Responds to IE Bulletins79-06A & 79-06A,Revision 1, Review of Operational Errors & Sys Misalignments During TMI Incident. Provides Addl Info Re Emergency Procedures for LOCA & Operator Actions to Maintain Natural Circulation
ML19259D704
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/15/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7910260267
Download: ML19259D704 (6)


Text

~

~

\ ' Nh\est4RC REGj VtmonwrA Er,mernac Ann Powna CoxPANY

,, u ' c.. E -

Bronwoxn,VraorwrA asser hk8b.

October 15, 1979

, MAM .,1 " 1 I 9 0 rI 18 All : 00

/ $

.h h 4- g -u.';

gy~

Mr. Harold R. Denton, Director Serial No. 709A gg%n-i

- 16 Office of Nuclear Reactor Pep,ulation P0/PKl:baw b6 DM'.

Attn: Mr. O. D. Parr, Chief Docket Nos: 50.-338 Light Water Reactors Branch !;o. 3 $0-339 Division of Project Managettent License ITos: ??PP-4 U. S. Nucicar Regulatory Coenission CPPR-78 Washington, D. C. 20555

Dear Mr. Denton:

This is in response to your letter of Aur,ust 23,1979, " Request for Additional Infornation Regarding IE Bulletin 79-06A and 79-06A, Revision 1". Cur response for !! orth Anna Power Station t' nit Nos. I and 2 is attached.

Very truly yours, C. M. Stal ngs Vice President-Power Supply and Production Operations cc: Mr. Ja'ws P. O'Reilly P00ROREM 4

. 9;x, W

, . ._i xRL: .n%

d??[-ll.. m g 4

9 29 12\2

'19083A

' ELCIALCGPj9 7910269 2/7

ll Additional Information In Responses Jo- '

Bulletins 79-06Aand79-06A(Revis' ion 1):

North Anna Power Station, Unit 1 Docket No: 50-338

2. A chart with a saturation curve and a 50* subcooling curve has been placed in the Control Room. Training has been carried out and documented on natural circulation mode of operation. An engineering review has been initiated to determine a mechanism which will warn the operator that he is losing his margin to saturation and will provide him with the ability to trend this information. This is in accordance with the response for Section 2.1.3.b of NUREG-0578.

The following instrumentation is available to the operator for recog-nition of undesirable void fonnation and to determine the success of natural circulation in cooling the core in the event that total forced Reactor Coolant flow has been lost:

Wide Range Reactor Coolant System Pressure Wide Range RTO - hot legs OD 3 3l Wide Range RTD - cold legs Pressurizer Level l J g,f -

Pressurizer Pressure Incore Thermocouples High Head Safety Injection Flow Auxiliary Feedwater Flow Emergency Conden:. ate Storage Tank Level Steamline Pressure Steam Generator Narrow Range Level Steam Generator Wide Range Level Source Range NIS We are presently changing our emergency procedure on Loss of Reactor Coolant Flow to provide the operator with the indication and actions to be taken to establish and maintain natural circulation in the event that total forced Reactor Coolant Flow has been lost.

Emergency procedures dealing with a LOCA, loss of secoadary coolant and deteriorating pressure conditions were changed on May 4 1979 to incorporate mandatory Reactor Coolant Pump operation as per response, to IE Bulletin 79-06A and the r avision 1 of IE Bulletin 79-06A. These same procedures were changed to incorporate July 26, 1979. mandatory Reactor Coolant Pump Tripping as per IE Bulletin 79-06C The emergency procedure for Loss of Reactor Coolant Flow will instruct the operator to maintain at least one steam generator level in the narrow range, pressurizer level >50%, primary pressure saturation point at least 50*F greater than the highest wide range loop temperature or core exit temperature. This procedure will instruct the operator on methods to be used in feeding and bleeding steam generators and instruments to be used to verify that natural circulation is working. These instructions are consistent with Westinghouse reconnendations.

These instructions that enhance natural circulation will minimize void fonnation.

Procedures involved will be revised on or about December 1,1979.

c 1,11,a2 =]-

w 1212 230

' age 2

8. Wlve lineups on Safety Talated systes are empleted after every
  • refuelirg. Incked valves on Jafety Relat4 Systens are verified and documented with respect to t teir proper position. Safety Related valves that have position irtlicati >n in the Control Roan are to be verified to be in their proper posi ions on a shift turnover check list which will be irrplanented in ac .ordance with NUREG-0578 Sect ion 2.2.1.c.

Tne controllirg urd e startup procedure already requires valve checkoff lists be cmp 1 ated.

9. Systens which ar s designed to transfer potentially radioactive fluids fran containnent are listed below:

A. Reactor C/ olant Pmp Seal Water Return

1. No P .gh radiation interlocks I, l
2. Rec elves Contairment Isolation Phase A
3. Te ted operable per T.S. 4.6.3.1.2.a
3. Reac >r Coolant Letdown
1. So high radiation interlocks
2. Receives Containnent Isclation Phase A 3 Tested operable per T.S. 4.6.3.1.2.a C. rimary Drains Transfer Tank Pucp Discharge
1. No high radiation interlocks
2. Receives Contairment Isolation Phase A
3. Tested operable per T.S. 4.6.3. 1.2.a D. Contairment Smp Turp Discharge
1. No high radiation interlocks
2. Receives Contairment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a E. Steam Generator Blowdown
1. No high radiation interlocks
2. Receives Contairment Isolation Phase A arri Phase B
1. Tested operable per T.S. 4. t.3.1.2.a arri T.S. 4.6.3.1.2.b F. Contairment Particulate arri Gaseous Radiation Monitor Supply
1. No high radiation interlocks
2. Receives Contairment Isolation Phase A'
3. Tested operable per T.S. 4.6.3.1.2.a G. Prirmry Vent Header
1. No high radiation interlocks
2. Receives Contairment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a H. SI Accmulator Vent 1
1. No high radiation intereks }2}2 23}
2. Receives Contairment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a

.u3c s I. Pressurizer Relief Tank Sample

. 1. No high radiation interlocks

2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a J. Pressurizer Liquid Space and Vapor Space Samples
1. Has high radiation interlocks
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a K. Primary Coolant Hot Leg and Cold Leg Samples
1. No high radiation interlocks
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a L. Containment Leakage Monitoring Lines
1. No high radiation interlocks
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a M. Containment Vacuum Pump Line
1. High radiation interlocks exist
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a (C.I. Phase A) and E.T.S. 2.2.4.d (high radiation)

N. Residual Heat Renoval Sample

1. No high radiation interlocks
2. Receives Cantainment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a
0. S. I. Accumulator Test Lines
1. No high radiation interlocks
2. Receive.t Containment Isolation Phase A
3. Tested operable ?er T.S. 4.6.3.1.2.a P. Steam Generator Surface Sample
1. No high radiation interlocks
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.c Q. Main Steam Drains
1. No high radiation interlocks
2. Receives Containment Isolation Phase A
3. Tested operable per T.S. 4.6.3.1.2.a R. Component Cooling Water from Components in Containment
1. No high radiation interlocks
2. Receives Containment Isolation Phase B
3. Tested operable per T.S. 4.6.3.1.2.b.

1212 232

Page 4 S. Containment Pu n e and Exhaust

1. High radiation interlocks exist
2. No Containment Isolation signal
3. Tested operable per T.S. 4.6.3.1.2.c.

NOTE: North Anna is a sub-atmospheric containment design; therefore, the purge and exhaust lines are isolated in T.S. Modes 1, 2, 3, and 4. Radiation interlocks are provided primarily for mitigation of fuel handling accidents in containment.

The following systems have manual valves under administrative control for containment isolation and could carry radioactive fluid from containment.

RHR to RWST Post-Accident Hydrogen Recombiner Primary Vent Pat Containment Air Ejector Suction The following systems have remote manual valves for containment isolation and could carry radioactive fluid from containment:

Recire Spray Pump Suction Low Head SI Pump Suction Service Water from Recirc Spray Heat Exchangers Centainment Air Ejector Suction RHR Sample Lines Note that the above manual and remote manual valves do not have any interlocks for radiation monitoring and containment isolation. The manual valves are nomally shut and non-essential remote manual valves are nomally shut. Remote manual valves needed for ESF functions would be open in the event of ESF system operation.

10. Technical Specifications dictate the surveillance requirements that must be completed to prove the operability of a safety related system. Technical Specifications requirements are met by periodic testsand logs. Maintenance operating procedures will remove a subsystem / equipment from service for pre-ventative or corrective maintenance. When a subsystem is removed from service or fails, it is entered in an Action Statement log to ensure that the require-ments of Technical Specifications are met. After maintenance is complete, the controlling procedure insures that operability is determined by testing.

Maintenance operating procedures will test the redundant subsystem / train before removal of a portion of the other subsystem / train if it does not isolate e it from performing its safety function while testing.

For subsystems that are made inoperable for testing, the redundant train of the system to be removed from service is verified not to be in an Action Statement, has passed its last scheduled periodic test, is visually inspected, and its power supply is operable and not in action statement. These steps are

, taken and signed off in the maintenance operating proceduie before the system is removed from service.

1212 233

- - Page 5 Operability of a redundant emergency diesel is tested by the maintenance operation procedure in accordance with Technical Specifications. The proce-dures will verify that safety related systems powered from the redundant diesel are operable by review rf the Action Statement Log.

A detailed review of Periodic Tests will be conducted and completed by 11-1-79. This review is intended to cover system operability determination when returned to service following testing. This review will also identify equipment which will be made inoperable for testing purposes.

Transferring of infonnation about the status of safety related systems at shift change will be in accordance with the response to NUREG-0578, section 2.2.1.c.

11. A bakelite sign has been placed within view of the Shift Supervisor's desk stating the reporting requirements to the NRC for IEB 79-06A. The appro-priate Administrative procedure was changed to reflect the reporting require-ments af IE3 79-06A on 4/30/79.
12. Hydrogen can be purged from the Primary Coolant System by the following methods (by existing procedures):

A. Volume Control tank operation lowers the hydrogen concentration of the letdown before it is charged bac; into the primary system by purging Se Volume Control tank and wintaining a low gas space pressure.

B. Sampling system allows purging hydrogen gas from the pressurizer vapor space to the Volume Control Tank or directly to the gas stripper.

C. Sampling system allows purging hydrogen gas from the pressurizer relief tank to the Volume Control Tank or to the gas stripper.

D. Degassing the primary system utilizes the gas stripper.

E. Degassing the primary system utilizes the gas stripper while cimultaneously purging the VCT gas space with nitrogen.

F. Annunciator Response Procedure provides direction to Pressurizer Relief tank high pressure. Reduces pressure in the pressurizer relief tank by venting it to the gas stri'pper.

G. Unit Shutdown procedure cycles power operated relief valves to vent the pressurizer to the pressurizer relief tank.

H. Gaseous Waste Disposal procedure provides the operating instruc-tions to reduce Hydrogen gas in the gas stripper overhead gas surge tank by the use of the Catalytic Recombiner.

13. One change to the Technical Specifications is required to implement two of the three low-low Pressurizer Pressure Safety Injection actuation. This request will be submitted by 12-31-75, for Unit 1. It is anticipated that the Unit 2 T.S. will be issued with the two of three low-low pressure Pressurizer Pressure actuation as an LCO.