UNION ELECTRIC COMPANY seos onArior eTncer ST. Louis. MissOURO s o. . .m "7:;*ttf,"1.**

...so...-,..........

January 10, 1980 h

Mr. William H. Lovelace s Chief, Plans Branch /

FriBB-12177 /b '

U. S. Nuclear Regulatory Commission UniRC-333 Washington, D. C. 20555 [8

Dear Mr. Lovelace:

CONSTRUCTION STATUS REPORT CALIAWAY UNITS 1 AND 2 The PWR Construction Milestone and Activity Reports for Callaway Units 1 and 2 have been revised for a status date of January 1,1980. All dates and completion status shown in our previous submittal, (UUTRC-323) dated September 12, 1979 remain unchanged, except for those indicated with a double asterisk (**).

Construction of Unit 1 is approximately 58.07 complete. With reference to Unit 2, only the status date has changed. Construction of this unit remains 0.77. complete.

This letter constitutes our report to be filed by January 14, 1980 Very truly yours,

/. , 3

, , -John /K. Bryan Y

FLK/vs Attachments : Construction Status Report - Unit #1 Construction Status Report - Unit #2 PWR Construction Milestone - Unit #1 g1A7 II4i jg9 PWR Construction Milestone - Unit #2 cc: Mr. E. R. Schweibinz Mr. E. K. Dille sc lll 8001150 [ d

/

UNION ELECTRIC COMPANY CONSTRUCTION STATUS REPORT CALLAWAY UNIT 1 Callaway Unit 1 1-J Numbers Item Current Status 0-7805 Install control room consoles 8% Complete 0-7405 Install conduit and cable trays 55% Complete 0-7820 Nuclear instrumentation and 07/01/80 Forecast Start Calibration 0-7410 Install primary auxiliary 20% Complete switchgear 0-7415 Install cables (instru- 12% Complete mentation, control and power 0-7420 Install motor control centere 29% Complete (MCC's) and secondary distri-bution system 0-7425 Install batteries and inverter 43% Complete 0-7435 Install process instruments 6% Complete 0-7440 Process control and logic 06/01/80 Forecast Start instrumentation calibration 06/01/81 Forecast Complete 7155-7445 Install diesel generator and 83% Complete tanks 03/01/80 Forecast Complete 7070-7130 Tendon sheath installation 96% Complete 7310-7455 Install CRDM 1% Complete 7205-7510 Install piping hangers 39% Complete and restraints 7060-7150 Install containment liner & 89% Complete structures 03/28/80 Forecast Complete 7200-7300 Install RPV 01/26/81 Forecast Complete 7300-7450 Install primary pressure 45% Complete boundary piping and all piping connected to primary system components.

7210-7260 Install primary pumps 42% Complete 7080-7170 Containment penetrations 53% Complete 12/11/81 Forecast Complete 7055-7085 Install containment concrete 84% Complete 7225-7275 Install Steam Generator 66% Complete 05/26/80 Forecast Complete

UNION ELECTRIC COMPANY CONSTRUCTION STATUS REPORT CALLAWAY UNIT 1 Callaway Unit 1 I-J Numbers Item Current Status 7090-7105 Containment cooling and 10% Complete containment spray (i.e. ice condenser, etc.)

0-7560 DC system inverter test 06/01/80 Forecast Start 0-7360 Install main steam line 62% Complete between MSIV and turbine 7360-7365 Install main steamline between 25% Complete MSIV & Steam Generator 0-7280 Install feedwater system 62% Complete 0-7570 Battery capacity test 09/15/80 Forecast Start 7245-7325 Instc!1 make-up system (CVCS) 76% Complete 7025-7230 Install auxiliary building 88% Complete foundation and structures 7230-7335 Install RHR heat system 63% Complete 7255-7340 Install safety injection system 22% Complete 7125-7350 Install primary component cooling 59% Complete water system 0-7315 Install refuel water storage 05/01/80 Forecast Start tanks 09/01/80 Forecast Complete 0-7590 Containment isolation test 06/15/80 Forecast Start 03/15/81 Forecast Complete 7115-7470 Install fuel pool and associated 14% Complete (activity redefined) equipment 11/26/80 Forecast Complete 7035-7235 Construct turbine generator 100% Complete foundation 7040-7110 Construct radioactive waste 69% Complete building 06/01/80 Forecast Complete 7110-7505 Radioactive waste system & 52% Complete radiation monitoring system 10/01/79 Start 7045-7890 Install secondary heat sinks 56% Complete (cooling towers, reservoirs and dams, etc).

1747 201

UNION ELECTRIC COMPANY CONSTRUCTION STATUS REPORT CALLAWAY UNIT 2 Callaway Unit 2 I-J Numbers Item Current Status NO CHANGE 1747 202

PWR CONSTRUCTION MILESTONES AND ACTIVITIES TAB C FOR CALLAWAY UNIT 1 Docket No. STN-50483 Status Date 1/01/80 I-J DATE  % I-J DATE  %

NUMBERS START COMP. COMP. I NUMBERS START COMP. COMP.

0 7805 11/15/79 03/13/80 8%** l 7623 7625 07/01/81 10/01/81 0 7810 03/01/76 03/01/78 1 0 7460 07/20/80 07/01/81 0 7520 11/01/79 12/01/80 1 7638 7640 07/01/81 10/01/81 0 7730 12/01/81 12/15/81 1 7075 7095 08/01/78 05/25/79 100%

7730 7815 12/15/81 03/15/82 l 7215 7265 12/15/78 06/01/80 50%

0 7405 08/08/77 12/01/80 55%** l 0 7535 07/06/80 07/01/81 0 7820 07/01/80**01/01/82 l 7643 7645 07/01/81 10/01/81 0 7410 06/15/79 12/01/80 20%** l 7080 7170 08/01/78 12/11/81** 53%**

O 7415 09/01/79 06/01/81 12%** l 7220 7270 03/20/79 07/15/79 99%

0 7420 05/07/78 12/01/80 29%** l 0 7540 08/10/80 07/01/81 0 7475 01/01/80 12/01/81 l 7648 7650 07/01/81 10/01/81 0 7735 07/01/81 10/01/81 1 0 7545 09/07/80 07/01/81 0 7425 06/20/79 03/15/80 43%** l 7658 7660 07/01/81 10/01/81 0 7740 07/01/81 10/01/81 1 7055 7085 04/11/77 06/01/80 84%**

0 7430 12/01/77 12/01/80 64% l 7225 7275 05/28/79 05/26/80** 66%**

O 7745 07/01/81 10/01/81 1 0 7465 05/01/81 07/01/81 0 7435 09/01/79 08/10/81 6%** l 7663 7665 07/01/81 10/01/81 0 7750 07/01/81 10/01/81 l 7090 7105 09/01/77 10/12/80 10%**

O 7440 06/01/80**06/01/81** l 7105 7680 10/12/80 07/01/81 0 7755 07/01/81 10/01/81 l 7633 7635 07/01/81 10/01/81 7020 7155 11/21/76 05/27/77 100% l 0 7560 06/01/80**07/01/81 7155 7445 05/27/77 03/01/80** 83%** I 7653 7655 07/01/81 10/01/81 7070 7130 07/25/77 01/01/80 96%** l O 7360 08/01/78 02/10/80 62%**

7130 7370 08/01/80 09/28/80 1 7360 7365 03/20/79 01/01/80 25%**

7370 7595 09/28/80 07/01/81 l 0 7565 12/01/80 07/01/81 7305 7825 03/01/79 12/01/80 11% 1 0 7280 04/01/78 05/04/80 62%**

7310 7455 10/01/79 10/01/81 1%** l 0 7570 09/15/80**07/01/81 7205 7510 09/01/78 10/01/80 39%** l 7245 7325 11/15/77 05/25/80 76%**

  • O 7005 09/03/75 03/01/76 100% 1 0 7575 01/27/80 07/01/81
  • 7005 7015 03/01/76 05/09/76 100%  ! 7025 7230 05/23/76 02/01/80 88%**
  • 7015 7050 05/09/76 12/21/76 100% l 7230 7335 12/01/77 06/01/80 63%**
  • 7050 7060 12/22/76 04/06/77 100% l 0 7675 01/20/80 07/01/81
  • 7060 7150 04/11/77 03/28/80** 89%** I 7255 7340 12/01/77 06/22/80 22%**
  • 7150 7160 11/15/77 06/01/79 100%  ! 0 7685 07/06/80 07/01/81
  • 7160 7200 12/04/78 03/06/79 100% l 7125 7350 12/01/77 03/09/80 59%**
  • 7200 7300 02/20/79 01/26/81** 93% l 0 7670 12/01/80 06/15/81
  • 7300 7450 06/01/79 09/15/80 45%** l 0 7315 05/01/80**09/01/80**
  • 7450 7500 03/28/80 10/01/81 1 0 7590 06/15/80**03/15/81**
  • 7500 7515 10/01/81 11/15/81 1 7030 7345 06/20/77 04/15/80 88%
  • 7515 7600 11/15/81 01/01/82 1 0 7690 12/09/79 06/08/80
  • 7600 7700 01/01/82 02/15/82 7115 7470 02/28/78 11/26/80** 14%**
  • 7700 7800 02/15/82 03/15/82 7035 72a3 08/30/76 11/01/79 100%**
  • 7800 7950 03/15/82 04/01/82 1 7235 7240 11/04/77 09/28/80 64%
  • 7950 7990 04/01/82 10/01/82 1 7240 7355 01/01/79 10/01/81 48%

0 7525 08/17/80 07/01/81 l 7040 7110 10/28/76 06/01/80** 69%**

7628 7630 07/01/81 10/01/81 l 7110 7505 10/01/79**10/01/80 52%**

7163 7165 10/03/77 01/15/79 100% l 7505 7895 04/20/80 10/01/81 7210 7260 06/15/79 09/15/80 42%** I 7045 7890 08/15/77 03/01/80 56%**

0 7530 07/27/80 07/01/81 I

  • Indicates Major Milestones
    • Changes Made Since 8/28/79

,, . PWR CONSTRUCTION MILESTONES AND ACTIVITIES TAB C FOR CALLAWAY UNIT 2 Docket No. SRN-50483 Status Date 1/01/80 I-J DATE  % I-J DATE  %

NUMBERS START COMP. COMP. l NUMBERS START COMP. COMP.

0 7805 04/26/83 07/06/84 1 7623 7625 07/01/86 10/01 86 0 7810 05/01/81 05/01/83 1 0 7460 07/25/85 07/01/86 0 7520 05/01/84 04/01/86 l 7638 7640 07/01/86 10/01/86 0 7730 06/15/86 07/01/86 1 7075 7095 07/01/82 08/04/83 7730 7815 07/01/86 10/01/86 1 7215 7265 11/25/82 12/28/83 0 7405 02/21/82 04/01/86 1 0 7535 07/11/84 07/01/85 0 7820 07/13/84 10/01/86 1 7643 7645 07/01/86 10/01/86 0 7410 03/02/82 04/01/86 l 7080 7170 02/19/82 08/04/83 0 7415 12/28/82 04/01/86 1 7220 7270 06/30/83 07/14/83 0 7420 03/02/82 04/01/86 l 0 7540 08/15/85 07/01/86 0 7475 12/28/82 04/01/86 1 7648 7650 07/01/86 10/01/86 0 7735 07/01/86 10/01/86 1 0 7545 11/07/85 07/01/86 0 7425 04/04/84 04/01/86 l 7658 7660 07/01/86 10/01/86 0 7740 07/01/86 10/01/86 1 7055 7085 02/19/82 12/23/82 0 7430 02/28/82 04/01/86 1 7225 7275 06/30/83 08/18/83 0 7745 07/01/86 10/01/86 1 0 7465 05/09/85 07/01/86 0 7435 10/01/82 04/01/86 l 7663 7665 07/01/86 10/01/86 0 7750 07/01/86 10/01/86 i 7090 7105 08/12/83 12/12/85 0 7440 10/01/82 04/01/86 1 7105 7680 12/12/85 07/01/86 0 7755 07/01/86 10/01/86 l 7633 7635 07/01/86 10/01/86 7020 7155 02/21/82 11/04/82 1 0 7560 10/19/84 07/01/86 7155 7445 07/01/81 07/06/84 1 7653 7655 07/01/86 10/01/86 7070 7130 04/20/82 06/15/84 1 0 7360 08/26/82 04/10/84 7130 7370 09/29/84 11/28/86 1 7360 7365 06/30/83 11/16/84 7370 7595 11/28/85 07/01/86 l 0 7565 02/01/86 07/01/86 7305 7825 05/09/85 10/17/85 1 0 7280 12/10/83 07/01/85 7310 7455 05/01/83 04/01/86 1 0 7570 10/26/84 07/01/85 7205 7510 12/02/82 05/15/86 l 7245 7325 01/28/82 07/25/84

  • 0 7005 09/03/75 03/01/76 100% 1 0 7575 02/02/85 07/01/86
  • 7005 7015 03/01/76 06/15/80 90% i 7025 7230 07/07/81 01/28/82
  • 7015 7050 07/09/81 12/17/81 1 7230 7335 11/28/82 08/01/85
  • 7050 7060 12/17/81 02/19/82 1 0 7675 01/25/85 07/01/86
  • 7060 7150 02/19/82 09/17/82 l 7255 7340 01/28/82 08/22/85
  • 7150 7160 09/17/82 01/13/83 1 0 7685 09/06/85 07/01/86
  • 7160 7200 01/13/83 06/16/83 1 7125 7350 01/28/82 05/09/85
  • 7200 7300 07/14/83 08/04/83 1 0 7670 02/01/86 06/15/86
  • 7300 7450 08/04/83 12/14/84 1 0 7315 11/10/83 11/30/84
  • 7450 7500 12/14/84 01/18/85 1 0 7590 02/09/85 08/08/85
  • 7500 7515 04/01/86 05/15/86 l 7030 7345 01/01/82 06/15/85
  • 7515 7600 05/15/86 07/01/86 1 0 7690 02/09/85 08/08/85
  • 7600 7700 07/01/86 10/01/86 1 7115 7470 06/30/83 12/21/84
  • 7700 7800 06/15/86 07/01/86 1 7035 7235 03/09/82 05/19/83
  • 7800 7950 07/01/86 10/01/86 1 7235 7240 05/18/82 11/28/85
  • 7950 7990 10/01/86 04/01/87 1 7240 7355 08/26/82 09/06/85 0 7525 08/22/85 07/01/86 l 7040 7110 12/11/81 04/13/82 7628 7630 07/01/86 10/01/86 1 7110 7505 04/12/82 06/20/85 7163 7165 09/17/82 08/04/83 i 7505 7895 06/20/85 10/01/86 7210 7260 06/16/83 06/30/83 1 7045 7890 08/15/78 11/18/84 5%

0 7530 08/01/85 07/01/86 l

  • Indicates Major Milestones 1747 204
    • Changes Made Since 8/28/79