Revises Util 790618 Response to 790525 Ltr Re Fabrication History of Feedwater Piping
ML19242A133
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/24/1979
From: Counsil W, Fee W
NORTHEAST UTILITIES
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7907310339
Download: ML19242A133 (2)


Text

.

s Ii10IrrHl!JL'iT UTII.ITil!'i

[ P O nOX 270

} H AR T F ofFT CoNNE CTICUT 06101 i (203) (4/> 6911 I L I J July 24, 1979 Docket No. 50-336 Director of Nuclear Reactor Regulation Attn: Mr. R. Reid , Chief Operating Reactors Branch #4 U. S. :;uclear Regulatory Commission Washington, D. C. 20555

References:

(1) V. Stello, Jr. , letter to All PWR Liceneces dated May 25, 1979.

(2) W. G. Counsil letter to R. Reid dated June 18, 1979.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Feedwater Lines Pursuant to 10CFR50. 54 (f) , the NRC Staff requested, (Reference (1)) , informa tion regarding t'te design, f abrication history, and inspection of feedwater lines at Millstone Unit No. 2.

In response to that request, Northeast Nucleer Energy Company (NNECO) docketed Reference (2), which addressed each of the Ref erence (1) concerns.

Subsequent review has determined that the response to Item 5 on Page 7, regarding fabrication history of the feedwater piping, should be revised as indicated below.

"A Charpy V-notch NDTT temperature of +20 F was specified for the 18" Schedule 60 pipe class EBB piping inside the contain-ment penetration sleeves. The minimum absorbed energy was in accordance with N-421 of the ASME III Code."

t 1, ,

f

' ~

, 'N (b 790731033?

a

. We trust you fir.d this information satisfactory in response to Item 5 of Reference (1).

Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY

'?

in

./

gr( /' 6l< s W. G. Counsil Vice President ,

,, .- /-

By: - -

W. F. Fee Vice President

=