Letter Sequence Other |
---|
EPID:L-2020-LLA-0132, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (Approved, Closed) |
|
MONTHYEARML20198M4432020-07-16016 July 2020 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Request to Modify Technical Specification 3.3.3-1 Post Accident Monitoring Instrumentation Project stage: Acceptance Review L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-28028 September 2020 Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI Project stage: Request ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI Project stage: Other ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation Project stage: Approval 2020-07-16
[Table View] |
|
---|
Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 IR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 2024-09-09
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23188A0982023-07-17017 July 2023 – Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 – Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 – Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS – Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22235A7672022-09-0101 September 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22096A3162022-04-12012 April 2022 Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) 2024-09-13
[Table view] |
Text
October 8, 2020 Mr. David B. Hamilton Executive Vice President and Chief Nuclear Officer Energy Harbor Corporation 168 E. Market Street Akron, OH 44308-2014
SUBJECT:
ENERGY HARBOR NUCLEAR CORP. - DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; PERRY NUCLEAR POWER PLANT, UNIT NO. 1; AND BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2;- REQUEST TO USE A PROVISION OF A LATER EDITION OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE, SECTION XI (EPID L-2020-LLA-0132)
Dear Mr. Hamilton:
By application dated September 28, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20273A290), pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, "Codes and standards," paragraph (g)(4)(iv), and U.S.
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," Dated July 28, 2004, Energy Harbor Nuclear Corporation (Energy Harbor, the licensee) submitted a request to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), Perry Nuclear Power Plant, Unit No. 1 (PNPP), and Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS). Specifically, Energy Harbor Nuclear Corp. requests approval to use IWA-4540(b) of the 2017 Edition of the ASME B&PV Code.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Energy Harbor has adequately addressed the requirements in 10 CFR 50.55a(g)(4)(iv). Therefore, the NRC staff approves the use of subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, for Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1, and Beaver Valley Power Station, Unit Nos. 1 and 2. For each facility, this approval is for the remainder of the current 10-year inservice inspection interval, as specified in the application.
All other ASME BPV Code,Section XI, requirements which are not modified by the NrC staff approval of the licensees request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
D. Hamilton If you have any questions, please contact Bhalchandra Vaidya at 301-415-3308 or via e-mail at Bhalchandra.Vaidya@nrc.gov.
Sincerely, Nancy L. Digitally signed by Nancy L. Salgado Date: 2020.10.08 10:57:58 -04'00' Salgado Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346, 50-440.
Enclosures:
Safety Evaluation cc: Listserv DAVIS-BESSE PERRY BEAVER VALLEY Terry J. Brown Frank R. Payne Rod L. Penfield Site Vice President Site Vice President Site Vice President Energy Harbor Nuclear Corp. Energy Harbor Nuclear Corp. Energy Harbor Nuclear Corp.
Davis-Besse Nuclear Power Station Perry Nuclear Power Plant Beaver Valley Power Station Mail Stop P-DB-3080 Mail Stop P-PY-A290 Mail Stop P-BV-SSB 5501 N. State Route 2 PO Box 97, P.O. Box 4, Route 168 Oak Harbor, OH 43449-9760 Perry, OH 44081-0097 Shippingport, PA 15077-0004
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST TO USE A PROVISION OF A LATER EDITION OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE FOR ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION LLC DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 DOCKET NOS. 50-346 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NOS. 50-440 BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412
1.0 INTRODUCTION
By application dated September 28, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20273A290), Energy Harbor Nuclear Corporation (Energy Harbor, the licensee) submitted a request to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), Perry Nuclear Power Plant, Unit No. 1 (PNPP), and Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv),
Energy Harbor proposed to use subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, in place of the corresponding subparagraph from the code of record at these facilities.
Enclosure
2.0 PROPOSED USE OF SUBSEQUENT CODE EDITION AND ADDENDA 2.1 Components for Which the Subsequent Code Edition is Requested All Class 1, 2, and 3 items located in the ASME BPV Code,Section XI, boundaries.
2.2 Current Code Requirement Subparagraph IWA-4540(b) provides items that are exempt from pressure testing after repair/replacement activities.
2.3 Current Code Edition and Addenda of Record The application identified the currently applicable editions and addenda of the ASME BPV Code,Section XI, for each plant, as shown in Table 1 below. In addition, Table 1 shows the associated 10-year inservice inspection (ISI) interval, including the start and end dates, for each plant.
Table 1: Current ASME BPV Code,Section XI, Code of Record ISI ASME BPV CODE, PLANT START END INTERVAL SECTION XI Beaver Valley Power 2013 Edition, No 5th 8/29/2018 8/28/2028 Station, Unit No. 1 Addenda Beaver Valley Power 2013 Edition, No 4th 11/5/2018 8/28/2028 Station, Unit No. 2 Addenda Davis-Besse Nuclear 2007 Edition, through Power Station, Unit 4th 9/21/2012 9/20/2022 2008 Addenda No. 1 Perry Nuclear Power 2013 Edition, No 4th 5/18/2019 5/17/2029 Plant, Unit No.1 Addenda 2.4 Proposed Subsequent Code Edition and Addenda The proposed subsequent Code edition and addenda to be used is subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI.
2.5 Duration of the Use of the Later Code Edition and Addenda The duration of this request is for the remainder of the current 10-year ISI interval for each plant, as shown in Table 1 above.
3.0 REGULATORY EVALUATION
The licensee is proposing to use a portion of a later edition and addenda of the ASME BPV Code,Section XI, in accordance with 10 CFR 50.55a(g)(4)(iv), which states:
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in
paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
Given that 10 CFR 50.55(g)(4)(iv) permits the NRC staff to approve the use of subsequent editions and addenda of the ASME BPV Code,Section XI, the NRC staff finds that, subject to the following technical evaluation, the licensee may propose to use a portion of a later edition and addenda of the ASME BPV Code,Section XI, and the NRC staff has the regulatory authority to approve the use of a portion of a later edition and addenda of the ASME BPV Code,Section XI.
4.0 NRC TECHNICAL EVALUATION As previously stated in Section 3.0 of this safety evaluation, prior to approving the use of a subsequent edition and addenda of the ASME BPV Code under 10 CFR 50.55a(g)(4)(iv), the NRC staff must find that: (1) the proposed subsequent edition and addenda are incorporated by reference in 10 CFR 50.55a(a); (2) the licensee will comply with the conditions listed in 10 CFR 50.55a(b) that are applicable to the proposed edition and addenda of the ASME BPV Code; (3) the licensee requested approval to use the subsequent edition and addenda; and (4) if only portions of edition or addenda are to be used, all related requirements of the respective edition or addenda are met. If these criteria are met, the NRC staff can find the use of the subsequent edition and addenda of the ASME BPV Code,Section XI, to be acceptable.
4.1 Incorporation by Reference In evaluating the first criterion, 10 CFR 50.55a(b)(2) incorporates by reference the ASME BPV Code, 2017 Edition,Section XI, Division 1, as approved in Federal Register Notice, 85 FR 26540, dated May 4, 2020. The licensee proposed to use the 2017 Edition of Section XI, which is included in the list of editions and addenda incorporated by reference in the current edition of 10 CFR 50.55a(a). Therefore, the NRC finds that the first criterion has been satisfied.
4.2 Subject to Conditions Listed in 10 CFR 50.55a(b)
In evaluating the second criterion, the NRC staff finds that 10 CFR 50.55a(b) contains no conditions relevant to this request. Therefore, the NRC staff finds that the second criterion has been satisfied.
4.3 Requesting Commission Approval In evaluating the third criterion, the licensees request dated September 28, 2020, constitutes a request to the Commission for approval to use a subsequent edition or addendum of the ASME BPV Code. Therefore, the NRC staff finds that the third criterion has been satisfied.
4.4 All Related Requirements In evaluating the fourth criterion, the NRC staff finds that there are no related requirements relevant to this request. Therefore, the NRC staff finds that the fourth criterion has been satisfied.
4.5 Summary Based on the above evaluation, the NRC staff finds that the licensee has adequately addressed all regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv).
5.0 CONCLUSION
As set forth above, the NRC staff finds that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv). Therefore, the NRC staff finds that the use of subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, is acceptable. The NRC staff approves the use of subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, at Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1, and Beaver Valley Power Station, Unit Nos. 1 and 2.
For each facility, this approval is for the remainder of the current 10-year ISI interval, as listed in Table 1 above.
All other ASME BPV Code,Section XI, requirements which are not modified by the NRC staffs approval of the licensees request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Bhalchandra K. Vaidya, NRR Date: October 8, 2020
ML20279A440 (*) By Email OFFICE NRR/DORL/LPL3/PM* NRR/DORL/LPL3/LA* NRR/DNRL/NPHP/BC*
NAME BVaidya SRohrer MMitchell DATE 10/06/2020 10/05/2020 10/06/2020 OFFICE NRR/DORL/LPL3/BC* NRR/DORL/LPL3/PM*
NAME NSalgado BVaidya DATE 10/08/2020 10/08/2020