ML20005E816
| ML20005E816 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/03/1990 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-89-002, IEB-89-2, NUDOCS 9001110111 | |
| Download: ML20005E816 (4) | |
Text
pe m.
1901 Grotrot Streci Post Offee Ba 149 i'
St. lows. Mrssasti C3t&G
~ 314 554 2650 t
0 I
l' Donaldf. Schnell January 3, 1990 sero v,x pec3 ment p
C-1 Mdem hbl F
U.S. Nuclear R9gulatory Commission n
Attn Document Control Desk i
Mail Station Pl-137 r
Washington, DC 20555 ULNRC-2135 L
Gentlemen DOCKET NUMBER 50-483 CALLAWAy PLANT STRESS CORROSION CRACKING OF HIGH-HARDNESS TYPE 410 STAINLESS-STEEL INTERNAL PRELOADED BOLTING IN ANCHOR DARLING MODEL S350W SWING CHECK VALVES OR VALVES OF SIMILAR DESIGN
Reference:
NRC Bulletin No. 89-02, dated July 19, 1989 NRC. Bulletin No. 89-02, Action Item I.A.
requested licensees to disassemble and inspect all safety-related Anchor Darling Model S350W swing check valves supplied with internal retaining block studs of ASTM specification A193 grade B6 type 410 stainless steel, and all other safety-related check valves of similar
' design and material selection.
A review of our records indicates that Callaway Plant does not-have any Ancho.r Darling Model S350W swing check valves or any check valves of similar design and material selection that would require disassembly and inspection.
5 If there are any questions concerning this matter, please contact me.
Very truly ou 4hb Donald F.
Schnell DFS/JMC/bjp i
I, ff l
C g.DP sass I
I \\
l
O, STATE OF MISSOURI )
)
i Donald F. Schnell, of lawful age, being'first duly sworn i
upon oath says that he is Senior Vice President-Nuclear and an t
i-officer of Union Electric Company; that he has read the foregoing f
document and knows the content thereof; that he has executed the L
same for and on behalf of said company with. full power and-authority to do so; and that the facts therein stated are true and-correct to the best of his knowledge, information and belief.
By Donald F. Sdhnell i
t-
~
Senior Vice President Nuclear i.
SUBSCRIBED and sworn to before mc this 32 day of
- f*#4*
1990.
fl ' -
IM DARBARA PIAFF W
NOTARY PUBUC, STAi[ OF MISSOURI WY COMMIS$10N EXPLRES APRll 22. 1993 ST. LOUIS COUNTY.
l.
s-i w
\\.
t g;
i cc Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Dr. J. O.
Cermak CFA, Inc.
i 4 Professional Drive (Suite 110)
Gaithersburg, MD 20879 j
l R.
C.
Knop Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission
' Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RRM1 Steedmam, Missouri 65077 Tom Alexion (2) i Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 l
11555 Rockville Pike Rockville,14D 20852 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102
b' I
bec D. Shafer/A160.761
/QA Record (CA-758)
Nuclear Date E210.01 DFS/ Chrono D.
F. Schnell J. E. Birk i
J. V. Laux M. A. Stiller d
G.
L. Randolph i
R.
J.
Irwin i
H. Wuertenbaecher W.
R. Campbell l
A.
C. Passwater R. P. Wendling D.
E.
Shafer D.
J. Walker O. Maynard (WCNOC)
N. P. Goel (Bechtel)
T. P.
Sharkey 1
NSRB (Sandra Auston)
.