MONTHYEARML0432202062004-04-0505 April 2004 License Amendment Request Pursuant to 10CFR50.90: Revision of the Minimum Critical Power Ratio Safety Limit Project stage: Request ML0425302482004-09-23023 September 2004 Request for Additional Information, Revise the Minimum Critical Power Ratio Safety Limit. TAC No MC2599 Project stage: RAI ML0428002672004-09-29029 September 2004 Submittal of Part 21 Final Report: Non-conservative SLMCPR Project stage: Request ML0435006052004-12-0606 December 2004 Response to a Request for Additional Information (RAI) Associated with a License Amendment Request for Revision of the Minimum Critical Power Ratio Safety Limit Project stage: Response to RAI ML0434906672005-01-0707 January 2005 Withholding from Public Disclosure, Response to Request for Additional Information (RAI) Associated with a License Amendment Request for Revision of the Minimal Critical Power Ratio Safety Limit, Dated 12/06/2004 Project stage: RAI ML0433501802005-01-0707 January 2005 Request for Withholding from Public Disclosure, Additional Information Regarding the Cycle Specific SLMCPR for Plant Unit 1 Cycle 10 Project stage: Other ML0503503642005-02-0303 February 2005 Technical Specification Pages Revision of the Minimum Critical Power Ratio Safety Limit Project stage: Other ML0500604382005-02-0303 February 2005 Issuance of Amendment Revision of the Minimum Critical Power Ratio Safety Limit Project stage: Approval 2004-09-23
[Table View] |
Similar Documents at Perry |
|---|
|
Text
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be < 23.8% RTP.
2.1.1.2 With the reactor steam dome pressure 2 785 psig and core flow 2 10% rated core flow:
The Minimum Critical Power Ratio (MCPR) shall be Ž 1.08 for two recirculation loop operation or 2 1.10 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be < 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs: and 2.2.2 Insert all insertable control rods.
PERRY - UNIT 1 2.0-1 Amendment No.'132