hava basn notified of tha ~ proble:2.
A Thera has baan no fail -
- }
ure of-the internals handling fixture and, thus, no da= age or adverse effect b
on safety resulting from -this deficiency.
g Y, s
.I t~
Corrective M tions i
- 1) On TMI-1,' the proble: was resolved by a - field =odification.
This =odification f.
1j
- consisted of drilling a hols ~1n tha.. threaded rod to ensura capture by the 4
set screw and staking of the set screw to ensure that the set screws' would t.
not back out.
I'
- 2) A redesign of the capture device has been i=ple=ented on other contracts.
p This design revision consists of attaching a plant to the botto= of the threaded rod which will not allow the' spherical nut to unthread.