Submits Corrected Wording to Encl to Supporting 10CFR50,App J Exemption to Allow Leak Chase Plugging During Integrated Leak Rate Test
ML19325C925
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/04/1989
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2088, NUDOCS 8910180123
Download: ML19325C925 (3)


Text

pi m~

j y;-~=

pg s

~

y.

f; -i

  • 190h 90!iot$1 met 5 bi; ' ve!

, Post Otta Box 149:

I St. Louis, Muouri63166

-.,m

e L3sq.s54.yS50 >

in 1

Y

- v-r w,

q.

o i

October;?4,'1989 Mfjf4

'43 U S... Nuclear? Regulatory. Commission v

Attnt. Document Control Desk Mail Station Pl-137 a-Washington, D.C.

20555 ULNRC-2088 o

m, Gentlemen:-

(

DOCKET NO. 50-483 CALLAWAY PLANT INTERPRETATION TO-LEAVE LEAK CHASES i,

PLUGGED DURING AN INTEGRATED p"

LEAK' RATE TEST (ILRT)

Reference:

ULNRC-2083, dated September 29, 1989 s

The referenced letter provided information to support:

a-10CFR50, App. T exemption to allow leaving the' leak chases.

plugged'during'a Type A ILRT.. However, 'there was an-error on1Page 2 of the attachment (Page 2 off6, first:.,

should-read:

~

The corrected wordin; (as, underlined) complete, paragraph).

s In regard ~'to meeting the requirements of CC-2000 and 4000;;the containment liner was constructed to:the.

1974 code-(Division 1,. subsection NE)..Section NE-2000 is the same for welding material requirements with.the-exception that further restrictions on the use'of electro--

i

'slagsweldingEis introduced in the CC subsection.

This type of welding was not used on Callaway's liner and is therefore not.an issue.

The requirements' imposed by U

subsection CC-2000 for material certification and material

. testing of the-weld rods cannot be verified since there.

is'no safety related documentation for the non-safety:

'related welds.

(

We regret any inconveniences to the staff that this-

error,may'have caused in-their review of our exemption request.

If you have any questions, please contact us.

Si e el,,

a j

Dona F.

Schnell WEK/skh fol7 t

\\

8910180123 891004

.PDR ADOCK 050004B3 i

=P PNU

'e' "q,3 l 5 " 'c.

ll. 4,

  1. 1 9-

'ig

p

^

y

ccri-GeraldTCharnoff,:Esq.

~

Shaw,'P$ttman,.PottsL& Trowbridge-u

,~2300 N.-Street, N.W.

. Washington, D.C.

20037-Dr t J. O.:Cermak

,3 CFA, Inc.:

4'ProfessionalLDrive (Suite 110)

n Gaithersburg, MD 20879'
R.

C.' Knop Chief, Reactor Project Branch 1 U.S.

Nuclear Regulatory Commission

. Region III 799' Roosevelt Road LGlen'Ellyni Illinois 60137 Bruce Little Callaway1 Resident Office' U.S. Nuclear 1 Regulatory Commission RR#1' Steedman, Missouri ~65077 Tom Alexion (2)

Office of Nuclear-Reactor Regulation

'U.S.

Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21

.ll5551Rockville Pike Rocky.ille, MD 20852-t lManagerf Electric Department.

Missouri'Public Service Commission P.O. Box'360

~ Jefferson 1 City, MO 65102 t

9 t

i.

g.: ef' k

,(

bect D. Shafer/A160.761

/OA Record (CA-758) i Nuclear Date.

E210.01 DFS/ Chrono D. ' F. Schnell J. E.

Birk 1

J. V. Laux.

M. A. Stiller G. L. Randolph R. J.

Irwin H. Wuertenbaecher W. R. Campbell i

A. C. Passwater R.

P. Wendling j

D. E. Shafer-D. J. Walker

0. Maynard (WONC0) i

-N. P. Goel. (Bechtel)

T. P. Sharkey i

NSRB ' (Sandra Auston) i W,6~.

VA HL n m. b e m ee h r l'

i f

b i

^

,,. - - - -.,.. -, -, - -