GPU Nuclear,Inc.

(.

Route 441 South NUCLEAR Post Office Box 480 Middletown. PA 17057-0480 Tel 717 944 7621 October 09, 1998 1920-98-20547 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen;

Subject:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for September 1998 Enclosed are two copies of the September 1998 Monthly Operating Report for Three Mile Island Nuclear Station, Unit 1. The content and format ofinformation submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

Sincerely,

/

d

//

aou I

ames W. Langenbac Vice President and Director, TMI WGH cc: Administrator, Region 1 - Hubert J. Miller TMI Senior Resident inspector - Wayne L. Schmidt 98001

  • "92

,?

9810190350 980930 PDR ADOCK 05000289 R

PDR;

e'

,t APPENDIX A OPERATING DATA REPORT 4

DOCKET NO. 50-289 DATE October 09, 1998 COMPLETED BY-W. HEYSEK TELEPHONE (717) 948-8191 REPORTING PERIOD: September 1998 YEAR TO MONTH

'DATE CUMULATIVE 1.

DESIGN ELECTRICAL RATING (MWe 819.0 NET).

De nominal' net electrical output of the unit specified

-i

. by the utility and used for the purpose of plant design.

2.

MAXIMUM DEPENDABLE CAPACITY 786.0 1

I (MWeNET).

ne gross electrical output as measured at the output ternunals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.

3.

NUMBER OF HOURS REACTOR WAS 720.0 6,551.0 132,262.7 i

CRITICAL.'

The total number of hours during the gross hours of i

the reporting period that the reactor was' critical, j

4.

HOURS GENERATOR ON LINE.

720.0 6,551.0 131,060.0 (Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours that the generator was on line plus the total e age hoursin the reporting period.

5.

UNIT RESERVE SHUTDOWN HOURS.

0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6.

NET ELECTRICAL ENERGY (MWH).

575,480.0 5,257,444.0 102,319,878.1 The gross electrical output of the unit measured at the output termmals of the turbine generator minus j

the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.

'1

  • Design values have no " Year to Date" or " Cumulative" significance.

I' 1

l l

APPENDIX B -

UNIT SHUTDOWNS -

DOCKET NO.' 50-289 -

~ DAlli October 09. 1998-COMPLETED BY W. HEYSEK -

TELEPHONE (717)948-8191 REPORTING PERIOD: ' September 1998 Mathed of Cause & Carrecove Date type

Okiural g,,,,,a.

'None i

I 2

-3 F Fasced Reasari Method 5-A7

- Fashre Exphs0

' s-Manuel B'-

or Test -

24eanual Scrusa C-RcW LAnacunaam Scrasa

> Red.noryR =non

+oei-(re EOperment Trasug &Imensung ?

F-A ^

co====lEnw(Exphm0 r

. Hother(Explasn)

SUMMARY

The plant entered the month operating at 100% power and remained at that power level through the end of the month.

2 i

=

.m c

--