PRIORITY 3.

(ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) sJ ACCESSION NBR:9509210307 DOC.DATE: 95/08/31 NOTARIZED: NO DOCKET g FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit, 2, Florida Power & Light Co. '05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

SAGER,D.A. Flor'ida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Aug 1995 for St Lucie Units 1 &

2.W/950914 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: AC 10 10 AEOD/SPD/RRAB 1 1 P"CENTE 1 1 1 NRR/DISP/PIPB 1 1

- .DT5M7PECB 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE i J H 1 1- NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

'(

P.O. Box 128, Ft. Piercrr, FL 34954-0128 L-95-259 10 CFR 50.36 September 14, 1995 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, attached are the August, 1995, Operating Status and Summary of Operating Experience Reports for St Lucie Units 1 and 2.

~

Should there be any questions on this information, please contact us.

Very truly yours, D. A. a er Vice P s ident St. Lu 'e Plant DAS/SL cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments 4"-~GEE 9S09210307 950831 PDR ADOCK 05000335

,R...., ,.an FPL Group PDR company

%*y N

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: September 13, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Au st 1995 Unit 1 was manually shut down for Hurricane Erin on August 1. The unit remained offline for the rest of the month to repair a reactor coolant pump (RCP) seal, to resolve problems with power operated relief valves (PORVs), and to cleanup the containment building following an inadvertent initiation of containment spray.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Luci.e ¹1 DATE Sept.7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 MONTH Au st 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/95 445 8/02/95 -26 8/03/95 -21 8/04/95 -5 8/05/95 -5 8/06/95 -5 8/07/95 -6 8/08/95 -8 8/09/95 -10 8/10/95 -24 8/11/95 -17 8/12/95 -12 8/13/95 -12 8/14/95 -12 8/15/95 -12 8/16/95 -22 8/17/95 -33 8/18/95 -32 8/19/95 -14 8/20/95 -9 8/21/95 -6 8/22/95 -7 8/23/95 -7 8/24/95 -7 8/25/95 "7 8/26/95 -9 8/27/95 -9 8/28/95 -10 8/29/95 -9 8/30/95 -9 8/31/95 -9

~ t

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335

~

UNIT NAME: ST LUCIE UNIT 1 DATE: September 13, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 0 MONTH No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icensee Down Event Report

¹ System Code'omponent Code'ause &, Corrective Action to Prevent Recurrence 8//I/95 27.1 H ¹9504 ZZZZZZ Unit I offline due to Hurricane Erin.

8/2/95 171.6 N/A CB PUMPXX Unit I offline to replace IA2 RCP seal.

8/9/95 188.5 ¹9505 CB VALVES Unit I offline due to PORV problems. A review of the adequacy of post maintenance testing of safety related equipment is being performed.

8/17/95 341.9 G ¹9507 SA VALVES Unit I offline due to inadvertent initiation of containment spray. Administrative controls are being implemented for initial use of procedures and operation with an operator work-around in place.

I 2 3 4 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Prepatation of Data Enny B - Maintenance or Test 2 - Manual Scnun Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training k License Examination 5 - Load Reduction F - Adminisnative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) oslsts FFL

~~

pi

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: September 13, 1995 COMPLETED BY: J'.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Au st 1995 Unit 2 was manually shut down for Hurricane Erin on August 1. The unit resumed operation on August 5. On August 15 unit 2 reduced power for backpressure control, repair of a heater drain pump solenoid valve, and waterbox cleans.ng. Unit 2 returned to full power on August 29.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to .the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Sept. 7, 1995 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 467-7296 MONTH Au st 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/95 339 8/02/95 -23 8/03/95 -32 8/04/95 -34 8/05/95 530 8/06/95 831 8/07/95 834 8/08/95 834 8/09/95 829 8/10/95 823 8/11/95 816 8/12/95 814 8/13/95 816 8/14/95 809 8/15/95 804 8/16/95 800 8/17/95 783 8/18/95 784 8/19/95 779 8/20/95 759 8/21/95 760 8/22/95 759 8/23/95 618 8/24/95 458 8/25/95 766 8/26/95 789 8/27/95 714 8/28/95 681 8/29/95 824 8/30/95 829 8/31/95 822

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 .

DATE: September 13, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 t

0 N No. Date Type Duration Reason'ethod of System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Reactor'icensee Down ¹ Prevent Recurrence 8/1/95 71.3 H ¹9504 zz zzzzzz Unit 2 offline due to Hurricane Erin.

8/4/95 14.1 A ¹9504 INSTRU Unit 2 offline for generator synchronization equipment repair.

8/23/95 0.0 N/A VALVES Unit 2 reduced power for heater drain valve.

8/25/95 0.0 N/A HTEXCH Unit 2 reduced power for waterbox cleaning.

10 8/28/95 0.0 N/A PUMPXX Unit 2 reduced power for heater drain pump repair.

I F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (exp! ain) I - Manual Prepatation of Data Enny B - Maintenance or Test 2 - Manual Sctam Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NVREG4161)

D - Regulatotjj restriction 4 - Continued E - Operator Training 4 License Examination 5 - Load Reduction F - Adminisnative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 09lsst FPI.