MONTHYEARL-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b2014-03-25025 March 2014 License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b Project stage: Request L-14-271, Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating2014-11-24024 November 2014 Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating Project stage: Request ML15002A3262015-01-0909 January 2015 Acceptance Review Concerning Revision to Battery Surveillance Test Frequencies (TAC No. MF5298)(L-14-271) Project stage: Acceptance Review ML15103A0062015-04-0909 April 2015 NRR E-mail Capture - NRC Staff'S LIC-109 Acceptance Review Results for Turkey Point Unit 3 Relief Request No. 1, Revision 1 - 5th 10-Year ISI Interval Project stage: Acceptance Review ML15096A0512015-04-13013 April 2015 Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies Project stage: RAI L-15-146, Response to Request for Additional Information Re Request to Amend Technical Specification 3.8.4, DC Sources - Operating.2015-05-12012 May 2015 Response to Request for Additional Information Re Request to Amend Technical Specification 3.8.4, DC Sources - Operating. Project stage: Response to RAI ML15103A4022015-05-26026 May 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval Project stage: Other ML15231A3912015-08-17017 August 2015 NRR E-mail Capture - Request for Additional Information Re. Turkey Point Unit 3 Relief Request No. 1, Revision 1 for 5th ISI Interval Project stage: RAI ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) Project stage: Approval L-2015-225, Inservice Inspection Plan - Fifth Inspection Interval Relief Request No. 1, Response to Request for Additional Information2015-09-15015 September 2015 Inservice Inspection Plan - Fifth Inspection Interval Relief Request No. 1, Response to Request for Additional Information Project stage: Response to RAI ML15271A3252015-10-14014 October 2015 Safety Evaluation for Relief Request No. 1, Revision 1 for Fifth 10-Year Inservice Inspection Interval - Repair of Pressurizer Stainless Steel Heater Sleeve Without Flaw Removal Project stage: Approval 2015-04-09
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18214A6672018-08-22022 August 2018 FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259) ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) ML16158A3312016-09-14014 September 2016 Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan ML16130A5362016-05-31031 May 2016 Issuance of Conforming Amendment Related to the Direct License Transfer of the Facility Operating License NPF-58 ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) ML15075A1392015-03-30030 March 2015 Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)2015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML15075A0912015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML13136A1432013-05-16016 May 2013 Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300 ML13051B1442013-05-0606 May 2013 Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 ML13017A4312013-04-18018 April 2013 Issuance of Amendment Revise Technical Specification 3.10.1, Inservice Leak, and Hydrostatic Testing Operation ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML1128602452011-10-17017 October 2011 Issuance of Amendment No. 160, Revise Technical Specification 3.8.1, AC Sources - Operating, Regarding Use of a Delayed Circuit as a Required Offsite Circuit (Emergency Circumstances) ML1125211222011-10-0404 October 2011 Issuance of Amendment Adoption of TSTF - 514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119203822011-08-29029 August 2011 Issuance of Amendment Cyber Security Plan 2023-09-29
[Table view] Category:Safety Evaluation
MONTHYEARML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) ML21063A1572021-03-0404 March 2021 Safety Evaluation for Alternative Request SR-2, Revision 0 Related to one-time Extension Snubbers Testing to ASME OM Code for the Fourth 10-year Inservice Interval at Perry Nuclear Power Plant Unit 1, Docket Nos. 50-440 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML19072A0122019-03-15015 March 2019 Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML17193A3822017-07-18018 July 2017 Correction to Safety Evaluation for License Amendment No. 177 ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) 2023-09-28
[Table view] Category:Technical Specifications
MONTHYEARML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21361A2172021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21307A1762021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17305A2132017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15243A1532015-09-0202 September 2015 Correction of Typographical Error Incurred During Prior License Amendment No. 162 ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-17017 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-13013 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1116608152011-06-16016 June 2011 Correction Letter License Amendment No. 157 L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 02010-12-15015 December 2010 License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0824608772008-08-28028 August 2008 Tech Spec Page for Amendment 150 TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process, Per the Consolidated Line Item Improvement Process ML0817503002008-06-19019 June 2008 TS Pages - Issuance of Amendment Revise TSs 3.6.1, 3.6.4 and 3.6.5 ML0811905752008-04-25025 April 2008 TS Pages - Issuance of Amendment No. TSTF-448, Revision 3, Control Room Habitability. ML0726808522007-09-18018 September 2007 License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0725505472007-09-0505 September 2007 License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation Device ML0721102792007-07-30030 July 2007 Tech Spec Pages for Amendment 147 to Clarify Technical Specification Requirements Related to Annulus Exhaust Gas Treatment (Aegt) System ML0719402902007-07-12012 July 2007 Technical Specifications, Issuance of Amendment ASTM Standards for Fuel Oil Testing ML0717704662007-06-22022 June 2007 Tech Spec Page for Amendment 145 Scram Discharge Volume Vent and Drain Valves ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0713403922007-05-0909 May 2007 Technical Specifications (Ts), Revise TS 5.5.7, Ventilation Filter Test Program, to Correct Referenced Flow Units ML0712005032007-04-30030 April 2007 Tech Spec Pages for Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits ML0712102912007-04-27027 April 2007 Technical Specifications, Issuance of Amendment Revise TS to Change the Frequency of the Mode 5 Intermediate Range Monitoring Instrumentation Channel Functional Test L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0700904852006-12-29029 December 2006 Application for a Technical Specification Improvement to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0629704472006-10-13013 October 2006 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0618700962006-06-30030 June 2006 Technical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 ML0615903492006-06-0101 June 2006 License Amendment Request - Revise Mode 3 Hot Shutdown Requirements to Add a Note Addressing Situations When Both Residual Heat Removal (RHR) Shutdown Cooling Subsystems Are Inoperable ML0615903292006-06-0101 June 2006 License Amendment Request - Revise Mode 4 Residual Heat Removal Shutdown Cooling Requirements to Add a Default Condition Addressing Situations When Condition a Cannot Be Met within Its Completion Time ML0605404392006-02-14014 February 2006 Amendment Request to Revise Technical Specification 3.3.1.1 Intermediate Range Monitoring Instrumentation Mode 5 Channel Functional Testing Surveillance Frequency from 7 Days to 31 Days ML0605306202006-02-10010 February 2006 License Amendment Request to Revise Required Action B.1 in the Emergency Core Cooling System Instrumentation Technical Specification to Be Consistent with the Improved Standard Technical Specifications ML0529903232005-10-14014 October 2005 Submittal of Technical Specification Bases, Revision 5 ML0522902522005-08-16016 August 2005 Tech Spec Pages for Amendment 136 Elimination of Monthly Operating Reports and Occupational Radiation Exposure Reports ML0512501942005-04-19019 April 2005 4/19/05, Perry - TS Pages - Issuance of Amendment Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509600872005-03-31031 March 2005 Tech Spec Pages for Amendment 134 Single Recirculation Loop Operation ML0504505712005-02-10010 February 2005 Tech Spec Pages for Amendment 133 Testing of Safety/Relief Valves ML0503503642005-02-0303 February 2005 Technical Specification Pages Revision of the Minimum Critical Power Ratio Safety Limit ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature ML0410400412004-03-31031 March 2004 License Amendment Request Pursuant to 10 CFR 50.90: Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process 2022-09-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17, 2015
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT CONCERNING TECHNICAL SPECIFICATION 3.8.4 "DC SOURCES- OPERATING" (TAC NO. MF5298) (L-14-271)
Dear Mr. Harkness:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 170 to Facility Operating License No. NPF-58 for Perry Nuclear Power Plant, Unit No. 1. The amendment consists of changes to the technical specifications (TSs) in response to your application dated November 24, 2014, as supplemented by letter dated May 12, 2015.
The amendment revises the battery capacity testing surveillance requirements in the TSs to reflect test requirements when the battery is near end of life.
A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, KUN~~~
Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Amendment No. 170 to NPF-58
- 2. Safety Evaluation cc w/encls: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION. LLC OHIO EDISON COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 170 License No. NPF-58
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for license fiied by FirstEnergy Nuclear Operating Company, et al. (the licensee, FENOC), dated November 24, 2014, as supplemented by letter dated May 12, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954. as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wili be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public, and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications (TSs) as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 170, are hereby incorporated into this license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance, and shall be implemented within 60 days of the date of issuance.
THE NUCLEAR REGULATORY COMMISSION D vid L. Pelton, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: August 17, 201 5
ATTACHMENT TO LICENSE AMENDMENT NO. 170 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT License NPF-58 License NPF-58 3.8-27 3.8-27
renewal. Such sale and leaseback transactions are subject to the representations and conditions set forth in the above mentioned application of January 23, 1987, as supplemented on March 3, 1987, as well as the letter of the Director of the Office of Nuclear Reactor Regulation dated March 16, 1987, consenting to such transactions. Specifically, a lessor and anyone else who may acquire an interest under these transactions are prohibited from exercising directly or indirectly any control over the licenses of PNPP Unit 1. For purposes of this condition the limitations of 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for PNPP Unit 1 remains in effect; these financial transactions shall have no effect on the license for the Perry Nuclear facility throughout the term of the license.
(b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the terms or conditions of any lease agreements executed as part of these transactions; (ii) the PNPP Operating Agreement; (iii) the existing property insurance coverage for PNPP Unit 1; and (iv) any action by a lessor or others that may have an adverse effect on the safe operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now and hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level FENOC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 170 are hereby incorporated into the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions
- a. FirstEnergy Nuclear Generation, LLC and Ohio Edison Company Amendment No. 170
DC Sources-Operating 3.8 4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8 4.8 -------------------NOTE-----------------
Credit may be taken for unplanned events that satisfy this SR Verify battery capacity is ~ 80% of the 60 months manufacturer's rating when subJected to a performance discharge test. ANO 12 months when battery shows degradation. or has reached 85%
of the expected life with capacity < 100%
of manufacturer's rat mg AND 24 months when battery has reached 85% of the expected life with capacity 2 100%
of manufacturer's rating PERRY - UN IT 1 3 8-27 Amendment No. 17o
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 170 TO FACILITY OPERATING LICENSE NO. NPF-58 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION, LLC OHIO EDISON COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440
1.0 INTRODUCTION
By application dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14328A665), as supplemented by letter dated May 12, 2015 (ADAMS Accession No. ML15149A163), FirstEnergy Nuclear Operating Company (the licensee or FENOC) requested changes to the technical specifications (TSs) for the Perry Nuclear Power Plant, Unit 1 (PNPP or Perry). The supplemental letter dated May 12, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC or Commission) staff's original proposed no significant hazards consideration determination as published in the Federal Register on March 17, 2015 (80 FR 13907).
The proposed change would revise TSs, Surveillance Requirement (SR) 3.8.4.8 frequencies for battery capacity testing to be consistent with the battery capacity testing frequencies recommended by the Institute of Electrical and Electronics Engineers (IEEE) Standard 450-1995, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications." The proposed changes would also add a note allowing credit to be taken for unplanned events that satisfy SR 3.8.4.8.
2.0 REGULATORY EVALUATION
The following NRC requirements and guidance documents are applicable to the NRC staff's review of the license amendment request (LAR):
General Design Criterion (GDC) 17, "Electric power systems," of Appendix A, "General Design Criteria for Nuclear Power Plants," to Title10, Part 50, of the Code of Federal Regulations (1 O CFR) requires, in part, that nuclear power plants have onsite and offsite electric power Enclosure 2
systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure.
GDC-18, "Inspection and testing of electric power systems," requires that electric power systems that are important to safety must be designed to permit appropriate periodic inspection and testing.
10 CFR 50.36(c)(3), "Technical Specifications," requires that TSs include SRs, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Regulatory Guide (RG) 1.129, "Maintenance, testing, and Replacement of vented Lead-acid storage batteries for nuclear power plants," provides guidance to manage battery degradation such that a battery in service would retain its readiness for supporting design-basis events.
RG 1.129 endorses with certain clarifying regulatory positions the IEEE Standard 450, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications."
NUREG-1434, "Standard Technical Specifications- General Electric Plants (BWR/6),"
Revision 4.
3.0 TECHNICAL EVALUATION
3.1 Background According to PNPP Updated Safety Analysis Report, Chapters 1 and 8, the plant consists of one 1,277 Mega Watts electric (net) operating unit, which generates power at 22 kilovolts (kV),
and one similar unit (Unit 2), which is not yet completed. The power from Unit 1 (and future Unit 2) is fed through an isolated phase bus to the unit's main transformer where it is stepped up to 345 kV and delivered to the adjacent 345 kV switchyard. The engineering safety feature loads for each unit are assigned to three independent load groups designated as Division 1, Division 2, and Division 3. Divisions 1 and 2 are redundant, while Division 3 supplies power for the high pressure core spray (HPCS) system. Each division includes a Class 1E 125-volt direct current (VDC) system, which consists of a battery, one or two battery chargers, a direct current (DC) load center, distribution panels, and associated equipment.
Maintenance tie buses are provided between the divisions associated with Units 1 and 2, and only connect the same divisions of the two units (Division 1, Division 2, and Division 3 of Unit 1 to Division 1, Division 2, and Division 3 of Unit 2, respectively). The maintenance tie bus circuit breakers are normally open and are manually operated under administrative control. These breakers permit isolation of the battery and normal battery charger associated with either Unit 1 or Unit 2 for purposes of maintenance, testing, or equalizing of the battery. If the DC batteries are the only available power sources, the maintenance tie circuit breakers may be closed to allow the Unit 1 and Unit 2 batteries to be paralleled. No other interdivisional ties are provided between the divisions associated with Unit 1 or Unit 2.
Each Division 1 or Division 2 Class 1E 125 VDC system is capable of supplying required DC power to associated loads needed for safe shutdown. Each system includes a 1260-amp-hour battery and a 400-amp battery charger. For Division 1, both Unit 1 and Unit 2 have identical 61-cell batteries. For Division 2, both Unit 1 and Unit 2 have identical 60-cell batteries. In addition, a 400-amp reserve battery charger is provided for each division. The reserve battery chargers are located with the equipment associated with Unit 1, but can be connected to the appropriate division of either the Unit 1 or Unit 2, Class 1E 125 VDC system by means of the maintenance tie buses.
The Division 3 Class 1E 125 VDC system is an independent and redundant system capable of supplying required DC power to the HPCS system logic, the Division 3 diesel generator control system, and other Division 3 DC controls. The system includes a 250-amp-hour battery and a 50-amp battery charger. For Division 3, both Unit 1 and Unit 2 have identical 60-cell batteries.
In addition, a 50-amp reserve battery charger is provided. The reserve battery charger is located with the equipment associated with Unit 1 but can be connected to the Unit 2, Class 1E 125 VDC system by means of the maintenance tie bus.
As stated in the LAR, the guidance in IEEE 485-1997, "IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications," was used for the design (loading, sizing, and capacity) of the Divisions 1, 2, and 3 Class 1E batteries.
The Class 1E batteries are maintained and tested in accordance with IEEE Standard 450-1995, which is a revision of IEEE Standard 450-1975 endorsed by RG 1.129. The IEEE Standard 450-1995 recommended frequencies for battery performance discharge test include a 24-month testing frequency when a battery reaches 85 percent of its expected life with capacity greater than or equal to 100 percent of manufacturer's rating. PNPP's current battery performance discharge test (SR 3.8.4.8) frequency does not align with IEEE Standard 450-1995 recommendations. The licensee proposed changes to SR 3.8.4.8 to correct this issue and take credit for unplanned events that satisfy the SR.
3.2 Proposed Changes The current SR 3.8.4.8 states:
Verify battery capacity is;:: 80% of the manufacturer's rating when subjected to a performance discharge test.
Frequency 60 months AND NOTE: Only applicable when battery shows degradation or has reached 85% of the expected life 18 months The licensee proposed changes to replace the current "18 month" frequency of SR 3.8.4.8 with frequencies recommended by IEEE Standard 450-1995, and add a note to allow credit to be taken for unplanned events that satisfy SR 3.8.4.8 consistently with NUREG-1434, "Standard Technical Specifications - General Electric Plants (BWR/6)," Revision 4, TS 3.8.6, "Battery
Parameters," SR 3.8.6.6.
The revised SR 3.8.4.8 would state:
1\l()TE::-------------------------------------
Credit may be taken for unplanned events that satisfy this SR Verify battery capacity is :::: 80% of the manufacturer's rating when subjected to a performance discharge test.
Frequency 60 months Al\ID 12 months when battery shows degradation, or has reached 85% of the expected life with capacity< 100% of manufacturer's rating.
Al\ID 24 months when battery has reached 85% of the expected life with capacity ::::
100% of manufacturer's rating.
3.3 Staff E::valuation A battery performance discharge test is a constant-current or constant-power capacity test done on a battery after it has been in service, to detect any change in the battery's capacity. The test is intended to determine overall battery degradation due to age and usage. According to IE::E::E::
Standard 450, degradation is indicated when the battery capacity drops more than 1O percent from its capacity on the previous performance test, or is below 90 percent of the manufacturer's rating. An annual performance test is recommended if the battery shows signs of degradation or has reached 85 percent of the service life expected for the application. If the battery has reached 85 percent of service life but still delivers a capacity of 100 percent or greater of the manufacturer's rated capacity, performance testing at two-year intervals is recommended.
These frequencies are incorporated into revision 4 of l\IURE::G-1434, TS SR 3.8.6.6 (Pl\IPP SR 3.8.4.8).
The proposed frequencies (12 months and 24 months) when the battery has reached 85 percent of its expected service life are consistent with the recommendations of IE::E::E:: Standard 450 and l\IURE::G-1434. Therefore, the l\IRC staff finds the proposed frequencies acceptable.
l\IURE::G-1434, TS SR 3.8.6.6 includes a note that states: "Credit may be taken for unplanned events that satisfy this SR." The licensee proposed to add this note to Pl\IPP TS SR 3.8.4.8.
The licensee stated that the note would allow control room staff to take credit for the SR performance when an emergent or unplanned activity requires performance of an associated SR 3.8.4.8 surveillance instruction (for example, battery capacity testing following maintenance or replacement). Taking credit for SR performance would reset the next required SR performance due date for that particular battery and prevent unnecessary cycling of plant equipment. The l\IRC staff finds that the proposed note does not change the intent of SR 3.8.4.8, is consistent with l\IURE::G-1434 TS SR 3.8.6.6, and therefore, is acceptable.
NUREG-1434, TS SR 3.8.6.6 includes a second note that prohibits performance of the SR in Mode 1 or 2, but allows portions of the surveillance to be performed to reestablish operability provided that an assessment determines that plant safety is maintained or enhanced. The licensee did not adopt the note because the current SR 3.8.4.8 does not include any mode restrictions or require any plant safety assessments to be performed when reestablishing operability of a battery. The licensee stated that the Unit 2 Class 1E batteries serve as backups to the operating Unit 1 Class 1E batteries such that the backup batteries substitute for the Unit 1 Class 1E batteries through maintenance tie buses to satisfy the operability requirements while maintenance, testing, or equalizing activities are being performed on the Unit 1 Class 1E batteries. Thus, SR 3.8.4.8 can be performed in any mode of operation and no plant safety assessment is needed to reestablish operability of the Unit 1 batteries. Based on this information, the NRC staff finds that the note for mode restrictions does not apply to PNPP Class 1E battery capacity testing, and therefore, its exclusion is acceptable.
NUREG-1434, TS SR 3.8.6.6 includes a provision that allows a modified performance discharge test to be performed for the SR. The licensee did not include this provision in SR 3.8.4.8. The staff finds that acceptable because the modified performance discharge test is an alternate test that is not required to meet the intent of the SR.
In the LAR, the licensee stated that the maintenance tie circuit breaker may be closed to allow the Unit 1 and Unit 2 Class 1E batteries to be paralleled if the DC batteries are the only available power sources. The NRC staff requested the licensee to address whether the impact of paralleling the Units 1 and 2 Class 1E batteries such as contribution of additional short circuit current from the Unit 2 batteries, protection coordination, and protective devices ratings among other factors has been considered in the design of Unit 1 125 VDC system. In its letter dated May 12, 2015, the licensee confirmed that factors (e.g., short circuit current, protection coordination, and protective device ratings) related to paralleling the Unit 1 and 2 Class 1E batteries were considered in the design of the Unit 1, Class 1E 125 VDC battery systems.
Based on this information, the staff finds that the Class 1E 125 VDC battery systems will perform their required safety functions when the Units 1 and 2 Class 1E batteries are paralleled without affecting the operation of their supported safety-related equipment.
3.4 Technical Conclusion The NRC staff reviewed the licensee's proposed changes to the TS battery capacity testing SR 3.8.4.8. The changes would revise the SR frequencies and add a note allowing credit to be taken for unplanned events that satisfy the SR. Based on the above technical evaluation, the staff concludes that the proposed TS changes provide reasonable assurance of the availability of required safety equipment needed to shut down the reactor and keep it in a safe condition following an accident. Furthermore, the staff finds that the proposed TS changes do not impact the licensee's continued compliance with 10 CFR 50.36(c) and GDC 17. Therefore, the staff concludes that, based on the current design of the PNPP Class 1E125 VDC battery systems, the proposed changes in the LAR are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or changes the surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (80 FR 13907). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: A. Foli Date of issuance:August 17, 201 5
ML15201A529 *see email from KGreen to DPelton 8/17/15 OFFICE NRR/DORL/LPL3-1 NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1 /LA NRR/DE/EEEB NAME JSchafler KGreen (SRohrer for) MHenderson JZimmerman DATE 7/24/2015 7/24/2015 7/21/2015 7/14/2015 OFFICE NRR/DSS/STSB* OGC NRR/DORL/LPL3-1 /BC NRR/DORL/LPL3-1/PM NAME RElliott BMizuno (NLO) DPelton KGreen DATE 7/28/2015 8/13/2015 8/17/2015 8/17/2015