ML19353B004

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC 891016 Ltr Re Results of Regulatory Effectiveness Review on 890918-21.Encl Withheld (Ref 10CFR73.21)
ML19353B004
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/04/1989
From: Schnell D
UNION ELECTRIC CO.
To: Holahan G
Office of Nuclear Reactor Regulation
References
ULNRC-2115, NUDOCS 8912110037
Download: ML19353B004 (2)


Text

_ -

J SAFEGUARDS INFORMATION WHEN SEPARATED FROM NRCg Dwe* g g g eg ENCLOSURES HANDLE THIS UC DOCUMENT AS DECONTROLLED Y _

Cataway Paqr December 4, 1989 Mr. Gary M. Holahan, Acting Director Division of Reactor Projects - III, IV, V, and Special Projects Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission

' Washington, D.C- . 20555 ULNRC-2115

Dear Sir:

DOCKET NUMBER 50-483

CALLAWAY PLANT UNIT 1 l FACILITY OPERATING LICENSE NPF-30 REGULATORY EFFECTIVENESS REVIEW RESPONSE This responds to-your. letter dated October 16, 1989-which trans-mitted the results of the Regulatory Effectiveness Review con-  ;

ducted at Callaway Plant during the period of September 18 l through 21,'1989. Our response to the report is prcianted in the ,

attachment. This response contains information which is subject '

to the provisions of-10CFR73.21 and is to be protected from i unauthorized disclosure.

Union _ Electric.has addressed the inspection team's concerns and -j will continue to enhance our capabilities to protect the plant against the design basis threat. If you have any questions regarding the response, or if additional information is required, please let me know, l

4 Very truly yours, 1 Donald F. Schnell CSP / pas l

Attachment (Safeguards Information)

SAFEGUARDS INFORMATION

$d21 co37 891204 WHEN SEPARATED FROM F DOCK 0500g3 ENCLOSURES HANDLE THIS /

DOCUMENT AS DECONTROLLED 0

$[ O' g ,

g uang mess: p.o w en rua. uo es2sr 90 - - _ -

SAFECUARDS INFORMATION ULNRC-2115 .,

WHEN SEPARATED FROM Page 2 i'l ENCLOSURES HANDLE 1His DOCUMENT AS DECONTROLLED I

cc: A. B. Davis - Regional Administrator, USNRC Region III R. W. DeFayette - Chief, Reactor Projects Section 3A, USNRC Region III T. W. Alexion - USNRC Licensing Project Manager (2 copies)

J. R. Creed - Chief, Safeguards Section, Region III Manager - Electric Department, Missouri Public Service Commission w/o B. H. Little - Senior Resident Inspector SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURES HANDLE THIS DOCUMENT AS DECONTROLLED