ML19332E988
| ML19332E988 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/30/1989 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEIN-87-019, IEIN-87-19, ULNRC-2116, NUDOCS 8912130237 | |
| Download: ML19332E988 (5) | |
Text
.
R p,'3x 3:
-i il; 1901 Chouteau A:enue l
Ibsr othce Box H9
- j -'
Si lms. M>ssoan 63166
\\
i 3:<ca n n n
s UNION November 30', -1989
- Eucenuc
$3l U.S. Nuclear Regulatory Commission p'
ATTN:
Document Control Desk i
Mail Station Pl-137 P
- Washington, D.C.
20555 I
Gentlemen:
4 i
ULNRC-2116 1
' DOCKET NUMBER 50-483 CALLAWAY PLANT J
INSPECTION OF HAFNIUM
-ROD CLUSTER CONTROL ASSEMBLIES (RCCA)
Callaway Plant Facility Operating License NPF-30
)
Condition 2.C.(4)' requires that UE perform a visual
' inspection of a sample of-hafnium rod cluster control 4
asseublies (RCCAs) during one of the first five refueling outages and that a summary of the results be enbmitted to the NRC.
An-inspection of all hafnium RCCAs was performed during Refuel-2 in the Fall of 1987. _The inspection used a combination of visual and eddy current tech-niques.
The eddy current technique represents a more quantitative inspection than the visual inspection required by the subject license condition.
The inspection results-indicated guide card fretting wear-as identified in.NRC Information Notice 87-19.
However, all RCCAs were considered acceptable for continued operation since at least 50% of the cladding cross sectional area remained at all axial locations along each RCCA rodlet.
At the beginning of Cycle-3, all RCCAs were axially repositioned to provide a new wear surface.for subsequent fretting wear, During Callaway Cycle-3, swelling of hafnium RCCAs o
was identified at other plants with Westinghouse supplied nuclear steam supply systems.
Although swelling was not identified at Callaway during the i
I Refuel-2 eddy current inspection, UE made a decision to replace all hafnium RCCAs with Silver-Indium-Cadmium RCCAs during Callaway Refuel-3.
Replacement was completed in the Spring of 1989.
b0 01\\o
'8912130237 891130 F
EDR-ADOCK 05000483:
E PNU
r.
v
.-c. _
J'? :
.e.
.The information provided herein closes Callaway
!=
License Condition 2.C.(4).
If there are additional questions. relating to Callaway RCCA experience, please contact us.
Very truly yours, r
Y' Donald F.
Schnell DS/dvd 5
I
r-1 A
STATE OF MISSOURI )
)
Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an-officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the
(
best of his knowledge, information and belief.
By Donald F.
Schnell Senior Vice President i
Nuclear i
SUBSCRIBED and sworn to before me this Jdhdayof 1987 D/
i V'
f BARBARA J PFAFF NOTARY PUBLIC, STATE Of MISSOURI i
MY COMMISSION EXPIRES APRIL 22, 1993 l
ST. LOUIS COUNTY l
l l
l l -.
l l
l I
P
~
- 1 l-f. j~ -i Y,
V.a 4
E cc s. Gerald:Charnoff, Esq.
Shaw,.Pittman, Potts & Trowbridge 2300 N.. Street, N.W.
Washington, D.C.
~20037 Dr. J. O. Cermak.
3 CFA, Inc.
ll Professional Drive (Suite 110)
Gaithersburg, MD 20879
-R.
C; Knop Chief, Reactor Project Branch 1 U.S.
Nuclear Regulatory Commission v
Region III 799 Roosevelt Road Glen Ellyn,' Illinois 60137 Bruce Little Callaway Resident Of fice U.S. Nuclear Regulatory Commission
.RRil q
Steedman, Missouri 65077
' Tom 1 Alexion-(2)
Office of Nuclear Reactor Regulation U.S. Nuclear-Regulatory Commission-1 White Flint, North, Mail Stop 13E21
+
11555 Rockville Pike JRockville, MD 20852 Manager, Electric Department t
Missouri Public Service Commission P.O.. Box 360 Jefferson City, MO 65102 H
l l.
'~
t l
L l
r
I
.m CI bec:
D. Shafer/A160.761
/0A Record (CA-758)
Nuclear Date E210.01
.DFS/ Chrono D.
F. Schnell J.
E. Birk J. V. Laux M. A.
Stiller G.
L'. Randolph R.
J.
Irwin H. Wuertenbaecher W.
R. Campbell A. C. Passwater-R.
P. Ifendling D.
E. Shafer D.
J. Walker O. Maynard (WCNOC)
N. P. Goel (Bechtel)
T. - P. Sharkey NS RB (Sandra Auston)
L i
l l
i i
.