ML19250C100

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Failure of Stems on Core Flood Valves CF-V-1A & CF-V-1B Equipped W/Limitorque SMB-4 Operators. Diameter of Stem Caused Thread to Be Tapered.Stem Nut Would Bind & Prevent Further Opening by Hand Operation
ML19250C100
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/18/1973
From: John Miller
METROPOLITAN EDISON CO.
To:
Shared Package
ML19250C101 List:
References
NUDOCS 7911070656
Download: ML19250C100 (2)


Text

4 b

15f6 9

U S DISTRIBUTION:

  • [h' Docket Files ELicitra 11 DVassallo

,J,,

SVarga OCT 2 31979 OParr v

MRushbrook

)

LWR #3 File p l SLewis I

Docket Nos.:

STN 50-483 DMuller

'-l STN 50-485 WRegan hp RBallard RFroelich NSIC 7,

MEMORANDUM FOR:

Steve Scott, Chief Distribution Services Branch

[.

Division of Technical Information & Document Control M

l L

i FROM:

Olan D. Parr,' Chief N

Light Water Reactor:;, Branch No. 3

{-

Division of Project Management il

SUBJECT:

CALLAWAY FSAR ADDENDUM AND ER 9.t g~

The Callaway FSAR Addendum and ER were tendered on October 19, 1979.

2 Decause NRR resources have been diverted to higher priority tasks involving n

TMI-2, we will not be able to initiate an acceptance review.

Therefore, i t p

is requested that you place these documents in storage until I notify you q

that we are ready to perfom the acceptance review.

Please send a copy of the Callaway FSAR Addendum to the licensing project manager (Emanuel A.

id Licitra, Mail _ Stop 123) and a copy of the ER to the environment project manager (Richard W. Froelich, Mail Stop P-530).

Also send copies of these

?

documents to the NRC PDR, and the local PDRs (St. Louis and Fulton, Missouri).

l l

Olan D. Parr, C':f e r Light Water Reactors, Branch No. 3 Division of Project Management t

838 048 r

t u

b k

As)

AO)

._DPh.h.

.DSE: [,,

,.DP,gy,_#3.

.mes

  • EAli,ci tra :mec

,RLBall art,,,

,,,,0_D,Pa_r r_

]

0/,,h.),,/,? 9 9

i cats >

f.

ac mm m

<,.76> rnine an, QJ.i.

- - +

7 91107-i)4 5C

.