Monthly Operating Rept for June 1998 for TMI-1
ML20236R220
Person / Time
Site: Crane 
Issue date: 06/30/1998
From: Heysek W, Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1920-98-20378, GL-97-02, GL-97-2, NUDOCS 9807210305
Download: ML20236R220 (3)


Text

- - _ _ _ - - - _ _ _ - _.

e

'e

{

GPU Nuclear. Inc.

(.

Route 441 South NUCLEAR Post Office Box 480 Middletown, PA 17057-0480 Tel 717 944-7621 July 14, 1998 l

1920-98-20378 U. S. Nuclear Regulatory Commission Attn: Document Control Desk

)

Washington, D.C. 20555 Gentlemen:

j

Subject:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for June 1998 Enclosed are two copies of the June 1998 Monthly Operating Report for Three Mile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this report is in accordance with the guidance provided by Generic Letter 97-02, i

l Sincerely,

/

'/

James W. Langenbach

/

Vice President and Director, TM1 WGH

. < :, : 7 l

N) U cc: Administrator, Region I - Hubert J. Miller TMI Senior Resident Inspector-Wayne L. Schmidt 98001 9907210305 990630 PDR ADOCK 05000289 R

PDR,

s APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-289 DATE July 14,1998 COMPLETED BY W. HEYSEK TELEPHONE (717 948-8191 3

REPORTING PERIOD: June 1998 YEAR TO MONTH DATE CUMULATIVE 1.

DESIGN ELECTRICAL RATING (MWe 819.0 NET).

He nominal net electrical output of the unit specified by the utility and used for the purpose ofplant design.

2.

MAXIMUM DEPENDABLE CAPACITY 786.0 (MWeNET).

The gross electrical output as measured at the output tenninals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.

3.

NUMBER OF HOURS REACTOR WAS 720.0 4,343.0 130,054.7 CRITICAL.

3 The total number of hours during the gross hours of I

the reporting period that the reactor was entical.

4.

HOURS GENERATOR ON LINE.

720.0 4,343.0 128,852.0 (Service Hours) The total number of hours during the I

gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours that the generator was on line l

plus the total outage hours in the reporting period.

l 5.

UNIT RESERVE SHUTDOWN HOURS.

0.0 0.0 0.0 He total number of hours during the gross hours of the reporting period that the unit was removed from i

service for economic or similar reasons but was available for operation.

6.

NET ELECTRICAL ENERGY (MWH).

5 2,408.0 1,503,365.0 100,565,799.1 The gross electrical output of the unit measured at the output tenninals of the turbine generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.

  • Design values have no " Year to Date" or " Cumulative" significance.

i 1

R E

E P

L Y

O E

R P

T T

H h

O I

e p

D N

N l

aa G

E a

e n

P E

7

(

t e

R 1

n I

7 e

O t

)

e h

D 9

r d

4 g

8 t

h 8E e

1 9

m ncFEECEAR 2 1

o oo#CRA " 5e n

mP "p

e s s

( D a

a a r g h c

Hw 1

e u e u

9 t

ear lmni a

o a e a

h a

wd r sg

)mo 9

o n

Ty 8

p u

e E

mR F

e a u e mg r

s d n a Tur R

a n

x I&s t

e e E

a s (E e

i a

t e

m x

m g

pl z

l a'

e a

p a

)

n a

m s

t s

a 1

g 0

r 0%

g,,,m g p po o

w r

e r

a n

d r

e ma i

ne 2

d a

t th a

t 3

4 l

0M1 me p

e M - h o

b a

w r mll d e

n a a u u e

(E e a r

ek x

l pl Sav e

e c v

a r n Qa e

m l

th r

o u

g h

t h

e p

c e

a n

d u.

o o

e N

ac f

n

=

t c

l c'

3 m

e o

n t

.h

+

l 1l