ML20202F812
| ML20202F812 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/31/1998 |
| From: | Heysek W, Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6L20-98-20064, NUDOCS 9802190306 | |
| Download: ML20202F812 (3) | |
Text
.
i 1
l GPt' N. ilear,Inc.
I A
PW
' 1 South NUCLEAR
"' '
- Bo# *t t o.5.an, PA IM10430 T<t ?17% 7621 February 10, 1998 6L20-98-20064 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 l
l Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for January 1998 Enclosed are two copies of the January 1998 Monthly Operating Report for Three Mile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
Sincerely, h&b L
J. W l angenbach I
Vice President and Director, TMI WGH
_,vur cc: Administrator, Region I TMI Senior Resident Inspector 97001 9802190304 080131 ~
11LllTll;llll,llll I!'!
- '*c PDR ADOC4 JS000289 R
.~ __.... _ _ _. _. _,. _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _. -... _ _. _ _... _
- j -,,
^'
APPENDIX A OPERATING DATA REPORT DOCKETNO. 50-289 DATE February 10, 1998 COMPLETED BY - W. HEYSEK TELEPHONE (717)948-8191 REPORTING PERIOD: JANUARY 1998' YEAR TO MONTH DATE CUMULATIVE k
n 1.
DESIGN ELECTRICAL RATING (MWe 819.0 t
. NET).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant
- design..
2.
MAXIMUM DEPENDABLE CAPACITY 786.0 (MWeNET).
The gross electrical output as measured at the output tenninals of the turbine generator during the most -
restrictive seasonal condit;ons min'is the normal station service kwlsi 3,
NUMBER OF HOURS i9. ACTOR WAS -
744.0 744.0 -
126,455.7 CRITICAL. _.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
- 4.
HOURS GENERATOR ON LINE.
744,0 744.0
= 125,253.0 (Service llours) Th: total number of hours during the gross hours of the reporting period that the unit
- t operated with the breakers closed to the station bus.
The sum of the hours that the generator was on line plus the total oatage hours in the reporting period.
5.
- UrIT RESERVE SHUTDOWN HOURS.
0.0 0,0 0.0 '-
The total number of hours during the gross hours of
. the reporting period that the unit was removed frc service for economic or similar reasons but was available for operation, 6l
. NET ELECTRICAL ENERGY (MWH).
612,403.0 612,403.0 97,674,837.1 The gross electrical output of the unit measured at
- the output tenninals of the turbine generator minus the normal station service loads during the gross
' hours of the reporting period, expressed in megawatt hours. Negative quantities trauld not be used.
Design values have no " Year to Date" or " Cumulative" significance.
5 4,yav.,.-
,._,-._..y
.. _ _ ~. -
y
t 1
}
APPENDIX B UNIT SHUTDOWNS a
j DOCKET NO. 50-289 j
DATE February 10, 1998
'.l ~
COMPLETED Bf W. HEYSEK j
TELEPHONE (717)948-8191 l
REPORTING PERIOD: JANUARY 1998 we-Cams AConsdwe 3
Eluansg A61wn se
]:
rom.
Tn-I n-am m*
}
N) e
- ,a 1
1 None b
4 I
i i
e i
I 2
3 er a w
u.awa S L* w AETW Faskse gspisse
. 144anual W--as Tsus 244anuas samme
]
C ad-teg SA-Saman
..,.a.,,. _
.m. axp.,,o i
zwT A-m-
%r w.
mm. m
- SUNNARY:The plant entered the month operating at 100% power and remained at that power level through the end of the month.
4 l
2 e
1 1
'N-
- s
&+-
1
=4+
s-y-*md'-
yg 1-vra-+
c w*-+-
e m
w a-w.
tm--
m-
-T*
e r>
r
-