ML19324C429
| ML19324C429 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/07/1989 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-88-010, IEB-88-10, ULNRC-2101, NUDOCS 8911160313 | |
| Download: ML19324C429 (4) | |
Text
I7 l
- 190t Grctiot Strect Post 0tfoce Bis 149 e
St. lova. Missouri 63166 y
314 554-2650 I
UVION N vember 7, 1989 canalu. u nen i
Ete6rnic tc" ^""'-
$33 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station PI-137 Washington, D.C.
20555 Gentlsmen:
ULNRC-2101 v
DOCKET NUMBER 50-483' CALLAWAY PLANT NONCONFORMING MOLDED-CASE CIRCUIT BREAKERS
References:
1)
NRC Bulletin No. 88-10, dated November 22, 1988 2)
ULNRC-1959, dated i
March 31, 1989 3)
NRC Bulletin No. 88-10,
~
Supplement 1, dated 1
August 3, 1989 l
Reference 1 required licensees to identify and trace to the circuit breaker manufacturer (CBM),.all i
molded-case circuit breakers (MCCBs) stored for use in C
safety-related applications.
Union Electric provided the results of this review to the NRC as Reference 2.
Based on a preliminary review of responses to Bulletin 88-10, the MRO staff issued Referenco 3 which requested licensees to:
1.
Review written reports submitted to the NRC i
in accordance with Bulletin 88-10 and verify that the, responses meet the hulletin l
provisions as clarified by the bulletin supplement, and; 2.
Prepare and retain documentation for possible audit that indicates that the l
review has been performed as requested.
Union Electric has reviewed the Bulletin 88-10 response (Reference 2) against the clarifications a
contained in the bulletin supplement.
As a result the review of breaker traceability was expanded to include original spares purchased under the construction program which were received after August 1, 1983.
The j
traceability of all safety-related MCCBs stored at i
l 1
-ge/
8911160313 891107
~
J PDR ADOCK 05000403 I$
]
a mwn n
~.
e*
Callaway Plant as of September 1, 1989.was established to a Certificate of Conformance (C of C) to e.ither the CBM or a 10CFR50, Appendix B qualified supplier.
Surveillances were performed to estaolish traceability to the CBM in cases'where the C of C was tracecble to the qualified supplier.
i i
Therefore, Union Electric has reviewed the j!
bulletin supplement and verified that the bulletin I
provisions as clarified by the supplement have been l
met as described in this letter =and in Reference 2.
(
Documentation associated with this review is being l
maintained at Callaway Plant and is available for review by the NRC staff.
If you have any questions concerning this letter, i'
please contact me.
Very truly
- ours, Donald F.
Schnell WEK/kea i
'1 1
1 c
- m
m
- s..;
~
1 1
)
STATE OF MISSOURI )
J
)
Donald F.
Schnell, of lawtul age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing i
document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information nnd belief.
By
.?k j Donald F.
Scfinell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this day of [ba/u,198f
/ b @/g PhAF DARBARA NOTARY PUBtlC, STATE 0F MISSOURI MY COMMISSION E*PIRES APRIL 22, 1993 ST. LOUIS COUNTY
(
4
\\
(vmK:
~
i C.
,0
.~
or*
,4 cc Gerald Charnoff, Esq.
'Shaw, Pittman, Potts & Trowbridge 2300 N.
Street', N.W.
Washington, D.C.
20037 Dr. J. O. Cermak CFA, Inc.
4 Professional Drive (Suite 110)
Gaithersburg, MD 20879 x
R. C. Knop Chief, Reactor Project Branch 1
'l U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office.
U.S. Nuclear Regulatory Commission
, RRil-Steedman, Missouri 65077 Tom Alexion (2) l Office of Nuclear Reactor Regulation U.S.: Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 55102 5
+