Forwards Amend 25 to FSAR for Shearon Harris Nuclear Power Plant,Unit 1.Section 14.2.7 & 14.2.12 Revised to Reflect Util,Inpo & NRC Concerns Re Startup Physics Tests. Justification for Revs Also Encl
ML18019A649
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/12/1986
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A650 List:
References
NLS-86-042, NLS-86-42, NUDOCS 8603180091
Download: ML18019A649 (14)


Text

@Std Carolina Power & Light Company MN 1 3 1986 SERIAL: NLS-86-002 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 FSAR AMENDMENT NO. 25

Dear Mr. Denton:

Carolina Power R Light Company (CPdcL) hereby transmits Amendment No. 25 to the Shearon Harris Nuclear Power Plant (SHNPP) Final Safety Analysis Report (FSAR). The attachment lists all changes to the FSAR by FSAR section. The major changes involve FS'AR consistency reviews and clarifications/exceptions to Regulatory Guide1.68, Rev. 2, Initial Test Program, for water-cooled nuclear power plants detailed in Section 10.2.7 of the FSAR.

Sections Irl..2.7 and 10.2.12 have been revised to reflect CPRL, INPO, and NRC concerns about Start-up Physics Tests which place the plant in abnormal operating configurations and are not necessary to substantiate the adequacy of SHNPP standard core design and plant features. The tests which may lead to adverse radial and axial power tilting are being deleted based on the SHNPP standard core design and plant features and the recent successful demonstration of those tests by other similar Westinghouse 3-loop pressurized water reactors. Changes to Section 10.2.7 are included in this amendment package; changes to Section 10.2.12 will be included in the next amendment.

Each revised page bears the amendment number and technical changes are indicated by vertical bars in the page margin. Instructions for entering the revised pages are included.

Bg0318009i. 8+50030pq 0 0 PDR ADOCK 0 @DR gtO 411 Fayettevilte Street o P. O. Box 1551 o Rateigh. N. C. 27602

Qr. H. R. Denton NLS-86-002/Page 2 Should you have any questions regarding this amendment, please contact Mr. 3im Kloosterman of our Nuclear Licensing Section staff at (919) 836-8055.

Yours very truly, A. B. Cutter - Vice President Nuclear Engineering R Licensing, ABC/CGL/1js (3332CGL)

Attachment CC: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB)

Wake County Public Library Mr. 3. L. Kelley (ASLB)

Mr. H. A. Cole A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power R Light Company.

My commission expires: //kg july Notary ea e

9

<B~~

~

'+

Il~~~llptg 9+'e

~

NOTARy 4

.~:. PUBLlC:.>.

r + ee es ~ s

~4te ~ Ieai~

/ ~

qqllSl lf$ f~~ 'L yA

~~

q Q,fl,g e l yergfAN

~4 ~ <<g e Ib

~ \

e VI +~onses+"

j $ phQQQ+

~4'glll

FSAR SECTION(S) 3USTIFICATION 1.2.2, 1.3.1 Clarifications are made to provide consistency within the FSAR.

1.0.2 A revision is made concerning applicants for operating licenses.

2.1.2 Revisions are made concerning activities unrelated to plant operation within the exclusion area.

2.3.1, 2.3.2, Revisions are made to provide the most recent data.

2.3.3 2.5.0 Clarifications are made to provide consistency within the FSAR.

2.5.1, 2.5.2 Vertical datum designation for site elevation is revised to provide consistency between the FSAR and Technical Specifications.

3.5.1, 3.5.3, Clarifications are made to provide consistency within the FSAR.

3.6.1, 3.6A, 372 373 3.7.0 3.8.1, 3.8.2, Clarifications are made to provide consistency within the FSAR.

3.8.3, 3.8.0 3.8.0 Revision are made to reflect current design.

3.8.0 Clarifications are made to provide consistency within the FSAR text and figures.

3.8.5, 3.8A, Clarifications are made to provide consistency within the FSAR.

3.8B, 3.9.1, 3.9.6, 3.9A 3.9.6.2 A revision is made to provide consistency between the FSAR and Technical Specif ications.

3.10.1 Clarifications are made to provide consistency within the FSAR.

3.10.1, 3.1 1.0 Revisions are made to reflect current design.

3.10.0, 3.1 1.0, Clarifications are made to provide consistency within the FSAR.

3.1 1.1, 3.1 1.0, 3.11A, 0.2.1, 0.2.2 0.2.0 Revisions are made to clarify Westinghouse's responsibilities concerning vendor control.

0.3.2, 0.3.3 Clarifications are made to provide consistency within the FSAR.

0.0.6 A revision is made to reflect current design.

5.0.1 A revision is made to reflect current procedure.

(3334NLU/pgp)

FSAR SECTION(S) 3USTIFICATION 5.0.7 A revision is made to reflect current design.

5.0.12) 5.0.13, Clarifications are made to provide consistency within the FSAR.

6.1.2 6.2.2 Revisions are made to reflect current design.

6.2.2.3 Revisions are made to provide consistency between the FSAR and Technical Specif ications.

6.2.2 Tables are revised to reflect current design.

6.2.2, 6.2.0 Clarifications are made to provide consistency within the FSAR.

6.2.0, 6.2.5.2 Revisions are made to provide consistency with current design.

6.'2.5 Clarifications are made to provide consistency within the FSAR.

6.0.2, 6.5.2 Revisions are made to reflect current design.

6.0.2, 6.0.3, Clarifications are made to provide consistency within the FSAR.

6.5.2, 6.6 7.1.1, 7.1.2, Clarifications are made to provide consistency within the FSAR.

7.2.1 7.2.1.2 Revisions are made to provide consistency between the FSAR and Technical Speci fications.

7@2@2~ 7o2o3) Clarifications are made to provide consistency within the FSAR.

7.3.1, 7.3.2, 7.0.0, 7.0.2, 7.6.1, 7.6.2, 7.7.1, 7.7.2 8.1.1, 8.2.2 Revisions are made to reflect current data.

9.1.1, 9.1.2, Revisions are made to reflect current design.

9.1.3, 9.1.0 9.2.2 Revisions are made to provide consistency within the FSAR.

9.2.6 Revisions are made to provide consistency between the FSAR and Technical Specifications.

9.3.2 A revision is made to reflect current design.

9.3.7 Revisions are made to clarify system descriptions.

9.0.1, 9.0.2, Revisions are made to reflect current design.

9.0.3, 9.0.0, 9.0.5, 9.0.7 (3334NLU/pgp )

FSAR SECTION(S) 3USTIFICATION 9.5.1 Revisions are made to reflect current design and provide consistency within the FSAR.

9.5.1.1 Text and tables are revised to reflect current data.

9.5.1.5, 9.5.2, Revisions are made to reflect current design.

9.5.2.3, 9.5.2.4 9.5.0 Revisions are made to provide consistency between the FSAR and Technical Specifications.

9.5.0 Clarifications are made to provide consistency within the FSAR.

9.5.5, 9.5.7, Revisions are made to reflect current design and to provide 9.5A clarity.

10.2.3 Revisions are made to provide consistency within the FSAR and to reflect current design.

1 1.2.3, 12.1.1 Clarifications are made to provide consistency within the FSAR.

12.2.1 Revisions are made to reflect current design.

12.2.2 Clarifications are made to provide consistency within the FSAR.

12.3.1 A revision is made to reflect current requirements.

1 2.3.2, 12.0.1, Clarifications are made to provide consistency within the FSAR 12.5.1, 12.5.2 and reflect current design.

12.5.3 A revision is made to reflect current procedure.

13.1.2, 13.1.3, Clarifications are made to provide consistency within the FSAR.

13.5.2, 10.2.7 15.0.3, 15.0.6 Revisions are made to provide consistency between the FSAR and Technical Specifications.

15.0.9, 15.0A.1, Clarifications are made to provide consistency within the FSAR.

15.2.8, 15.0.I, 15.0.3, 154.6, 15.0.7 15.0.8 Revisions are made to provide consistency within the FSAR and reflect current design.

15.6.2, 15.6.3, Clarifications are made to provide consistency within the FSAR.

15.6.5, 15.7.2, 15.7.0, 17.2.19)

TMI-15, TMI-35 (3334NLU/pgp)

COLL Carolina Power 8 Light Company NR 1 31986 SERIAL: NLS-86-002 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I - DOCKET NO.50-000 FSAR AMENDMENT NO. 25

Dear Mr. Denton:

Carolina Power rent: Light Company (CPdcL) hereby transmits Amendment No. 25 to the Shearon Harris Nuclear Power Plant(SHNPP) Final Safety Analysis Report (FSAR). The attachment lists all changes to the FSAR by FSAR section. The major changes involve FSAR consistency reviews and clarifications/exceptions to Regulatory Guide 1.68, Rev. 2, Initial Test Program, for water-cooled nuclear power plants detailed in Section 10.2.7 of the FSAR.

Sections 10.2.7 and 10.2.12 have been revised to reflect CPRL, INPO, and NRC concerns about Start-up Physics Tests which place the plant in abnormal operating configurations and are not necessary to substantiate the adequacy of SHNPP standard core design and plant features. The tests which may lead to adverse radial and axial power tilting are being deleted based on the SHNPP standard core design and plant features and the recent successful demonstration of those tests by other similar Westinghouse 3-loop pressurized water reactors. Changes to Section 10.2.7 are included in this amendment package; changes to Section 10.2.12 will be included in the next amendment.

Each revised page bears the amendment number and technical changes are indicated by vertical bars in the page margin. Instructions for entering the revised pages are included.

QWVMMQÃ8iki .+.;;

411 Fayettevilte Street ~ P. O. Box 1551 ~ Raleigh. N. C. 27602

~Pi% *~AMNM~m

Mr. H. R. Denton NLS-86-002/Page 2 Should you have any questions regarding this amendment, please contact Mr. 3im Kloosterman of our Nuclear Licensing Section staff at (919) 836-8055.

Yours very truly, A. B. Cutter - Vice President Nuclear Engineering R Licensing ABC/CGL/ljs (3332CGL)

Attachment Ccs Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-Rll) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G.,O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB)

Wake County Public Library Mr. 3. L. Kelley (ASLB)

Mr. H. A. Cole A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power dc Light Company.

My commission expires: ///4'7/Py Notary ea ~Q

~

'+

illlltll<>

NOTARY rr PUQQfQ t e s r +. ~ reeeee er ~pe lllllllHlii

FSAR SECTION(S) 3USTIFICATION 1.2.2, 1.3.1 Clarifications are made to provide consistency within the FSAR.

1.0.2 A revision is made concerning applicants for operating licenses.

2.1.2 Revisions are made concerning activities unrelated to plant operation within the exclusion area.

2.3.1, 2.3.2, Revisions are made to provide the most recent data.

2.3.3 2.5.0 Clarifications are made to provide consistency within the FSAR.

2.5.1, 2.5.2 Vertical datum designation for site elevation is revised to provide consistency between the FSAR and Technical Specifications.

3.5.1, 30503$ Clarifications are made to provide consistency within the FSAR.

3.6.1, 3.6A, 30702$ 30743$

3.7.0 3.8.1, 3.8.2, Clarifications are made to provide consistency within the FSAR.

3.8.3, 3.8.0 3.8.0 Revision are made to reflect current design.

3.8.0 Clarifications are made to provide consistency within the FSAR text and figures.

3.8.5, 3.8A, Clarifications are made to provide consistency within the FSAR.

3.8B, 3.9.1, 3.9.6, 3.9A 3.9.6.2 A revision is made to provide consistency between the FSAR and Technical Specifications.

3.10.1 Clarifications are made to provide consistency within the FSAR.

3.10.1, 3.1 1.0 Revisions are made to reflect current design.

3.10.0, 3.1 1.0, Clarifications are made to provide consistency within the FSAR.

3.1 1.1, 3.1 1.0, 3.1 IA, 0.2.1, 0.2.2 0.2.0 Revisions are made to clarify Westinghouse's responsibilities concerning vendor control.

0.3.2, 0.3.3 Clarifications are made to provide consistency within the FSAR.

0.0.6

~ ~ A revision is made to reflect current design.

5.0.1 A revision is made to reflect current procedure.

(3334NLU/pgp )

I i

~ '

I

FSAR SECTION(S) 3VSTIFICATION 5.0.7

~ ~ A revision is made to reflect current design.

5 0.12, 5.0.13, Clarifications are made to provide consistency within the FSAR.

6.1.2 6.2.2 Revisions are made to reflect current design.

6.2.2.3 Revisions are made to provide consistency between the FSAR and Technical Specif ications.

6.2.2 Tables are revised to reflect current design.

6.2.2, 6.2.0 Clarifications are 'made to provide consistency within the FSAR.

6.2.0, 6.2.5.2 Revisions are made to provide consistency with current design.

6.2.5 Clarifications are made to provide consistency within the FSAR.

6.0.2, 6.5.2 Revisions are made to reflect current design.

6.0.2, 6.0.3, Clarifications are made to provide consistency within the FSAR.

6.5.2, 6.6 7.1.1, 7.1.2, Clarifications are made to provide consistency within the FSAR.

7.2.1 7.2.1.2 Revisions are made to provide consistency between the FSAR and Technical Specif ications.

7 2 2g 7 2 3f Clarifications are made to provide consistency within the FSAR.

7.3.1, 7.3.2, 7.0.0, 7.0.2, 7.6.1, 7.6.2, 7.7.1, 7.7.2 8.1.1, 8.2.2 Revisions are made to reflect current data.

9.1.1, 9.1.2, Revisions are made to reflect current design.

9.1.3, 9.1.0 9.2.2 Revisions are made to provide consistency within the FSAR.

9.2.6 Revisions are made to provide consistency. between the FSAR and Technical Speci fications.

9.3.2 A revision is made to reflect current design.

9.3.7 Revisions are made to clarify system descriptions.

9.0.1, 9.0.2, Revisions are made to reflect current design.

9.0.3, 9.0.0, 9.0.5, 9.0.7 (3334NLU/pgp )

0 FSAR SECTION(S) 3USTIFICATION 9.5.1 Revisions are made to reflect current design and provide consistency within the FSAR.

~ 9.5.1.1 Text and tables are revised to reflect current data.

9.5.1.5, 9.5.2, Revisions are made to reflect current design.

9.5.2.3, 9.5.2.0 9.5.0 Revisions are made to provide consistency between the FSAR and Technical Specifications.

9.5.0 Clarifications are made to provide consistency within the FSAR.

9.5.5, 9.5.7, Revisions are made to reflect current design and to provide 9.5A clarity.

10.2.3 Revisions are made to provide consistency within the FSAR and to reflect cur rent design.

1 1.2.3, 12.1.1 are made to provide consistency within the FSAR.

I'larifications 12.2.1 Revisions are made to reflect current design.

12.2.2 Clarifications are made to provide consistency within the FSAR.

12.3.1 A revision is made to reflect current requirements.

12.3.2, 12.0.1, Clarifications are made to provide consistency within the FSAR 12.5.1, 12.5.2 and reflect current design.

12.5.3 A revision is made to reflect current procedure.

13.1.2, 13.1.3, Clarifications are made to provide consistency within the FSAR.

13.5.2, 10.2.7 15.0.3, 15.0.6 Revisions are made to provide consistency between the FSAR and Technical Specifications.

15.0.9, 15.0A. 1, Clarifications are made to provide consistency within the FSAR.

15.2.8, 15.0.1, 15.0.3, 15.0.6, 15.0.7 15.0.8 Revisions are made to provide consistency within the FSAR and reflect current design.

15.6.2, 15.6.3, Clarifications are made to provide consistency within the FSAR.

15.6.5, 15.7.2, 15.7.0, 17.2.19, TMI-15, TMI-35 (3334NLU/pgp)