ML050960087
| ML050960087 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/31/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Macon W, NRR/DLPM,415-3965 | |
| Shared Package | |
| ML051010186 | List: |
| References | |
| TAC MC4224 | |
| Download: ML050960087 (2) | |
Text
Recirculation Loops Operating 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1 Either:
- a. Two recirculation
.matched flows; loops shall be in operation with OR b.
One recirculation loop shall be in operation with:
- 1. Thermal power s 2500 MWt:;
- 2. LCO 3.2.1 'AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)Y limits modified for single recirculation loop operation as specified in the COLR;
- 3. LCO 3.2.2 'Minimum Critical Power Ratio (MCPR) limits modified for single recirculation loop operation as specified in the COLR;
-limits modified for single loop operation as specified in the COLR; and
Instrumentation," Function 2.b (Average Power Range Monitors Flow Biased Simulated Thermal Power-High)
Allowable Value of Table 3.3.1.1-1 reset for single loop operation.
APPLICABILITY:
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Recirculation loop jet A.1 Declare the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> pump flow mismatch not recirculation loop within limits.
with lower flow to be
- -not
-in operation."
(conti-nued)
PERRY - UNIT 1 3.4-1 Amendment No. 134
Recirculation Loops Operating 3.4.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Thermal power B.1 Reduce thermal power 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
> 2500 M4t during to < 2500 MWt.
single recirculation loop operation.
C. Requirements b.2, b.3, C.1 Satisfy the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> b.4. or b.5 of the LCO requirements of the not met.
LCO.
D. Required Action and D.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated completion time of Condition A.
B. or C not met.
OR No recirculation loops in operation.
I PERRY - UNIT 1 3.4-2 (next page is-3.4-4)
Amendment No.13