GPU NUCLEAR CORPORATE Number
)
,g POLICY AND PROCEDURE MANUAL 1000-PLN-7200.01 NUCLEAR
Title:
GPU Nuclear Operational Quality Assurance Plan Revision No.
11 APPENDIX C - Part 2 NRC Regulatorv Guide 1.143. October 1979 l
Design Guidance for Radioactive Waste Manacement Systems. Structures and Components Installed in I icht-Water-Cooled Nuclear Power Plants Since the original design and construction of TMi-l and Oyster Creek was to different classification criteria than contained in this guide; GPU Nuclear will comply with the regulatory position of this guide with the following l
clariGeations:
1.
For modiGeation to existing plant systems, items will be classi6ed by Engineeringaccording to the original design basis or this guide. This classiGcation will not degrade the safety of the system being modined.
2.
Additions to existing plant systems will be made to the same code, standard and technical requirements which were originally applied to the system to which the addition is to be made or more recent versions of these codes, standards and technical requirements. The addition will not degrade the safety of the system being added to.
3.
For new construction,the latest applicable code will be utilized unless such utilization would result in hardship or unusual difHculty without providing an equivalent level of safety.
1 4.
Hose may be used in lieu of pipe where the connections are temporary. The anticipated applicationsof hose would normally be (1) connections to contractor owned skid mounted radioactive waste processing equipment,(2) connections to a nonmounted, frequently-changed component such as a burial liner /IllC or (3) connections to nonmounted pieces of radioactive waste processing or collection equipment which must be readily removable (e.g., items placed on equipment hatches). The pressure rating of such hoses and connections shall equal or exceed those of the system (s) or component (s) to w hich they are connected.
Prior to use, the hoses shall be hydrotested to the appropriate pressure for the system or component to which they are connected. After installation,they are to receive regular hydrotesting or in-service inspections.
A safety evaluation is required tojustify the use of such hose connections.
NRC Reculatorv Guide 1.144. January 1979 Auditine of Ouality Assurance Procrams for Nuclear Power Plants GPU Nuclearis in basic agreement with the position set forth in the Regulatory Guide subject to the following comments:
1.
Sections C.3.a(1)and C.3.a(2)
The frequency of performance and minimal topical coverage ofinternal audits will be consistent with l