MONTHYEARLD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999
[Table view]Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20217J9811998-04-28028 April 1998 Part 21 Rept Re Incorrect Description of Drift Specification for Model 1154,gauge Pressure Transmitters,Range Code 0 in Manual Man 4514,Dec 1992.Cause Indeterminate.Will Issue & Include Errata Sheets in All Future Shipments to Users LD-97-031, Part 21 Rept Re Incorrect Nut & Washer Plate Matl for ECCS Suction Strainer Bolted Connections.Nut Plates & Washer Plates Fabricated from Incorrect Matl & Delivered to Peach Bottom Unit 3 Site.Nut & Washer Plates Never Installed1997-10-30030 October 1997 Part 21 Rept Re Incorrect Nut & Washer Plate Matl for ECCS Suction Strainer Bolted Connections.Nut Plates & Washer Plates Fabricated from Incorrect Matl & Delivered to Peach Bottom Unit 3 Site.Nut & Washer Plates Never Installed ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected ML17309A6211997-09-29029 September 1997 Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-0041997-08-14014 August 1997 Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 ML20149J8681997-07-22022 July 1997 Part 21 Rept Re Failure of Main Steam Header Radiation Monitors Supplied by Nuclear Research Corp.Caused by Defect in Installed Basic Component.Declared Monitors Inoperable & Implemented Alternate Preplanned Monitoring Method ML20149D3121997-07-14014 July 1997 Part 21 Draft Rept Re 970606 Failure of Main Steam Header Radiation Monitors Supplied by Nuclear Research Corp.Caused by Temperature Compensation.Detectors Declared Inoperable & Removed for Repair ML20140A4761997-05-27027 May 1997 Provides Addl Info to 970429 Part 21 Rept Re Potential safety-related Problem W/Asco HV 266000-007J Scram Solenoid Pilot Valves.Corrective Actions Also Listed LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns1997-01-17017 January 1997 Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns ML20133M2501997-01-15015 January 1997 Part 21 Rept Re Failures of GE Type AMH-4.76-250 Circuit Breakers.Caused by Bent Trip Lever.Replaced Trip Paddles, Support Bracket & Spring Discharge Link ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20134E8171996-10-25025 October 1996 Part 21 Rept Re Bent Manual Trip Paddles in GE Magne Blast 4-kV Circuit Breakers.Investigation Revealed No Gap Between Manual Trip Rod & Manual Trip Lever.Definitive Explanation for Breaker Failures Not Been Confirmed ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20112G9811996-05-29029 May 1996 Part 21 Rept Re Bechtel Job 21464 Calvert Cliffs Nuclear Power Plant DG Project.Plant Start Up Problem Rept 96-06M Addressed Oil Filter O-Rings,filter Element & Filter Holder ML20101L2051996-03-28028 March 1996 Followup to Part 21 Rept Re Failures of gould-shawmut Fuses. Initial Investigation Into Issue Revealed Certain Percentage of Fuses Developed Cracks in Fuse Elements ML20091P4271995-08-24024 August 1995 Final Part 21 Rept Re Regular Locknut Being Installed on Governor Where Thinner Locknut Required at Calvert Cliffs. Applications of Thick Nut P/N 75233A06 on Control Linkages Will Be Reviewed to Insure Applications Correct ML20086T1761995-07-19019 July 1995 Part 21 Rept Re Potential Problem W/Type 51's & 87T Relays. Potential Problem Identified as Defective Tap Block. Recommends That Users Identified on Attachment 1 Page Verify Testing Per Instruction Listed on Encl Product Advisory Ltr ML20083L0411995-05-0505 May 1995 Interim Part 21 Rept Re Failures of Gould-Shawmit A25X 10-15 Ampere Fuses Due to Cracking of Fuse Element.Util Not Yet Verified That Mfg Process Described Cause of Failures & Performing Own Metallurgical Analysis on Fuses ML20077M7581995-01-10010 January 1995 Part 21 Rept,Determined That Bechtel Power Corp Analysis of long-term Cooling Phase of LOCA Did Not Model Heat Transfer from RCS Metal Components to RCS Coolant.Util Asked C-E to Provide New Mass & Energy Transfer Data ML20078R2721994-12-14014 December 1994 Part 21 Rept Re Auxiliary Feedwater Pump Turbine Governor Valve Binding.Caused by Galvanic & Crevice Corrosion Between Stem & Stem Packing Components.Licensees Replaced Stem & Packing Gland Matls ML20078Q1641994-12-0909 December 1994 Part 21 Rept Re Result in Slight Increase in post-accident Containment Temp.Licensees Have No Current Operability Concerns Due to Low Ultimate Heat Sink Temps at Present Time ML20080A7681994-11-15015 November 1994 Part 21 Rept Re AFW Pump Turbine Governor Valve Binding Caused by Galvanic & Crevice Corrosion Between Stem & Stem Packaging Components.Turbine Mfg by Terry Steam Turbine Co. Licensee Plans to Periodically Exercise Valve Stems ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures ML20070K8111994-07-20020 July 1994 Interim Part 21 Rept Re OP 38TD8-1/8 CS Injection Pump Erosion Sleeve Cavitation,Reported by Bg&E.Vendor Pursuing Evaluation to Determine Whether Situation Could Potentially Affect All Nuclear Utils Who Operate Subj Sleeve ML20070M6451994-04-26026 April 1994 Part 21 Rept Re anti-rotation Keys for 6-inch MOVs Mfg by Velan.New Keys Machined on-site to Dimensional Requirements of New Drawings Supplied by Vendor Installed & Performed Satisfactorily ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058G5981993-11-17017 November 1993 Part 21 Rept Re Westronics Recorders,Model 2100C.Signal Input Transition Printed Circuit Board Assembly Redesigned to Improve Recorder Immunity to Electromagnetic Interference.List of Affected Recorders & Locations Encl ML20059L9861993-11-11011 November 1993 Part 21 Rept Re Deviation Wherein Fully Open Butterfly Valve Located 15 Pipe Diameters Upstream of Sensors Was Disturbing Flow Profile Enough to Cause Ultrasonic Meter to Indicate 3 to 4% Low.Customers Notified & Valve Removed ML20056E9751993-08-19019 August 1993 Provides Insp Results & Safety Analysis Re Operational Amplifiers Discussed in 920917 & 23 Ltrs as Potential Safety Issue.Concludes That There Are No Safety Concerns W/Respect to Buffer Amplier Module.Ltr Not 10CFR21 Notification ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 LD-93-019, Part 21 Rept Re Defect in Input to Better Axial Shape Selection Sys (Basss) Computer Code.Caused by Inconsistency Between Basss User Documentation & Code.Initially Determined on 930205.Correct Input Provided1993-02-12012 February 1993 Part 21 Rept Re Defect in Input to Better Axial Shape Selection Sys (Basss) Computer Code.Caused by Inconsistency Between Basss User Documentation & Code.Initially Determined on 930205.Correct Input Provided ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20116L5121992-10-0909 October 1992 Part 21 Rept Re safety-related RHR Pump Motor Fan Failure Due to Lack of Weld Penetration Between Fan Blades & Discs. New Duplicate GE Motors Mfg by GE Canada,Motors & Drive Dept.New Surplus Motors Have Double Fillet Welds ML20118B2191992-09-23023 September 1992 Suppl to Part 21 Rept Re Potential Deviation in Some Bailey Controls Co 88 Series Modules,Transmitted Via .One Module Found Incapable of Reaching 100% Output at Max Rated Load.Recommends That Circuit Board Assemblies Be Inspected ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20095J7981992-04-29029 April 1992 Part 21 Rept Re Failure of Anchor Darling Swing Check Valve to Move Freely Through Entire Range of Motion.Caused by Insufficient Clearance Between Swing Arm & Shaft Bushings. Valve Repaired Onsite by Vendor ML20090L8801992-03-18018 March 1992 Part 21 Re Cracked Piston Castings Received from Acme Foundry,Fairbanks Morse & General Casting.Magnetic Particle Insp of All Pistons Will Be Performed.List of Affected Plants Encl ML20077N5061991-08-0909 August 1991 Part 21 Rept Re Defective 3/8 inch,3-way Solenoid Valve Model Supplied by Automatic Switch Co.Cv Valves Will Be Specified on Future Purchase Order W/Actual Test Values Requested for Each Valve L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl1991-01-0404 January 1991 Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl ML17262A2621990-11-30030 November 1990 Part 21 Rept Re Chilled Water Sys.Initially Reported on 901030.Evaluation of Perry Plant Will Be Sent by 901230 ML20059M1751990-09-24024 September 1990 Supplemental Part 21 Rept 1 Re Defect in Coltec Industries, Inc Connecting Rod Assemblies Nuts/Bolts on Model 38TD8-1/8 Emergency Generators.Initially Reported on 851120.Nuts/bolts for Assemblies at Stated Plants Inspected & Replaced 1999-06-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217L8831999-10-21021 October 1999
[Table view]Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with 1999-09-30 |
Text
=
A Duon @ Muyd. rc 427 E. Stewart St., P.O. Box 2020, Milwaukee, WI 53201-2020 414-481-6000 TWX 910-262-3115 May 29, 1985 Dr. Thomas E. Murley U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
10CFR 21 - BG&E - Calvert Cliffs Generator Failure
Reference:
Telephone Notification 5/17/85 Letter to Dr. Murley dated 5/21/85
Dear Dr. Murley:
The nature of the casualty on the subject generator was a failure of the inner polar connector between the damper bar circuit on the generator main field.
At the present time the cause of this failure has not been defined and further investigation is necessary.
There are four sites that utilize generators of this type. They are as follows:
- 1. Vermont Yankee @ Vernon Station, Vernon, VI - 2 units
- 2. Philadelphia Electric, Peach Bottom 2 & 3 - 4 units
- 3. Baltimore Gas & Electric, Calvert Cliffs 1 & 2 - 3 units
- 4. Metropolitan Edison, Three Mile Island - 2 units Locations 2 and 4 were notified by others of the potentir 1 problem and have been in contact with Louis Allis for additional information. Location 1 above was notified by telephone on May 29, 1985 by the writer. The person contacted was Mr. Don Dyer, Operations Quality Coordinator.
At the present time Louis Allis engineering is reviewing the reports from the field in an effort to determine the cause of failure and will be forwarding that information to Fairbanks Morse / Colt Industries for their corrective action.
Sincerely, H. H. Leusink u Vice President, Engineering HHL:sd cc: Louis Allis Colt Industries E. H. Klessig M. Morlority, Manager Sales J. G. Borman B. Saylor, Vice President Quality Assurance A. B. Giesecke H. A. Schreiber 8506070269 850 PDR ADOCK 0 p ,7 g 5 lftp